BYRON NUCLEAR PONER STATION UNIT 1 MONTHLY PERFORMANCE REPORT C00840NWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 LICENSE NO. NPF-37 8512200412 851130 PDR ADOCK 05000454 R
ppg S& u\\
(0625N/62N) a
I.
Monthly Report for Byron Unit 1 A.
Summary of Operating Experience for Unit 1 The Unit was in a scheduled outage for the entire reporting period.
The outage began on October 25th and has continued on schedule through November. Startup is planned for December 16, 1985.
(0625N/62N)
~.
B.
OPERATING DATA REPORT i
DOCKET NO.: 050-454 j
UNIT: Byron One DATE: 12/09/85 COMPILED BY:
J.E. Langan TELEPHONE:
(815)234-5441 x2825 OPERATING STATUS 1.
Reporting Period: November 1985. Gross Hours: 720 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (We-net)
Max Dependable Capacity (We-net): NOT DETERMINED 3.
Power Level to Which Restricted (If Any): 1075 (MWe-gross) 4 j
4.
Reasons for Restriction (If Any): Excessive S/G Moisture Carryover I
THIS MONTH YR TO DATE CUMULATIVE j
5.
Number of Hours Reactor was Critical 0
953.5 953.5 6.
Reactor Reserve Shutdown Hours 0
0 0
7.
Hours Generator on Line 0
878.7 878.7 8.
Unit Reserve Shutdown Hours 0
0 0
{
9.
Gross Thermal Energy Generated (MWH) 0 2539701 2539701 j
- 10. Gross Elec. Energy Generated ( W H) 0 832508 832508 l
- 11. Net Elec. Energy Generated (MWH) 0 780512 780512
- 12. Reactor Service Factor 0
52.2 52.2
- 13. Reactor Availability Factor 0
52.2 52.2
- 14. Unit Service Factor 0
48.1 48.1
- 15. Unit Availability Factor 0
48.1 48.1 i
- 16. Unit Capacity Factor (Using MDC)
N/A N/A N/A
- 17. Unit Capacity Factor (Using Design MWe) 0 38.2 38.2
- 18. Unit Forced Outage Rate 0
9.0 9.0
- 19. Shutdowns Scheduled Over Next 6 Months (Scheduled outage is in progress.)
- 20. If Shutdown at End of Report Period, Estimated Date of Startup: 12/16/85 i
- 21. Units in Test Status (Prior to Commercial Operation): None l
- 22. Report Period Hours 720 1825 1825 1
- 23. Forced Outage Hours 0
86.5 86.5 f
FORECAST ACHIEVED Initial Criticality 1-25-85 2-2-85_
Initial Electricity Commercial Operation 1-85 9-16-85 (0625M/62M) 4
- -,,, _,.__., -,- -. - -- -_ ~
m._._
.. -.. _ _,.... - - ~... - - -. _. _. -.
C.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.: 050-454 UNIT: Byron One DATE:
12/09/85 COMPILI:D BY:
J.E. Langan TELEPHONE:
(815)234-5441 x2825 MONTH: November, 1985 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.
0 17.
0 2.
0 18.
0 3.
0 19.
0 4.
0 20.
0 5.
0 21.
0 6.
0 22.
0 7.
0 23.
0 8.
0 24.
0 9.
0 25.
0 10.
0 26.
0 11.
0 27.
0 12.
0 28.
0 13.
0 29.
0 14.
0 30.
0 15.
0 16.
O INSTRUCTIONS On this form list the average daily unit power level in We-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
(0625N/62N)
- eeeeeeeeeeeeeeeeeeeeee.
Report Period November, 1985 UNIT SHUTDOWNS / REDUCTIONS BYRON
- eeeeee**ee****eeeeee****
No.
Date h Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence 5) 85/10/26 S
139.8 D 1
None N/A N/A Scheduled outage for E.Q. Modifications and Steam Generator Modifications.
o cococeeeeeeeeee The Unit continued in a 7 week outage beginning October 25, 1985.
o Summary cococee********
TYPE Reason Method System & Component F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data ::ntry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Examination 9-Other (LER) File (NUREG-0161)
(0625M)
i, E.
UNIQUE REPORTING _ REQUIREMENTS 1.
Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT
, DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVE _NT None
\\
I f
5 i
'N 1
k s
4
\\
t 1
rs 1
.g v
I x
s
! \\
[
i 4.
(0625N/62N) i
\\'
1
+
4
~. +,,-
- 1. c -,
. ~,
- -.., ~,., -. -...,....., - - -,.
F.
LICE.'ISEE EVENT REPORTS The following is a tabular sumary of all licensee event reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, November 1 through November 30, 1985. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR t
50.73.
Licensee Event Report Number Date Title of Occurrence 85-061-01 11-26-85 Reactor Trip on Low Steam Generator Level due to Inadvertent Feed Pump Trip.
85-088-01 11-26-85
' Auto Start of OB VC M/U Fan.
85-090-00 11-04-85 Unit 1 Reactor Trip on Low Flow While Venting Flow Transmitter.
85-091-00*
10-31-85* Automatic Actuation of Auxiliary Building Charcoal Booster Fan due to Incorrectly Landed Relay.
85-092-00 11-15-85 Delayed Fire Watch due to Key.
Stuck in Vital Area Doorlock.
85-093-00 11-26-85 Weekly Battery Surveillance Performed Late Due to Personnel Error.
85-094-00 11-26-85 Automatic Actuation of VC Makeup Fan due to Iodine Detector Failure on Radiation Monitor l
OPR31J.
- Inadvertently omitted from October report.
(062SM/62M)
December 9,1985 LTR:
BYRON 85-1538 File:
2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Conunission Washington, D.C.
20555 ATTN:
Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period November 1 through November 30, 1985.
Very truly yours,
/
< dW R. E. Querio Station Manager Byron Nuclear Power Station REQ /JEL/bb Ecclosures cc:
J.G. Keppler, NRC, Region III NRC Resident Inspector Byron Gary Wright, Ill. Dept. of Nuclear Safety D.P. Galle, CECO T. J. Maiman D.L. Farrar, CECO Nuclear Fuel Services, PWR Plant Support G. R. Benson, Revenue Requirements INPO Records Center Thermal Group, Tech Staff Byron Station Nuclear Group, Tech Staff Byron Station J. Langan (0625M/62M)
(
Y
't i