l ce_sqw DEC 171985 i

MEMORANDUM FOR: Chairman Palladino Commissioner Roberts Commissioner Asselstine

-Comissioner Bernthal

_Conmissioner Zech FROM:

William J. Dircks Executive Director for Operations

SUBJECT:

DAVIS-BESSE RESTART STATUS BRIEFING This is in response to the Commission's request for the staff to present a status briefing ~'for Davis-Besse prior to authorizing restart.

This memorandum encloses the briefing materials to support the Commission meeting wh,ich is currently scheduled from 9:30 am until 11:30 am on December 18, 1985.

The ACRS has been briefed on the June 9,1985 event and on licensee and staff actions associated with restart of Davis-Besse. An ACRS subcommittee meeting and plant tour was conducted at the site in early October, followed by a l-presentation to the full ACRS committee on October 10, 1985. The staff will continue to keep the ACRS informed.

(signed) William 1.Did5 h

William J. Dircks Executive Director for Operations

Enclosures:

As Stated cc: SECY OPE OGC

Contact:

C. McCracken, NRR X28595 4

  • See previous white for concurrences.

PBD-6 PBD-6 D:PBD-B D

I $

EDO U'

)

CMcCraci,en;cf* JStolz*

FMiraglia*

d i

hut g)0 on WDircks 12/10/85 12/11/85 12/11/85 12//p/85 12//p/85 12/j (,/85 IM

'W6 l

8512190224 851217 PDR ADOCK 05000346 P

PDR r_

CO MISSION BRIEFING DAVIS-BESSE RESTART FROM 6/9/85 EVENT DECEMBER 1985 i.

CONTACT:

C. McCPACKEN l

X28595 i

SLIDE 1

BACKGROUND o

Stritd5ER 10,1985 - LICENSEE RESPONDS TO 50.5Li(F) LETTER o

SEPT &BER 17,18,1985 - BRIEFING TO COMISSION ON FOLLOWUP ACTIONS o

OCTOBER 1, 1985 - NOVEMBER 16, 1985 - FOUR REVISIONS TO LICENSEE'S PLAN SUBMITTED o

ESTIMATED SCHEDULE FOR REMAINING ACTIONS, FEBP1JARY I TO MARCH 31, 1986, LICENSEE'S ESTIMATE FOR PLANT READINESS i

JANUARY 1986, ISSUE SER ON RESTART JANUARY 1986, ACRS SUBCOMITTEE' 1

FEBRUARY 1986, ACRS FULL C0 mITTEE r

CONTACT:

C. McCRACKEN X28595 SLIDE 2 i

_ _, - - - -. ~

PROGRAWATIC PEVIEW STATUS o

ORGANIZATIONAL CHANGES PROVIDE FOCUSED FESOURCES AND MANAGEE NT ATTENTION ON NUCLEAR MISSION o

NEW PERSONNEL AND C0FFETITIVE SALARIES AND TRAINING ORGANIZATION PROVIDE BASIS FOR LONG TERM IMPROVEE NT o

ADDITIONAL FIRST LINE PAINTENANCE SUPERVISION TO PROVIDE CLOSER CONTROL l

OF WORK o

ENGINEERING SUPPORT ON SITE TO PROVIDE I W ROVED CAPABILITY TO CORRECTLY DETERMINE ROOT CAUSE OF PROBLEMS o

CONFIGURATION FANAGEENT TO PROVIDE FOR LONG TERM IMPPOVEENTS IN RELIABILITY CONTACT:

C. McCRACKEN X28595 SLIDE 3

F-PLANT REVIEW STATUS o

EVENT SECIFIC CORRECTIVE ACTIONS: ACCEPTABLE o

STAFF ON SITE TEAM TO ENSUE ALL SYSTEMS IMPORTANT TO SAFETY AE FUNCTIONAL:

IN PROGRESS o

IWROVED DECAY HEAT REMOVAL ELIABILITY INCLUDES THIRD AFW PLf1P: UNDER EVIEW o

FAINTENANCE BACKLOG REDUCTION PLAN NEEDED FOR RESTART: SECOND SITE VISIT SCHEDULED o

REGIONAL REVIEW 0F READINESS FOR RESTART:

IN PROGRESS o

BLEED AND FEED CAPABILITY: ADEQUATE; PLANNED IWROVEENTS PROVIDE ADDITIONAL LONG TERM ASSURANCES o

LICENSING ACTIONS NOT RELATED TO EVENT DO NOT AFFECT ESTART l

l CONTACT:

C, McCRACEN X28505 l

[

SLIDE 4

DISTRIBUTION FOR GREEN TICKET # 001127 Docket File or Central File NRC PDR w/inc.

L PDR w/inc.

ED0 # 001127 ED0 Rdg-3 H. Denton/D. Eisenhut PBD-6 Rdg w/ copy of inc.

OELD SECY-3 WDircks PPAS, D. Mossburg #

FMiraglia/MSchaaf CMcCracken w/ copy of inc.

RIngram PBD-6 Green ticket file, P-214 T. Speis R. Bernero R. Vollmer W. Russell B. Snyder T. Murley V. Stelle J. Roe T. Rehm G. Cunningham J. Taylor A. El-Bassioni CHeltemes JKeppler l

l

,, o-MEMORANDUM FOR: Chairman Palladino Commissioner Roberts Commissioner Asselstine Comissioner Bernthal Commissioner Zech FROM:

William J. Dircks Executive Director for Operations

SUBJECT:

DAVIS-BESSE RESTART BRIEFING

\\'\\

/

This is in response to'tions for Davis-Besse prior toj uthorizing restart.

the Commission's request for theA taff to present its findings and recommenda 6

This memorandum provides riefing materials to supp rt the Commission meeting which is currently schedu ed from 10:00 am ur.til

30 am on December 18, 1985.

The ACRS has been briefed oh the June 9,1985 vent and on licensee and staff actions associated with resta An ACRS subcommittee meeting and plant tour.was conducted a[t of Davis-Bes tthesitei early October, followed by a

-presentation to the full ACRS connittee October 10, 1985. The staff will continue to keep the ACRS infornied.

\\

The enclosed materials consist of:\\

/

1.

Briefing slides for the meeting 2,

Discussion of Status of ta'ff Ev ations

/

/

Willia J. Dircks j

Executi e Director for Operations

/

Enclosures:

/

As Stated

/

/

cc: SECY

/

OPE OGC

\\

Contact:

'C. McCracken, NRR g

X28595

\\

+Y

.)eepreviouswhiteforconcurrencs.

PBD-6 PBD-6 D

B DD/NRR D/NRR ED0 CMcCracken;cf* JStolz*

FM lia*

DEisenhut HDenton WDircks 12/10/85 12/11/85 12/1 /85 12/ /85 12/ /85 12/ /85 I

i

1 r

MEMORANDUM FOR: Chairman Palladino Comissioner Roberts Comissioner Asselstine Comissioner Bernthal Comissioner Zech FROM:

William J. Dircks Executive Director for Operations

SUBJECT:

DAVIS-BESSE RESTART BRIEFING This is in response to the Comission's request for the staff to present its findings and recommendations for Davis-Besse prior to authorizing restart.

This memorandum provides briefing materials to support th Comission meeting which is currently scheduled from 10:00am until 11:30am December 18, 1985.

The ACRS has been briefed on the June 9,1985 event pid on licensee and staff actions associated with restart of Davis-Besse. An/ACRS sub-comittee meeting and plant tour was conducted at the site in earlyjoctober, followed by a presentation to the full ACRS comittee on October 10, 1985. The staff will continue to keep the ACRS informed.

/

/

The enclosed materials consist of:

1.

Briefing slides for the meeting

/

2.

Discussion of Status of Staff Evaluations

/

/

/

William J. Dircks Executive Director for Operations

Enclosures:

/

As Stated cc:

SECY OGC OCA

$h PBD-6 PBD-6 [O DD/NRR D/NRR ED0 CMcCracken;cf JStolz-Mir DEisenhut HDenton WDircks 12//o /85 12/g-/85 12// /85 12/ /85 12/ /85 12/ /85

-