Text
I
e
,
pW49
UNITED STATES
- p
k
9
NUCLEAR REGULATORY COMMISSION
e
g
REGloN iv
%
8
611 RYAN PLAZA drive, SulTE 400
%....+/
ARLINGTON. TEXAS 76011-8064
May 5, 1997
'
EA 97101
EA 97-156
'
.
Charles M. Dugger, Vice President
Operations - Waterford 3
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
SUBJECT: NRC INSPECTION REPORT 50-382/97-04. AND NOTICE OF VIOLATION
Dear Mr. Dugger:
An NRC inspection was conducted February 23 through April 5,1997, at your Waterford
Steam Electric Station, Unit 3 reactor facility. The enclosed report presents the scope and
results of that inspection.
,
During the 6-week period covered by this inspection period, your conduct of activities at
Waterford 3 was generally characterized by good performance of operations, maintenance,
engineering, and plant support. However, violations of NRC requirements were identified.
,
Violation A identified numerous examples of the failure to comply with the Technical
Specification requirements for the use of overtime. The violation reflects a weakness in
management oversight and ownership for the control of overtime, which could affect the
quality of safety-related activities.
'
Violation B involved the failure of your staff to recognize that Shield Building Ventilation
Train B failed its Technical Specification surveillance for maximum air flow and your
,
i
surveillance review process allowed the surveillance failure to go undetected for a period of
time greater than the Technical Specification allowed outage time for that equipment.
Further, your failure to recognize that Train 8 did not comply with the surveillance
i
requirements allowed the other train to be taken out of service for maintenance without
recognition that both trains would be rendered inoperable.
Violation C involved two examples of inadequate 10 CFR 50.59 evaluations. Personnel
t
involved in the preparation and review of these evaluations demonstrated inadequate
t
knowledge of Technical Specification requirements for containment isolation valves. As a
result of these inadequate evaluations, an instance was identified of failure to comply with
the Technical Specification requirement for direct position indication for containment
isolation valves, which caused the Technical Specification allowed outage time to be
i
exceeded without the required actions being taken.
!
l
<
.
9705120272 970505
ADOCK 05000382
G
,
>
i
-_
. __
_ _ _ _ _ _ _
_
_ _ _ . .
_ _ .
. - -_ .- _ _ _
...
.
_
.
____
.
Entergy Operations, Inc.
-2-
,
The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are described in detailin the enclosed report. Please note that
7
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
,
!
to determine whether further enforcement action is necessary to ensure compliance with
'
regulatory requirements.
I
i
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,
its enclosure (s), and your response will be placed in the NRC Public Document Room
(PDR). To the extent possible, your response should not include any personal privacy,
-
proprietary, or safeguards information so that it can be placed in the PDR without
redaction.
!
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
>
Sincerely,
'
N.
l
Thomas P. Gwynn, Director
'
Division of Reactor Projects
,
i
Docket No.:- 50-382
License No.: NPF-38
Enclosures:
2. NRC Inspection Report
50-382/97-04
cc w/ enclosures:
Executive Vice President and
l
Chief Operating Officer
Entergy Operations, Inc.
l
P.O. Box 31995
i
'
Jackson, Mississippi 39286-1995
'
i
j
Vice President, Operations Support
Entergy Operations, Inc.
i
P.O. Box 31995
i
Jackson, Mississippi 39286-1995
1
,
'
l
I
_ .__
.. __. . . _ _ . . . _ _ . _ . _ . _ _ _ . . . . _ _ . . . _ _ _
_ _ . . . . _
.
.
t
!
Entergy Operations, Inc.
-3-
,
,
Wise, Carter, Child & Caraway
!
P.O. Box 651
Jackson, Mississippi 39205
,
General Manager, Plant Operations
'
Waterford 3 SES
,
'
Entergy Operations, Inc.
i
P.O. Box B
Killona, Louisiana 70066
'
Manager.- Licensing Manager
!
!
Waterford 3 SES
Entergy Operations, Inc.
l
!
P O. Box B
Killona, Louisiana 70066
i
Chairman
Louisiana Public Service Commission
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
.
Director, Nuclear Safety &
Regulatory Affairs
i
Waterford 3 SES
l
Entergy Operations, Inc.
P.O. Box B
Killona, Louisiana 70066
William H. Spell, Administrator
Louisiana Radiation Protection Division
P.O. Box 82135
j
Baton Rouge, Louisiana 70884-2135
t
Parish President
'
St. Charles Parish
!
P.O. Box 302
!
'
Hahnville, Louisiana 70057
Mr. William A. Cross
.Bethesda Licensing Office
I
'
3 Metro Center
Suite 610
!
!
Bethesda, Maryland 20814
!
i
- _
_
.-
- - . .
,.
..,
. _ _ _ _ _ _ _ _ _ _ - _ _ . _ _ _ _ - _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - __-____ ____-_____- __
.
Entergy Operations, Inc.
-4-
Winston & Strawn
1400 L Street, N.W.
Washington, D.C. 20005-3502
,
.
ne e
l
i
i
j
..
.__
..-
_ _ . _ _ _
__
_.
.
... _
_ . _ . _
_
. _.__
_
't
o'
04/28 67
09:35
R IV US tRC FTS
002
,
,
,
!
4
- ,
,
Entergy Operations, Inc.
5-
I
a.
E-Mail report to T. Boyce (THB)
I
.
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
l
'
E-Mail report to Richard Correia (RPC)
,
E Mail report to Frank Talbot (FXT)
'
bec to DCD, (lE01)
I
t>cc distrib. by RIV:
!
Regional Adrninistrator
Resident inspector
DRP Director
DRS-PSB
' Branch Chief (DRP/D)
MIS System
~
'
Project Engineer (DRP/D)
RIV File
i
Hranch Chief (DRP/lSS)
Leah Tremper (OC/LFDCB, MS: TWFN 9E10)
G. Sanborn, Region IV
W. L. Brown, RC
J. Lieberman, OE, MS: 7-HS
DE:EA File, MS: 7-H5
i
'
.
t
J
l
!
.
i
l
'
i
1
.
4
DOCUMENT NAME: R:\\_WAT)WT7 4RP.LAK
f
j
io recev, copy or eocom=ne. trees = m now c = copy weout enchwures m = copy wm encio ure. *w = No copy
)
RIV: SRI
l
C:DRP/M yyb
D:DRP
,n )
]
l
/
1
q
LAKeller
PHHerr{f! QF TPGwynn }(9
j
,
04/13/97
04/M9fK/
03/f;W97 7
i
i plC!AL RECORD col'Y
'-
2Yo/
uoop9
11 !! lll1'll!Ill,l!1ll
.
.