ML20138M219
| ML20138M219 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 10/22/1985 |
| From: | Butler W Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20138M222 | List: |
| References | |
| NUDOCS 8510310586 | |
| Download: ML20138M219 (5) | |
Text
.__._ _
. - -..-_. - _ - = _ _
hsM*%g ei UNITED STATES
(,g NUCLEAR REGULATORY COMMISSION s, (
wasmNGTON. O C. 20555 g*...a i
i CUMt. HEALTH EDIS0ll COTIMn DOCKET N0. 50-373 LA SALLE COUNTY STATI0ft, UtlIT 1
/ PEP:CLEhT TO FACILITY OPERATING LICENSE l
I Arendrent No. 27 r
License fic, itPF-11 1.
The fluclear Regulatory Comissier (the Cctrission cr the hRC) havirs tound that:
A.
The applicaticn fcr arendrent filed by the Ccrrera.ealth Ecison i
Ccnpany, dated April 18, 1985, complies with the standards and j
requirements of the Atonic Er.crgy Act of 1954, as amended (the j
Act), and the Coninissien's regulations set forth in 10 CFh Chapter I;
)
8.
The f actitty will oparatu in confomity with the application, the i
provisions of the Act, and the regulations of the Ccnrijssion*
1 C.
There is reascnable assurance:
(1) that the activitics authorized by this arcr.c.1rit can be conducted withcut ercaigering the health I
and safety of the public, or,c (11) that such activities will tt cencLcted in ccepliance with the Cu.uission's regulations set forth j
in 10 CFR Chapter I; j
D.
The issuance of this arrendment will not be ininical to the comon defense and security or to the health and safety of the public; and i
1 E.
The issuance of this atendirent is in accordance with 10 CFR Part 51 of the Ccenission's regulations and all applicable requirerents have j
been satisfied.
i l
2.
Accordingly, the Itcense is amended by changes to the Technical Specifications as indicated in the attachrent to this license duendment and paragraph 2.C.(2) of Facility Operating License flo. NPF 11 is boreby acended to l
read as follcus j
(2) Technical $recificatient and Environranntal Protection Flan _
j i
The Technical Specifications contaire.d in Apper. dix A, as revised j
through Amendment No. 27 and the Envircrrental Protection Plan I
l contained in Appendix B, are huruby incorporated in the license.
l l
The licur.cee shall cperato the factitty iti u.curferre with the j
Techrical Specifications and thu Enytror.nental Protection Plan.
i 73 c
o 2-3.
This acerc'rcr.t is effective upon startup toilowir.g the first refueling outage.
FOR THE tiUCLEAR REGULATORY C0fft!SS10f4 Walter R. Butler, Chief Licensing Branch I;c. 2 Division of Licensirig Er.cicsure:
CNrcos to the Technical 5 p.Li f ica tictis Lata of Issuance:
October 22, 1995
4 CMCLOSURE TO LICENSE AfiENDPENT NO.
FACILITY OPERATING LICENSE NO. NPF-ll DOCKET NO. 50-373 l
Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages.
The revised pages are identified by Amendment nunber and contain a vertical line indicating the area of change.
REMOVE INSERT i
3/4 3-67 3/4 3-67 3/4 3-68 3/4 3-68 l
l i
I I
i l
+
TABLE 3.3.7.4-1 E
RDSTE SMUTD0hAI IGNITORING INSTESENTATION r-E MINIfRM INSTALSENTS INSTESENT OPERASLE e3
- 1.
Reacter Vessel Fressure 1
2.
Reacter Wessel Water Level 1
3.
LWR Flow 1
4.
Met Service W ter Flow 1
S.
SHR Service Wter Temperature 1
6.
RCIC Flow 1
4 7.
RCIC Turbine Speed 1
Y$
8.
Sgpression Pool h ter Level 1
9.
Suppression Pool hter Temperature 1
Y 8i
,8 7O u
t TABLE 4.3.7.4-1 I
R RDWTE SMITD0 TAI BWNITORING INSTRISENTATION SURVEILLANCE REQUIRDENTS i.
m CHAf81EL CMAfSIEL I
c-INSTRSENT CECK CALIBRATION 2.
1.
Reactor Wessel Pressure M
R
[
~
l 2.
Reacter Wessel Water Level M
R
{
l 3.
RNR Flow M
R t
4.
RNR Service W ter Flow M
R 5.
MIR Service hter Temperature M
R l
6.
RCIC Flow M
R l
r u
l s
l 7.
RCIC Turbine Speed M
R i
l m
I e
i 8.
Suppression Pool Water Level M
R 9.
Sgpression Pool Water Temperature M
R 1
i e
i l
f f
.Y
?
i i
I s
k 5
i
~
N 6
\\
.