ML20138L586

From kanterella
Jump to navigation Jump to search
Advises That Responses Re Commission Rule on ATWS, 10CFR50.62(d),do Not Provide Clear Basis for ATWS Schedule. Date When ATWS Mods Will Be Accomplished or Request for Schedular or Permanent Exemption Requested within 30 Days
ML20138L586
Person / Time
Site: Millstone, Haddam Neck, 05000000
Issue date: 12/13/1985
From: Miraglia F
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO., NORTHEAST NUCLEAR ENERGY CO.
References
NUDOCS 8512190305
Download: ML20138L586 (4)


Text

)* %q'o UNITED STATES g

NUCLEAR REGULATORY COMMISSION o

r, E

WASHINGTON, D. C,20555

.o December 13, 1985 Docket No.: 50-213/245 Mr. Jchn F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company Post Office Box 270 Hartford, Connecticut 06141

Dear Mr. Opeka:

SUBJECT:

ATWS RULE SCHEDULE REQUIRED BY 10 CFR 50.62 Re: Haddam Neck Plant & Millstone Unit 1 In your letters of September 9 and October 11, 1985, you provided information i

regarding your plans to achieve compliance with the Comission's rule on Anticipated Transients Without Scram (ATWS), 10 CFR 50.62. More specifically, you indic ted that for the Haddam Neck Plant and Millstone Unit 1 facilities, I

you intend to evaluate compliance with this rule as part of the Integrated Safety Assessment Program (ISAP).

Our letter of July 31, 1985, does approve inclusion of ATWS in the ISAP program. As with equipment qualification, however, we must make clear that this approval does not carry with it an automatic exemption from regulatory requirements.

10 CFR 50.62(d) requires that each licensee submit a schedule for compliance with applicable sections of the rule. This i

schedule, unlike 10 CFR 50.49(g), is subject to negotiation between the licensee and the staff, but must be justified Ly the licensee if it extends beyond the second refueling outage after July 26, 1984.

Your response for Haddam Neck and Millstone 1 does not meet 10 CFR 50.62(d) in that it does not provide a clear basis for an ATWS schedule, nor does it indicate when a proposed schedule will be provided. Therefore, within 30 days of receipt of this letter, you should provide one of the following for the Haddam Neck Plant and Millstone Unit 1:

1.

A date by which ATWS modifications will be accomplished; 2.

A request for exemption from the schedular requirements of 10 CFR 50.62(d); or 3.

A date by which a permanent exemption will be requested" from some or all of applicable 50.62 requirements, based on your current knowledge and plans with respect to ISAP and recognizing that such a schedule is dependent on timely staff review.

8512190305 851213 PDR ADOCK 05000213 P

PDR

~

Mr. Jahr, F. Opeka Millstone Nuclear Power Station Northeast Nuclear Energy Company Unit No. I cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Northeast Nuclear Energy Company ATTN: Superintendent Millstone Nuclear Power Station P. O. Box 128 Waterford, Connecticut 06385 Resident Inspector c/o U.S. NRC Millstone Nuclear Power Station P. O. Box 811 Niantic, Connecticut 06357 First Selectman of the Town of Waterford Hall of Records 200 Boston Post Road Waterford, Connecticut 05385 Se

Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant RDF #1 Post Office Box 127E East Hampton, Connecticut 06424 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 l

i

December 13, 1985 Mr. John F. Opeka In regard to any request for a schedular exemption we express no view at this time whether such an exemption can be granted solely based on ISAP considerations. We would most likely seek Commission guidance on whether closure of the ATWS issue can await outcome of the ISAP review.

orisic.ai'id"d4'I Frank J, karaglia Frank J. Miraglia, Director Division of PWR Licensing - B Office of Nuclear Reactor Regulation cc: See Next Page DISTRIBUTION gl Docket M e g NRC PDR Local PDR ISAPD Reading FMiraglia ACRS (10)

PAnderson CGrimes FAkstulewicz JShea WShields (0 ELD)

RKarsch E. Jordan RKendall B. Grimes J. Partlow gh hlb hp k-B ISAPD:WWRL-B ISAP:DPWR B ISAPD:DPW DELD ISAPDu D: p.-B PAnde#Fn':lt FAkstulewicz JShea CGrimes WShiqlds FMfr'aglia 12/3 /85 12/9/85-12/> /8 12/(,/85 12/g/85 12//j/85

...~

..