Forwards Insp Rept 50-382/97-04 on 970223-0405 & Notice of Violation
ML20138K217
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20138K222 List:
References
50-382-97-04, 50-382-97-4, EA-97-101, EA-97-156, NUDOCS 9705120272
Download: ML20138K217 (5)


See also: IR 05000382/1997004

Text

I

e

,

pW49

UNITED STATES

  1. p

k

9

NUCLEAR REGULATORY COMMISSION

e

g

REGloN iv

%

8

611 RYAN PLAZA drive, SulTE 400

%....+/

ARLINGTON. TEXAS 76011-8064

May 5, 1997

'

EA 97101

EA 97-156

'

.

Charles M. Dugger, Vice President

Operations - Waterford 3

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

SUBJECT: NRC INSPECTION REPORT 50-382/97-04. AND NOTICE OF VIOLATION

Dear Mr. Dugger:

An NRC inspection was conducted February 23 through April 5,1997, at your Waterford

Steam Electric Station, Unit 3 reactor facility. The enclosed report presents the scope and

results of that inspection.

,

During the 6-week period covered by this inspection period, your conduct of activities at

Waterford 3 was generally characterized by good performance of operations, maintenance,

engineering, and plant support. However, violations of NRC requirements were identified.

,

Violation A identified numerous examples of the failure to comply with the Technical

Specification requirements for the use of overtime. The violation reflects a weakness in

management oversight and ownership for the control of overtime, which could affect the

quality of safety-related activities.

'

Violation B involved the failure of your staff to recognize that Shield Building Ventilation

Train B failed its Technical Specification surveillance for maximum air flow and your

,

i

surveillance review process allowed the surveillance failure to go undetected for a period of

time greater than the Technical Specification allowed outage time for that equipment.

Further, your failure to recognize that Train 8 did not comply with the surveillance

i

requirements allowed the other train to be taken out of service for maintenance without

recognition that both trains would be rendered inoperable.

Violation C involved two examples of inadequate 10 CFR 50.59 evaluations. Personnel

t

involved in the preparation and review of these evaluations demonstrated inadequate

t

knowledge of Technical Specification requirements for containment isolation valves. As a

result of these inadequate evaluations, an instance was identified of failure to comply with

the Technical Specification requirement for direct position indication for containment

isolation valves, which caused the Technical Specification allowed outage time to be

i

exceeded without the required actions being taken.

!

l

<

.

9705120272 970505

PDR

ADOCK 05000382

G

PDR

,

>

i

-_

. __

_ _ _ _ _ _ _

_

_ _ _ . .

_ _ .

. - -_ .- _ _ _

...

.

_

.

____

.

Entergy Operations, Inc.

-2-

,

The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are described in detailin the enclosed report. Please note that

7

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

,

!

to determine whether further enforcement action is necessary to ensure compliance with

'

regulatory requirements.

I

i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room

(PDR). To the extent possible, your response should not include any personal privacy,

-

proprietary, or safeguards information so that it can be placed in the PDR without

redaction.

!

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

>

Sincerely,

'

N.

l

Thomas P. Gwynn, Director

'

Division of Reactor Projects

,

i

Docket No.:- 50-382

License No.: NPF-38

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-382/97-04

cc w/ enclosures:

Executive Vice President and

l

Chief Operating Officer

Entergy Operations, Inc.

l

P.O. Box 31995

i

'

Jackson, Mississippi 39286-1995

'

i

j

Vice President, Operations Support

Entergy Operations, Inc.

i

P.O. Box 31995

i

Jackson, Mississippi 39286-1995

1

,

'

l

I

_ .__

.. __. . . _ _ . . . _ _ . _ . _ . _ _ _ . . . . _ _ . . . _ _ _

_ _ . . . . _

.

.

t

!

Entergy Operations, Inc.

-3-

,

,

Wise, Carter, Child & Caraway

!

P.O. Box 651

Jackson, Mississippi 39205

,

General Manager, Plant Operations

'

Waterford 3 SES

,

'

Entergy Operations, Inc.

i

P.O. Box B

Killona, Louisiana 70066

'

Manager.- Licensing Manager

!

!

Waterford 3 SES

Entergy Operations, Inc.

l

!

P O. Box B

Killona, Louisiana 70066

i

Chairman

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

.

Director, Nuclear Safety &

Regulatory Affairs

i

Waterford 3 SES

l

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

William H. Spell, Administrator

Louisiana Radiation Protection Division

P.O. Box 82135

j

Baton Rouge, Louisiana 70884-2135

t

Parish President

'

St. Charles Parish

!

P.O. Box 302

!

'

Hahnville, Louisiana 70057

Mr. William A. Cross

.Bethesda Licensing Office

I

'

3 Metro Center

Suite 610

!

!

Bethesda, Maryland 20814

!

i

- _

_

.-

- - . .

,.

..,

. _ _ _ _ _ _ _ _ _ _ - _ _ . _ _ _ _ - _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - __-____ ____-_____- __

.

Entergy Operations, Inc.

-4-

Winston & Strawn

1400 L Street, N.W.

Washington, D.C. 20005-3502

,

.

ne e

l

i

i

j

..

.__

..-

_ _ . _ _ _

__

_.

.

... _

_ . _ . _

_

. _.__

_

't

o'

04/28 67

09:35

R IV US tRC FTS

002

,

,

,

!

4

- ,

,

Entergy Operations, Inc.

5-

I

a.

E-Mail report to T. Boyce (THB)

I

.

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

l

'

E-Mail report to Richard Correia (RPC)

,

E Mail report to Frank Talbot (FXT)

'

bec to DCD, (lE01)

I

t>cc distrib. by RIV:

!

Regional Adrninistrator

Resident inspector

DRP Director

DRS-PSB

' Branch Chief (DRP/D)

MIS System

~

'

Project Engineer (DRP/D)

RIV File

i

Hranch Chief (DRP/lSS)

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

G. Sanborn, Region IV

W. L. Brown, RC

J. Lieberman, OE, MS: 7-HS

DE:EA File, MS: 7-H5

i

'

.

t

J

l

!

.

i

l

'

i

1

.

4

DOCUMENT NAME: R:\\_WAT)WT7 4RP.LAK

f

j

io recev, copy or eocom=ne. trees = m now c = copy weout enchwures m = copy wm encio ure. *w = No copy

)

RIV: SRI

l

C:DRP/M yyb

D:DRP

,n )

]

l

/

1

q

LAKeller

PHHerr{f! QF TPGwynn }(9

j

,

04/13/97

04/M9fK/

03/f;W97 7

i

i plC!AL RECORD col'Y

'-

2Yo/

uoop9

11 !! lll1'll!Ill,l!1ll

.

.