g CCI 21 SS5 Docket Nos. 50-348

,, Distribution w/o enc 1.

and 50-364 vDoctet,711eet NRC PDR L POR ORB #1 RDG MEMORANDUM FOR:

Roger D. Walker, Director Memo file HThompson Division of Reactor Projects CParrish EReeves

  • Region II DGruber SVarga Glainas FROM:

Hugh L. Thompson, Jr., Director Division of Licensing

  • w/ encl.

SUBJECT:

LICENSING ACTION REVIEWS FOR FARLEY UNITS 1 AND 2 Your assistance is requested in conducting reviews of the enclosed submittal from Alabama Power Company dated September 19, 1985, for Farley Units 1 and 2.

The product expected from you in each case as a result of your review is a complete safety evaluation report suitable for use in an amendment, if necessary.

Your reviewers should use the Standard Review Plan (SRP) and Standard Technical Specifications (STS) as guidance in determining acceptance criteria, recognizing, of course, that, for operating reactors, the criteria in these documents are not requirements.

In accordance with NRR Office Letter No. 44, each safety evaluation performed by a technical division shall have a separate SALP input provided. For purposes of these reviews, the Regional personnel involved are considered part of the technical divisions.

Therefore, we are requesting that your forwarding memorandum contain a SALP input for each of the safety evaluations performed.

We request an expedited review as discussed with your staff.

The TAC numbers for the reviews are 59776 for Unit 1 and 59777 for Unit 2.

The requested completion date is October 31, 1985.

Please notify me as soon as possible if these completion dates are acceptable. Any contact with the licensee concerning these reviews or any additional infonnation deemed necessary should be obtained chrough the NRR Project Manager for Farley, Edward Reeves, who can be reached at 492-7386.

HMLN % #*

CrWr 3;%

Hugh L. Thompson, Jr., Director Division of Licensing, NRR

Enclosure:

As stated CONTACT:

E. Reeves (301) 492-7386 f/

y s

B#1:DL A

DL D:DL ORB #1:DL ORB #.

CParrish ERe es/ps a

G nas HThompson 10/%/85 10/{/85

/85 10/ /85 10/yI/85 l

P

l }f M:lling Address I

Alabima Powsr Company i

1 600 North 18th Street

- g Post Office Box 2641 Birmingham, Alabama 35291 Telephone 205 753-6090 l

R. P. Mcdonald Senior Vice President y

Flintndge Building Alabama Power September 19, 1985 i

Docket Nos. 50-348 50-364 2

i Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Connission Washington, D.C.

20555 Attention: Mr. S. A. Varga

%) ? F-1 Joseph M. Farley Nuclear Plant - Units 1 and 2 c

ut?

Proposed Administrative Technical Specification Change Gentlemen:

Recent organizational changes have been proposed and evaluated which impact Figures 6.2-1 and 6.2-2 and Sections 6.1.1, 6.2.2.f.5, 6.4.1, 6.5.1.1, 6.5.1.2, 6.5.1.6.n, 6.5.1.7.a and c, 6.5.2.2, 6.5.2.6, 6.5.3.1.a through f and 6.5.3.2 of the Unit 1 and 2 Technical Specifications. Alabama i

Power Company therefore submits this proposed administrative technical specification change in order to implement these management changes.

For the offsite organization it is proposed that Figure 6.2-1 and Section 6.5.2.2 be changed to combine and retitle the positions Manager -

Nuclear Operations and Administration and Manager - Nuclear Engineering and Technical Support (NETS) as General Manager - Nuclear Support. The functional responsibilities of the Manager - Nuclear Operations and i

Administration and Manager - NETS have been delegated to the General Manager

- Nuclear Support. The management change to a single General Manager -

Nuclear Support also necessitates a change in the meinbers of the Nuclear i

Operations Review Board (NORB).

In order to preserve the current membership of four (4) persons in the NORB, it is proposed that the General Manager -

Nuclear Plant become a permanent member of the NORB.

For the onsite organization it is also proposed that Figures 6.2-1 and 6.2-2 and Sections 6.1.1, 6.2.2. f.5, 6.4.1, 6.5.1.1, 6.5.1.2, 6.5.1.6. n,

6.5.1.7.a and c, 6.5.2.2, 6.5.2.6, 6.5.3.1.a through f and 6.5.3.2 be changed to reflect the title changes of Plant Manager to General Manager -

Nuclear Plant, Assistant Plant Manager-Plant Operations to Assistant General Manager-Plant Operations, Assistant Plant Manager-Plant Support to Assistant General Manager-Plant Support, and the title changes of the plant l

superintendents to managers of their respective organizations.

In addition,

\\

l T '#~ ~ ~~.

Ll l

F 'A66cg 55535!,,

,e( ),g19 40)

PDR 1

I D

[O 3

'l

~ -

Mr.' S. A.' Ya rga Page 2 j

U. S. Nuclear Regulatory Comission September 19, 1985 it the functional responsibilities of mechanical maintenance and electrical maintenance are each proposed to be assigned to a separate supervisor. The Plant Modifications Supervisor position is proposed to be changed to Plant

1 Modifications Manager. This position would report directly to the Assistant M

General Manager - Plant Support. The Computer Services Supervisor is

}

proposed to report to the Performance and P1anning Manager in lieu of the Technical Manager. The Operations Supervisor function has been replaced by l1 an Operations Staff. The Shift Supervisor, Daily Planning Supervisor,

i Building and Grounds Supervisor, and Operations Staff would report directly to the Operations Manager.

This proposed change will restructure the offsite and onsite organizations and enhance the efficiency and effectiveness of the support services and operetions functions performed for the Farley Nuclear Plant.

~

The proposed change is considered by Alabama Power Company to enhance safety. Alabama Power Company will therefore implement this change during the period that the NRC Staff is reviewing this proposed technical specification change.

The attachment to this submittal lists the changed technical specification pages and includes the proposed pages for Units 1 and 2.

Since the proposed technical specification change includes no changes which would involve a significant increase in the probability or consequences of an accident previously evaluated, no changes which create the possibility of a new or different kind of accident from any previously evaluated and no changes which would involve a significant reduction in a margin of safety, it is considered by Alabama Power Company to not involve a significant hazards consideration as defined in 10CFR50.92. The basis for this conclusion is that the proposed change enhances the efficiency and effectiveness of the support services provided for the Farley Nuclear Plant by the offsite organizations and enhances the onsite organization.

This change is administrative in nature and is proposed in order to have the Unit I and 2 Technical Specifications achieve consistency with the Farley Nuclear Plant Organization.

The Plant Operations Review Comittee has reviewed this proposed change and the Nuclear Operations Review Board will review this proposed change at 3

a future meeting.

a Pursuant to 10CFR170.21, the new rule on License Fees, the required License Amendment Application Fee of $150.00 is enclosed.

f In accordance with 10CFR50.90, three (3) signed originals and 40 copies 1

of this request are enclosed. A copy of this change has been sent to Mr.

1 Dan Turner, the Alabama State Designee, in accordance with 10CFR50.91(b)(1).

1 d

1 t:

l I

I a

.1

'I t

Mr. S. A. Varga Page 3 l

U. S. Nuclear Regulatory Comission September 19, 1985 1

=,

If there are any questions, please advise.

Lj l

Very truly

urs, l

1 7

.~

R. P. Mcdonald

  • I RPM /CJ S:ddb-D/T.S.IV Attachment i

cc: Mr. L. B. Long SWORN TO AND SUBSCRIBED BEFORE ME Dr. J. N. Grace K

Mr. E. A. Reeves THI N DAY OF.

kr,1985 Mr. W. H. Bradford i

Mr. Dan Turner h.

k f

Notar$ llublic My Comission Expires:

k'//-SI 4

.)

j

'?

y

Maihng Address Atatama Power Compary 600 Ncrtn 16tn Srt(t pw c+ce so. ren B.rm vam Ann ~a : 8 Te epre 205 78340W R. P. McDona'd h

der ci Vice Mer-new e w g Alithitmit POWei September '.9, 1985 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission Washington, D.C.

20555 Attention:

Mr. S. A. Yarga Joseph M. Farley Nuclear Plant - Units 1 and 2 Proposed Administrative Technical Specification Chance Gentlemen:

Recent organizational changes have been proposed and evaluated which impact Figures 6.2-1 and 6.2-2 and Sections 6.1.1, 6.2.2.f.5, 6.4.1, 6.5.1.1, 6.5.1.2, 6.5.1.6.n, 6.5.1.7.a and c, 6.5.2.2, 6.5.2.6, 6.5.3.1.a through f and 6.5.3.2 of the Unit 1 and 2 Technical 5pecifications. Alabama Power Company therefore submits this proposed administrative technical specification change in order to implement these management changes.

For the offsite organization it is proposed that Figure 6.2-1 and Section 6.5.2.2 be changed to combine and retitle the positions Manager -

Nuclear Operations and Administr0 tion and Manager - Nuclear Engineering and Technical Support (NETS) as General Manager - Nuclear Support. The j

functional responsibilities of the Manager - Nuclear Operations and l

Administration and Manager - NETS have been delegated to the General Manager

- Nuclear Support.

The management change to a single General Manager -

Nuclear Support also necessitates a change in the members of the Nuclear

. Operations Review Board (NORB).

In order to preserve the current membership of four (4) persons in the NORB, it is proposed that tne General Manager -

Nuclear Plant become a permanent member of the NORB.

For the onsite organization it is also proposed that Figures 6.2-1 and 6.2-2 and Sections 6.1.1, 6.2.2. f.5, 6.4.1, 6. 5.1.1, 6.5.1.2, 6. 5.1.6. n,

6.5.1.7.a and c, 6.5.2.2, 6.5.2.6, 6.5.3.1.a through f and 6.5.3.2 be i

changed to reflect the title changes of Plant Manager to General Manager -

Nuclear Plant, Assistant Plant Manager-Plant Operations to Assistant General Manager-Plant Operations, Assistant plant Manager-Plant Support to Assistant General Manager-Plant Support, and the title changes of the plant superintendents to managers of their respective organizations.

In addition,

i Mr. S. A. Varga Page 2 U. S. Nuclear Regulatory Commission September 19, 1985 the functional responsibilities of mechanical maintenance and electrical maintenance are each proposed to be assigned to a separate supervisor. The Plant Modifications Supervisor position is proposed to be changed to Plant Modifications Manager. This position would report directly to the Assistant General Manager - Plant Support. The Computer Services Supervisor is proposed to report to the Performance and Planning Manager in lieu of the Technical Manager. The Operations Supervisor function has been replaced by an Operations Staff. The Shift Supervisor, Daily Planning Supervisor, Building and Grounds Supervisor, and Operations Staff would report directly to the Operations Manager.

This proposed change will restructure the cifsite and onsite organizations and enhance the efficiency and effectiveness of the support services and operations functions performed for the Farley Nuclear Plant.

The proposed change is considered by Alabama Power Company to enhance safety. Alabama Power Company will therefore implement this change during the period that the NRC Staff is reviewing this proposed technical specification change.

The attachment to this submittal lists the changed technical specification pages and includes the proposed pages for Units 1 and 2.

Since the proposed technical specification change includes no changes which would involve a significant increase in the probability or consequences of an accident previously evaluated, no changes which create the possibility of a new or different kind of accident fron any previously evaluated and no changes which would involve a significant reduction in a margin of safety, it is considered by Alabama Power Company to not involve a significant hazards consideration as defined in 10CFR50.92.

The basis for this conclusion is that the proposed change enhances the efficiency and effectiveness of the support services provided for the Farley Nuclear Plant by the offsite organizations and enhances the onsite organization.

This change is administrative in nature ar.d is proposed in order to have the Unit 1 and 2 Technical Specifications achieve consistency with the Farley Nuclear Plant Organization.

The Plant Operations Review Committee has reviewed this proposed change and the Huclear Operations Reviek Board will revicw this proposed change at a future meeting.

Pursuant to 10CFR170.21, the new rule on License Fees, the required License Amendment Application Fee of $150.00 is enclosed.

In accordance with 10CFR50.90, three (3) signed originals and 40 copies of this request are enclosed. A copy of this change has been sent to Mr.

Dan Turner, the Alabama State Designee, in accordance with 10CFR50.91(b)(1),

i

2 Mr. S. A. Va rga Page 3 U. S. Nuclear Regulatory Connission September 19, 1985 If there are any questions, please advise.

Very truly

urs, f

L R. P. Mcdonald RPM /CJ S:ddb-D /T.S.IV Attachment cc:

Mr. L. B. Long SWORN TO AND SUBSCRIBED BEFORE ME Dr. J. N. Grace A

Mr. E. A. Reeves THI

/k DAY OF Nr,1985 fir. W. H. Bradford i

f%gA.,h.

k Mr. Dan Turner Notaryl Rublic fly Commission Expires:

f'//-Of

t Attachment Proposed Changed Pages Unit 1 Page 6-1 Page 6-la Page 6-2

- Page 6-3 Page 6-7 Page 6-8 Page 6-9 Page 6-10 Page 6-12 Page 6-13 Unit 2 Page 6-1 Page 6-la Page 6-2 Page 6-3 Page 6-7 Page 6-8 Page 6-9 Page 6-10 Page 6-12 Page 6-13 4

l

i ADMENISTRATIVE CONTROLS

-=

6.1 RESPONSIBILITY 6.1.1 The General Manager - Nuclear Plant shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.

6.1.2 The Shif t Supervisor or during his absence from the Control Room a designated individual shall be responsible for the Control Room command function.

A management directive to this effect, signed by the Senior Vice President responsible for Nuclear Generation, hereaf ter referred to as Senior Vice President, shall be reissued on an annual basis.

6.2 ORGANIZATION OFFSITE 6.2.1 The offsite organization for facility management and technical support shall be as shown on Figure 6.2-1.

FACILITY STAFF 6.2.2 The facility organization shall be as shown on Figu e 6.2-2 and:

a.

Each on-duty shift shall be composed of at least the mininun shif t crew composition shown in Table 6.2-1.

b.

At least one licensej Reactor Operator shall be in the Control Room when fuel is in the reactor.

In addition, at least one licensed Senior Reactor Operator shall be in the s

Control Room while the unit is in MODE 1, 2, 3 or 4.

c.

A Health Physics Technician # shall be on site when fuel is in the reactor.

d.

All CORE ALTERATIONS shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concurrent responsibilities during this operation.

e.

A site Fire Brigade of at least 5 members shall be maintair.ed onsite at all times.# The Fire Brigade shall not include 3 members of the minimum shift crew necessary for safe shutdown of the unit and any personnel required for other essential functions during a fire emergency.

FThe Health Physics Technician and Fire Brigade composition may be less than the minimum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accomodate unexpected absence of the Health Physics Technician and/or Fire Brigade members provided immediate action is taken to restore the Health Physics Technician and/or Fire Brigade to within the minimum requirements.

FARLEY-UNIT 1 6-1 A!1ENDMENT NO.

ADMINISTRATIVE CONTROLS f.

Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions; e.g., Senior Reactor Operators, Reactor Operators, Health Physics Technicians, Auxiliary Operators, and key maintenance personnel. Adequate shift coverage shall be maintained without routine heavy use of overtime. The objective shall be to have operating personnel work a nominal 40-hour week while the plant is operating.

In the event that unforeseen problems require substantial amounts of overtime to be used, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary basis, the following guidelines shall be r llowed:

o 1.

An individual will not be permitted to work more than 16 i.nurs str aight (not including shif t turnover time).

2.

There will be a break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (which can include shif t turnover time) between work periods.

3.

An individual will not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period (all excluding shif t turnover time).

4.

Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.

5.

Any deviation from the above guidelines for the minimum shif t complement defined in Technical Specification Table 6.2-1 atid health physics technicians shall be reviewed and approved by the General Manager - Nuclear Plant, his designee (Emergency Director) or higher authority. Any deviation from the above guidelines for key maintenance personnel shall be reviewed and approved by the Maintenance Manager or his designee (group supervisor).

FARLEY-UNIT 1 6-la AMENDMENT NO.

m c

I I

Ey Executive Vice President 1

Senior

  • NORB Vice President

.I I

e Manager General Manager -

l Safety Audit and Nuclear Support Engineering Review I

Staff I

i l

i Staff 4

m 0FFSITE OFFSITE 4

ONSITE ONSITE Supervisor General 11anager -

Safety Audit and Nuclear Plant Engineering Review i

4 i

Plant Staff Staff i

i j

  • Corporate responsibility j

for fire protection B

program l-R l

Figure 6.2-1 Offsite Organization for Facility fianagement and Technical Support s

1 l

l 4

rmynl finsyr - Mrlor Pl v*

R30 5taff histvd Staff histyt rmral Mnvyr-i histyt rmral tW Plat qmiticrs Diet Sgirt (1)

I

__l htfinfstrBtive }

1 I

I I

I l

l l

l 1

l TRhdCal Trainirg Perftsmum sti Plat Gestims 3 MrintmetP fivwyr Mvwyr Mnvyr l

Mngr Hvwyr Planfrq Mnvyr Hvfificatirn l

-Ibily Plavirn I

I l,

l f

I l

l iguvvivr IE Mdwitcal O&trical l

9 mivr vntmum Mrintmne Malth Fhy.

Om. A Dw.

Tahdcal Staff Planfrvj Sys. Perf.

St#f 4

Sqnvisor 9;mfvr 34eviscr*"

Sgwvivr Staff _9;nvivr Sgivvisr Sgnvivr t

-B143. 4 Crunk l

l l

9xvvvivr I

I I

I I

I l

Coguter l

It

' Mdwitcal Electrical Staff Staff

%ncttr Fire Fcrain Miintmum Mrintmne Emim Mrtal" Staff Staff Services l

Stevivr

--Staff Fommn Fonm m j

I I

i l I L

S1fft 1 Staff Staff Stiff Otumt Cm.

Hrrfals 9ntity Staff:

Sgavivr 94wvivr 9 nvism 9(vvvivr I)mitty Ontrol I

I I

I Staff

  • StWf Staff 9ntity I

Formvi Staff I

1 - Smtm 4wstrr's Liavve

- 7 tift Tenical wivr rhw*.

  • - kvictrr Qmitzus will teve Opmrtrr's Licme

" - Osite % gnsibility ftr Fire Protretim Pruym Firpre 6.24 facility Onyrizatim N In vtutine atters, tte Health Pflysics Supervisor rTports dirwtly to tre Tedriical Kuurr. In mittm of radiatim policy rrterminattan, interpretaticri cr inplewitatlan (basert tem tie ibalth Physics Supmisor's ju4yrnt), the lealth Physics Sgcevisor my nivrt rtirectly to the Assistant referal Kuwyr - Plait Ogerations.

(1) The persm filling this gunition rey act as the re1eral Marwyr - Mclear Plant, svwidrvi this person nets the rerpirimits of 461 N18.1-1971 Srction 4.2.1, FSM Settim 13.1.3.1.1 armi tus orpleteri Dervywy Directrr Trainirvi.

FAPLEY - LNIT 1 6-3 MgNMNf M1.

E

ADMINISTRATIVE CONTROLS 6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Manager and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55 and the supplemental requirements specified in Sections A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees,. and shall include familiarization with the relevant operational experience.

6.5 REVIEW AND AUDIT 6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)

FUNCTION 6.5.1.1 The PORC shall function to advise the General Manager - Nuclear Plant on all matters related to nuclear safety.

COMPOSITION 6.5.1.2 The PORC shall be composed of the:

Chai rman:

General Manager - Nuclear Plant Vice Chairman:

Assistant General Manager - Plant Operations Member:

Assistant General Manager - Plant Support a'.embe r:

Operations Manager Menber:

Technical Manager Member:

Maintenance Manager Menber (non-voting):

Supervisor - Safety Audit and Engineering Review Member:

Performance and Planning Manager Member:

Plant Modifications Manager ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than one alternate shall participate as a voting member in PORC activities at any one time.

MEETING FRE0VENCY 6.5.1.4 The PORC shall meet at least once per calendar month and as convened by the PORC Chairman or Vice Chairman.

OUORUM 6.5.1.5 The minimum quorum of the PORC necessary for the pt srmance of the PORC responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or Vice Chairman and three members including alternates.

RESPONSIBILITIES 6.5.1.6 The PORC shall review:

FARLEY-UNIT 1 6-7 AMENDMENT NO.

l

.n.-

ADMINISTRATIVE CONTROLS e

a.

All administrative procedures and changes thereto, b.

The safety evaluations for 1) procedures, 2) changes to procedures, 4

equipment or systems, and 3) tests or experiments completed under the provision of Section 50.59,10CFR, to verify that such actions did not constitute an unreviewed safety question and all programs required by Specification 6.8 and changes thereto.

l c.

Proposed procedures and changes to procedures, equipment or systems which may involve an unreviewed safety question as defined in Section 50.59, 10CFR.

d.

Proposed tests or experiments which may involve an unreviewed safety question as defined in Section 50.59, 10CFR.

e.

Proposed changes to Technical Specifications or this Operating License.

f.

Reports of violations of codes, regulatt _m.

arders, Technical Specifications, license requirements, on v' 'aternal procedures or instructions having nuclear safety significance or reports of abnormal degradation of systems designed to contain radioactive material.

g.

Reports of significant operating abnormalities or deviations from l

normal and expected performance of plant equipment that affect nuclear safety.

h.

All REPORTABLE EVENTS.

l I

i. All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structures, systems, or components.
j. The plant Security Plan.

k.

The Emergency Plan.

1.

Facility operations to detect potential nuclear safety hazards.

Investigations or analyses of special subjects as requested by the m.

Cha'irman of the Nuclear Operations Review Board.

n.

Every unexpected onsite release of radioactive material to the environs resulting from a lack nf preplanning including the preparation and forwarding of reports covering evaluation, recommendations and disposition of the corrective action to prevent recurrence to the General Manager - Nuclear Plant and to the Nuclear Operations Review Board, o.

Changes to the PROCESS CONTROL PROGRAM and the 0FFSITE DOSE CALCULATION MANUAL.

FARLEY-UNIT 1 6-8 AMENDMENT NO.

ADMINISTRATIVE CONTROLS AUTHORITY 6.5.1.7 The PORC shall:

a.

Recommend to the General Manager - Nuclear Plant in writing, approval or disapproval of items considered under 6.5.1.6(a) through (e) and (j) and (k) above, b.

Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a), (c) and (d) above constitutes an unreviewed safety question.

c.

Make recommendations to the General Manager - Nuclear Plant in writing that actions reviewed under 6.5.1.6(b) above did not constitute an unreviewed safety question.

RECORDS 6.5.1.8 The PORC shall maintain written minutes of each meeting and copies shall be provided to the Senior Vice President and Chairman of the Nuclear Operations Review Board.

6.5.2 NUCLEAR OPERATIONS REVIEW BOARD (NORB)

FUNCTION 6.5.2.1 The NORB shall function to provide independent review and audit of designated activities in the areas of:

a.

Nuclear power plant operations b.

Nuclear engineering c.

Chemistry and radiochemistry d.

Metallurgy e.

Instrumentation and control f.

Radiological safety g.

Mechanical and electrical engineering h.

Quality assurance practices COMPOSITION 6.5.2.2 The NORB shall be composed of at least four persons including:

Chai rman:

Senior Vice President Vice Chairman:

General Manager - Nuclear Support Secretary:

Manager-Safety Audit and Engineering Review Member:

General Manager - Nuclear Plant and other appointed personnel having an academic degree in an engineering or physical science field and a minimum of five years technical experience, of which a minimum of three years shall be in one or more of the areas given in 6.5.2.1.

FARLEY - UNIT 1 6-9 AMENDMENT NO.

i AD?ilNISTRATIVE CONTROLS ALTERNATES i

6.5.2.3 All alternate members shall be appointed in writing by the NORB Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NORB activities at any one time.

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the NORB Chairman to provide expert advice to the NORB.

MEETING FREQUENCY 6.5.2.5 The NORB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per six mor.ths thereafter.

QUORUM 6.5.2.6 A quorum shall consist of the Chairman or Vice Chairman plus enough voting members to constitute a majority of the NORB. No more than a minority of the quorum shali have line responsibility for operation of the facility. For the purpose of a quorum those considered to have line responsibility will include the General Manager - Nuclear Plant and personnel reporting to the General Manager - Nuclear Plant.

REVIEW 6.5.2.7 The NORB shall review:

f a.

Proposed changes to procedures, equipment or systems which inv31ve an unreviewed safety question as defined in Section 50.59, 10CFR.

i b.

Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10CFR.

c.

Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance or abnormal degradation of systems designed to contain radioactive material.

d.

Significant operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety.

i e.

All REPORTABLE EVENTS.

f.

Recognized indications of an unanticipated deficiency in some aspect of design or operation of safety-related structures, systems, or components.

FARLEY-UNIT 1 6-10 AMENDMENT NO.

l

ADMINISTRATIVE CONTROLS 1.

The OFFSITE DOSE CALCUL/ TION MANUAL and implementing procedures at least once per 24 months.

m.

The PROCESS CONTROL PRORAM and implementing procedures for solidification of radioactive wastes at least once per 24 months.

n.

At each scheduled NORB meeting, the Manager-Safety Audit and Engineering Review shall make a summary report of the above audits.

AUTHORITY i

6.5.2.9 The NORB shall report to and advise the Senior Vice President on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

RECORDS 6.5.2.10 Records of NORB activities shall be prepared, approved and distributed as indicated below:

a.

Minutes of each NORB meeting shall be prepared, approved and forwarded to the Senior Vice President within 14 days following each meeting.

b.

Reports of reviews encompassed by Section 6.5.2.7 above, shall be prepared, approved and forwarded to the Senior Vice President within 14 days following completion of the review.

c.

Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Senior Vice President and to the management positions responsible for the areas audited within 30 days af ter completion of the audit.

6.5.3 TECHNICAL REVIEW AND CONTROL 4

ACTIVITIES 6.5.3.1 Activities which affect nuclear safety shall be conducted as follows:

a.

Procedures required by T,echnical Specification 6.8 and other procedures which affect plant nuclear safety, and changes (other than editorial or typographical changes) thereto, shall be prepared, reviewed and approved. Each such procedure or procedure change shall be reviewed by an individual / group other than the individual / group which prepared the procedure or procedure change, but who may be from the same organization as the individual / group which prepared the procedure or procedure change. Procedures other i

than Administrative Procedures will be approved by either the Technical Manager, the Operations Manager, the Maintenance Manager, the Performance and Planning Manager, Plant Modifications Manager, the Administrative Manager, or an Assistant General Manager as applicable. The General Manager - Nuclear Plant will approve administrative procedures, security implementing procedures, emergency plan implementing procedures and contingency implementing procedures. Temporary changes to procedures which clearly do not change the intent of the _ approved procedures will be approved by two i

FARLEY-UNIT 1 6-12 AMENDMENT N0.

i I

ADMINISTRATIVE CONTROLS members of the plant staff, at least one of whom holds a Senior Reactor Operator's License. For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change.

b.

Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the General Manager - Nuclear Plant. Each such modification shall be reviewed by an individual / group other than the individual / group which designed the modification, but who may be from the same organization as the individual / group which desi3ned the modification. Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved prior to implementation by the General Manager - Nuclear Plant.

c.

Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report shall be l

prepared, reviewed, and approved. Each such test or experiment shall be reviewed by an individual / group other than the individual / group which prepared the proposed test or experiment. Proposed tests and experiments shall be approved before implementation by the General Manager - Nuclear Plant.

d.

Occurrences reportable pursuant to the Technical Specification 6.0 and violations of Technical Specifications shall be investigated and a report prepared which evaluates the occurrence and which provides recommendations to prevent recurrence.

Such reports shall be approved by the General Manager - Nuclear Plant and forwarded to the Senior Vice President and to the Chairman of the Nuclear Operations Review Board, e.

Individuals responsible for reviews performed in accordance with 6.5.3.1.a, 6.5.3.1.b, 6.5.3.1.c, and 6.5.3.1.d shall be members of the plant supervisory staff previously designated by the General Manager -

Nuclear Plant.

Each such review shall include a determination of whether or not additional, cross-disciplinary, review is necessary.

If deemed necessary, such review shall be performed by the review personnel of the appropriate discipline.

f.

Each review will include a determination of whether or not an unreviewed safety. question is involved. Pursuant to 10CFR50.59 NRC approval of items involving unreviewed safety question will be obtained prior to General Manager - Nuclear Plant approval for implementation.

RECORDS 6.5.3.2 Records of the above activities shall be provided to the General Manager

- Nuclear Plant, PORC and/or NORB as necessary for required reviews.

FARLEY-UNIT 1 6-13 AMENDMENT N0.

l

. ADMlNISTRATlVE CONTROLS 6.1 RESPONSIBILITY 6.1.1 The General Manager - Nuclear Plant shall be responsible for overall unit operation and shall delegate in writing the succession to this responsibility during his absence.

6.1.2 The Shift Supervisor or during his absence from the Control Room a designated individual shall be responsible for the Control Roon command function. A management directive to this effect, signed by the Senior Vice President responsible for Nuclear Generation, hereaf ter referred to as Senior Vice President, shall be reissued on an annual basis.

6.2 ORGANIZATION OFFSITE 6.2.1 The offsite organization for facility management and technical support shall be as shown on Figure 6.2-1.

FACILITY STAFF 6.2.2 The facility organization shall be as shown on Figure 6.2-2 and:

a.

Each on-duty shif t shall be composed of at least the mininun shift crew composition shown in Table 6.2-1.

b.

At least one licensed Reactor Operator shall be in the Control Room when fuel is in the reactor.

In addition, at least one licensed Senior Reactor Operator shall be in the Control Room while the unit is in MODE 1, 2, 3 or 4.

c.

A Health Physics Technician # shall be on site when fuel is in the reactor.

d.

All CORE ALTERATIONS shall be directly supervised by either a licensed Senior Reactor Operator or Senior Reactor Operator Limited to Fuel Handling who has no other concugent responsibilities during this operation.

e.

A site Fire Brigade of at least 5 members shall be maintained onsite at all times.# The Fire Brigade shall not include 3 members of the minimum shift crew necessary for safe shutdown of the unit and any personnel required for other essential functions during a fire emergency.

  1. The Health Physics Technician and Fire Brigade composition may be less than the minimun requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> in order to accomodate unexpected absence of the Health Physics Technician and/or Fire Brigade members provided immediate action is taken to restore the Health Physics Technician and/or Fire Brigade to within the minimum requirements.

FARLEY-UNIT 2 6-1 AMENDMENT NO.

3-ADMINISTRATIVE CONTROLS,

_=

f.

Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety-related functions; e.g., Senior Reactor Operators, Reactor Operators, Health Physics Technicians, Auxiliary Operators, and key maintenance personnel. Adequate shift coverage shall be maintained without routine heavy use of overtime. The objective

, shall be to have operating personnel work a nominal 40-hour week

'while the plant is operating.

Cn the event that unforeseen problems require substantial amounts of overtime to be used, or during extended periods of shutdown for refueling, major maintenance or major plant modifications, on a temporary basis, the following guidelines shall be followed:

1.

An individual will not be permitted to work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> straight (not including shif t turnover time).

2.

There will be a break of at least 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> (which can include shif t turnover time) between work periods.

3.

An individual will not work more than 16 hours1.851852e-4 days <br />0.00444 hours <br />2.645503e-5 weeks <br />6.088e-6 months <br /> in any 24-hour period, nor more than 24 hnurs in any 48-hour period, nor more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in any 7-day period (all excluding shift turnover time).

4.

Except during extended shutdown periods, the use of overtime should be considered on an individual basis and not for the entire staff on a shift.

5.

Any deviation from the above guidelines for the mininum shift complement defined in Technical Specification Table 6.2-1.and health physics technicians shall be reviewed and approved by the General Manager - Nuclear P1 ant, his designee (Emergency Director) or higher authority. Any deviation from the above guidelines for key maintenance personnel shall be reviewed and approved by the Maintenance Manager or his designee (group supervisor).

)

l FARLEY-UNIT 2 6-la AMENDMENT N0.

l l

_ _ _ _ _ = - -. -

~ - _ _

5 P

G i

EI Executive Q

Vice President 82 Senior

  • NORB Vice President Manager General Manager -

Safety Audit and Nuclear Support Engineering Review I

Staff I

Staff m

d2 0FFSITE OFFSITE 0HSITE ONSITE Supervisor General Manager -

Safety Audit and Huclear Plant Engineering Review t

Plant Staff Staff

  • Corporate responsibility for fire protection h

program A

Figure 6.2-1 Offsite Organization for Facility Management and Technical Support e

d

'puval Mr,vyr - fis Mr PLvit IUC StWf Av.istyt Ltif Assistut rmyn1 Mnvyr-1 Av,1 stet rmal Mrsyw Plant Oltratias olant Sgpyt (1) 1 I

I I

l l

1 l

l 1

I l

At,inistntie l

l Training ra

.r mi Plant l

4mtlas 9 mintmue Tatrical l

Munyr Myry Plamirq Mnvyr Hrfificatias Mvwyr Mvwir Mrnte l

l

_Thily P1miiry I

I l

l I

I l

I sp wisr IE Mthritcal Elmtrical l

innvisr mintmem Nintmvte

%1th Fty.

Om. 4 Dw.

retnical Staff Pl.wrifrg Sys. Perf.

Staff Svervist Sanvisr Sanvisr**

9 ervier staff

_ Sewisr Sarwisr 9:evisr l

l hht. & Grurth J

I I

I I

I I

spwisr l

Cagutry IAC Mdunical Elmtrical StWf Staff Amctrr Fire Fcrtrnn mintmem mintmyte Ergirrvr Mv4al**

Staff Staff 9evies l

Sgrwisr

-StWf Fonn Formvi I

I I

I I I L

Stift 1 Stsff Staff St#f rkurmt Cm.

'ivtryials 9nrity Staff Sgnvisr lpvvisr ignviar semisr r)nlity rmtrol i

I I

I Staff

  • StWf Staff 9erity I

Ftrmn Staff hift Tatvifcal 1

1 - Smio-(tmtrr's Liavre AMar emnk

  • - Ihrtr (tmtrrs will tme Opostrr's Liovre

- hite TWpirJbility fir Fire Prubstim Prrrran Firpe 62-2 Facility Orrivtiritim

      • In routire etters, tte thalth Physics Supprvistr rrpnets directly to tte Technical Mvwyr. In retters of radiation policy rt' termination, interpretatim er inp1rvettation (bastvt tpon tre Ibalth Physics Suppnisor's ju4 pent), tie Ibalth Physics Stervisor my rtynrt dirvctly to tte Assistant ferral MrwyMclear Ogrations.

(1) The person fillirvj this positim rmy act as the revral Hvwyr Mclear@lant, prwi4vi this rerson rtets the req irmPnts of /HS! N18.1-1971 Smtion 4.2.1, TVR Sectim 13.1.3.1.1 arri Ms ctrpleted Erer rncy Directrr Training.

FNLEY - LNIT 2 6-3

/M MtfNT NO.

ADMINTSTRATIVE CONTROLS 6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Manager and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55 and the supplemental requirements specified in Sections A and C of Enclosure 1 of the March 28, 1980 NRC letter to all licensees,, and shall include familiarization with the relevant operational i

experience.

6.5 REVIEW AND AUDIT 6.5.1 PLANT OPERATIONS REVIEW COMMITTEE (PORC)

FUNCTION 6.5.1.1 The PORC shall function to advise the General Manager - Nuclear Plant on all matters related to nuclear safety.

C0! POSITION 6.5.1.2 The PORC shall be composed of the:

Chai rman:

General Manager - Nuclear Plant Vice Chairman:

Assistant General Manager - Plant Operations Member:

Assistant General Manager - Plant Support Member:

Operations Manager Member:

Technical Manager Member:

Maintenance Manager Member (non-voting):

Supervisor - Safety Audit and Engineering Review Member:

Performance and Planning Manager Memoer:

Plant Modifications Manager ALTERNATES 6.5.1.3 All alternate members shall be appointed in writing by the PORC Chairman to serve on a temporary basis; however, no more than one alternate shall participate as a voting member in PORC activities at any one time.

MEETING FREQUENCY 6.5.1.4 The PORC shall meet at least once per calendar month and as convened by the PORC Chairman or Vice Chairman.

QUORUM 6.5.1.5 The minimum quorum of the PORC necessary for the performance of the PORC responsibility and authority provisions of these Technical Specifications shall consist of the Chairman or Vice Chairman and three members including alternates.

RESPONSIBILITIES 6.5.1.6 The PORC shall review:

FARLEY-UNIT 2 6-7 AMENDMENT NO.

ADMINISTRATIVE CONTROLS a.

All administrative procedures and changes thereto, b.

The safety evaluations for 1) procedures, 2) changes to procedures, equipment or systems, and 3) tests or experiments completed under the orovision of Section 50.59,10CFR, to verify that 3uch actions did not constitute an unreviewed safety question and all programs required by Specification 6.8 and changes thereto.

c.

Proposed procedures and changes to procedures, equipment or systems which may involve an unreviewed safety question as defined in Section 50.59, 10CFR.

d.

Proposed tests or experiments which may involve an unreviewed safety question as defined in Section 50.59, 10CFR.

e.

Proposed changes to Technical Specifications or this Operating License.

f.

Reports of violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance or reports of abnormal degradation of systems designed to contain radioactive material.

g.

Reports of significant operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety.

h.

All REPORTABLE EVENTS.

i. All recognized indications of an unanticipated deficiency in some aspect of design or operation of safety related structures, systems, or components.
j. The plant Security Plan.

k.

The Emergency Plan.

1.

Facility operations to detect potential nuclear safety hazards, Investigations or analyses of special subjects as requested by the i

m.

l Chairman of the Nuclear Operations Review Board.

l l

n.

Every unexpected onsite release of radioactive material to the environs resulting from a lack of preplanning including the preparation and forwarding of reports covering evaluation, recommendations and disposition of the corrective action to prevent recurrence to the General fianager - Nuclear Plant and to the Nuclear Operations Revies Board.

o.

Changes to the PROCESS CONTROL PROGRAM and the OFFSITE DOSE CALCULATION MANUAL.

FARLEY-UNIT 2 6-8 AMENDMENT NO.

1 ADMINISTRATIVE CONTROLS AUTHORITY

+

6.5.1.7 The PORC shall:

a.

Recommend to the General Manager - Nuclear Plant in writing, approval or disapproval of items considered under 6.5.1.6(a) through (e) and (j) and (k) above, b.

Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a), (c) and (d) above constitutes an unrevieWed safety question.

c.

Make recommendations to the General Manager - Nuclear Plant in writing that actions reviewed under 6.5.1.6(b) above did not constitute an unreviewed safety question.

RECORDS 6.5.1.8 The PORC shall maintain written minutes of each meeting and copies shall be provided to the Senior Vice President and Chairman of the Nuclear Operations Review Board.

6.5.2 NUCLEAR OPERATIONS REVIEW BOARD (NORB)

FUNCTION 6.5.2.1 The NORB shall function to provide independent review and audit of designated activities in the areas of:

a.

Nuclear power plant operations b.

Nuclear engineering c.

Chemistr, and radiochemistry d.

Metallurgy e.

Instrumentation and control f.

Radiological safety g.

Mechanical and electrical engineering

-g h.

Quality assurance practices COMPOSITION

-e 6.5.2.2 The NORB shall be composed of at least four persons including:

Chai rman:

Senior Vice President Vice Chairman:

General Manager - Nuclear Support Secretary:

Manager-Safety Audit and Engineering Review Member:

General Manager - Nuclear Plant and other appointed personnel having an academic degree in an engineering or physical science field and a minimum of five years technical experience, of which a minimum of three vears shall be in one or more of the areas given in 6.5.2.1.

FARLEY - UNIT 2 6-9 AMENDt1ENT NO.

ADMINISTRATIVE CONTROLS ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the NORB Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in NORB activities at any one time.

CONSULTANTS 4

6.5.2.4 Consultants shall be utilized as determined by the NORD Chairman to provide expert advice to the NORB.

MEETING FREQUENCY 6.5.2.5 The NORB shall meet at least once per calendar quarter during the initial year of unit operation following fuel loading and at least once per six months thereafter.

QUORUM 6.5.2.6 A quorum shall consist of the Chairman or Vice Chairman plus enough voting members to constitute a majority of the NORB. No more than a minority of the quorum shall have line responsibility for operation of the facility. For the purpose of a quorum those considered to have line responsibility will include the General Manager - Nuclear Plant and personnel reporting to the General Manager - Nuclear Plant.

R,EVIEW 6.5.2.7 The NORB shall review:

a.

Proposed changes to procedures, equipment or systems which involve an unreviewed safety question as defined in Section 50.59, 10CFR.

b.

Proposed tests or experiments which involve an unreviewed safety question as defined in Section 50.59, 10CFR.

l c.

Violations of codes, regulations, orders, Technical Specifications, license requirements, or of internal procedures or instructions having nuclear safety significance or abnormal degradation of systems des,igned to contain radioactive material.

d.

Significant operating abnormalities or deviations from normal and j

expected performance of plant equipment that affect nuclear safety.

e.

All REPORTABLE EVENTS.

f.

Recogni7 indications of an unanticipated deficiency in some aspect j

of des 4 Operation of safety-related structures, systems, or 4.

componen.

FARLEY-UNIT 2 6-10 AMENDMENT NO.

i ADMINISTRATIVE CONTROLS 1.

The OFFSITE DOSE CALCULATION MANUAL and implementing procedures at least once per 24 months.

m.

The PROCESS CONTROL PROGRAM and implementing procedures for solidification of radioactive wastes at least once per 24 months.

n.

At each scheduled NORB meeting, the Manager-Safety Audit and Engineering Review shall make a summary report of the above audits.

AUTHORITY 6.5.2.9 The NORS shall report to and advise the Senior Vice President on those areas of responsibility specified in Sections 6.5.2.7 and 6.5.2.8.

RECORDS 6.5.2.10 Records of NORB activities shall be prepared, approved and distributed as indicated below:

a.

Minutes of each NORB meeting shall be prepared, approved and forwarded to the Senior Vice President within 14 days following each meeting.

b.

Reports of reviews encompassed by Section 6.5.2.7 above, shall be prepared, approved and forwarded to the Senior Vice President within 14 days following conpletion of the review.

c.

Audit reports encompassed by Section 6.5.2.8 above, shall be forwarded to the Senior Vice President and to the management positions responsible for the areas audited within 30 days after completion of the audit.

6.5.3 TECHNICAL REVIEW AND CONTROL ACTIVITIES

.es, l

6.5.3.1 Activities which affect nuclear safety shall be conducted as follows:

a.

Procedures required by Technical Specification 6.8 and other procedures which affect plant nuclear safety, and changes (other than editorial or typographical changes) thereto, shall be prepared, I

reviewed and approved.

Each such procedure or procedure change shall be reviewed by an individual / group other than the individual / group which prepared the procedure or procedure change, but who may be from the same organization as the individual / group which prepared the procedure or procedure change. Procedures other than Administrative Procedures will be approved by either the Technical Manager, the Operations Manager, the Maintenance Manager, the Performance and Planning Manager, Plant Modifications Manager, the Administrative Manager, or an Assistant General Manager as applicable. The General Manager - Nuclear Plant will approve administrative procedures, security implementing procedures, emergency plan implementing procedures and contingency implementing p rocedures. Temporary changes to procedures which clearly do not change the intent of the approved procedures will be approved by two

~^

FARLEY-UNIT 2 6-12 AMENDMENT NO.

l

ADMINISTRATIVE CONTROLS t

members of the plant staff, at least one of whom holds a Senior Reactor Operator's License.

For changes to procedures which may involve a change in intent of the approved procedures, the person authorized above to approve the procedure shall approve the change.

b.

Proposed changes or modifications to plant nuclear safety-related structures, systems and components shall be reviewed as designated by the General Manager - Nuclear Plant.

Each such modification shall be reviewed by an individual / group other than the individual / group which designed the modification, but who may be from the same organization as the individual / group which designed the modification.

Proposed modifications to plant nuclear safety-related structures, systems and components shall be approved prior to implementation by the General Manager - Nuclear Plant.

c.

Proposed tests and experiments which affect plant nuclear safety and are not addressed in the Final Safety Analysis Report shall be prepared, reviewed, and approved.

Each such test or experiment shall be reviewed by an individual / group other than the individual / group which prepared the proposed test or experiment. Proposed tests and experiments shall be approved before implementation by the General Manager - Nuclear Plant.

d.

Occurrences reportable pursuant to the Technical Specification 6.0 and violation; of Technical Specifications shall be investigated and a report prepared which evaluates the occurrence and which provides recommennations to prevent recurrence.

Such reports shall be approved by the General Manager - Nuclear Plant and forwarded to the Senior Vice Preside'it and to the Chairman of the Nuclear Operations Review Board, e.

Individuals responsible for reviews performed in accordance with 6.5.3.1.a 6.5.3.1.b, 6.5.3.1.c, and 6.5.3.1.d shall be members of the plant supervisory staff previously designated by the General Manager -

Nuclear Plant. Each such review shall include a determination of whether or not additional, cross-disciplinary, review is necessary.

If deemed necessary, such review shall be performeo by the review personnel of the appropriate discipline, f.

Each review will include a determination of whether or not an unreviewed safety question is involved. Pursuant to 10CFR50.59 NRC approval of items involving unreviewed safety question will be obtained prior to General Manager - Wuclear Plant approval for implementation.

RECORDS 6.5.3.2 Records of the above activities shall be provided to the General Manager

- Nuclear Plant, PORC and/or NORB as necessary for required reviews.

FARLEY-UNIT 2 6-13 AMENDMENT NO.

e.