ML20138K217

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-382/97-04 on 970223-0405 & Notice of Violation
ML20138K217
Person / Time
Site: Waterford Entergy icon.png
Issue date: 05/05/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dugger C
ENTERGY OPERATIONS, INC.
Shared Package
ML20138K222 List:
References
50-382-97-04, 50-382-97-4, EA-97-101, EA-97-156, NUDOCS 9705120272
Download: ML20138K217 (5)


See also: IR 05000382/1997004

Text

e I

,

pW49 UNITED STATES

  1. p

9

k e NUCLEAR REGULATORY COMMISSION

l

g REGloN iv

% 8 611 RYAN PLAZA drive, SulTE 400

%....+/ ARLINGTON. TEXAS 76011-8064

May 5, 1997 '

EA 97101

EA 97-156 '

.

Charles M. Dugger, Vice President

Operations - Waterford 3

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

SUBJECT: NRC INSPECTION REPORT 50-382/97-04. AND NOTICE OF VIOLATION

Dear Mr. Dugger:

An NRC inspection was conducted February 23 through April 5,1997, at your Waterford

Steam Electric Station, Unit 3 reactor facility. The enclosed report presents the scope and

results of that inspection. ,

During the 6-week period covered by this inspection period, your conduct of activities at

l

Waterford 3 was generally characterized by good performance of operations, maintenance,

engineering, and plant support. However, violations of NRC requirements were identified. ,

Violation A identified numerous examples of the failure to comply with the Technical

Specification requirements for the use of overtime. The violation reflects a weakness in

management oversight and ownership for the control of overtime, which could affect the

quality of safety-related activities. '

Violation B involved the failure of your staff to recognize that Shield Building Ventilation ,

Train B failed its Technical Specification surveillance for maximum air flow and your i

surveillance review process allowed the surveillance failure to go undetected for a period of

time greater than the Technical Specification allowed outage time for that equipment.

Further, your failure to recognize that Train 8 did not comply with the surveillance i

requirements allowed the other train to be taken out of service for maintenance without

recognition that both trains would be rendered inoperable.

t

Violation C involved two examples of inadequate 10 CFR 50.59 evaluations. Personnel

involved in the preparation and review of these evaluations demonstrated inadequate t

knowledge of Technical Specification requirements for containment isolation valves. As a

result of these inadequate evaluations, an instance was identified of failure to comply with

the Technical Specification requirement for direct position indication for containment  ;

isolation valves, which caused the Technical Specification allowed outage time to be i

exceeded without the required actions being taken.

!

l<

.

9705120272 970505

PDR ADOCK 05000382 ,

G PDR

>

i

-_ . __ _ _ _ _ _ _ _ _ _ _ _ . . _ _ . . - -_ .- _ _ _ ... . _ . ____

.

Entergy Operations, Inc. -2-

,

The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances

surrounding the violations are described in detailin the enclosed report. Please note that 7

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part,

,

!

to determine whether further enforcement action is necessary to ensure compliance with '

regulatory requirements. I

i

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure (s), and your response will be placed in the NRC Public Document Room -

(PDR). To the extent possible, your response should not include any personal privacy,

proprietary, or safeguards information so that it can be placed in the PDR without

redaction.

!

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

>

Sincerely,

'

l

Thomas P. Gwynn, Director

N.

'

Division of Reactor Projects ,

i

Docket No.:- 50-382

License No.: NPF-38

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-382/97-04

cc w/ enclosures:

Executive Vice President and

l Chief Operating Officer  :

Entergy Operations, Inc.  :

l

P.O. Box 31995 i'

Jackson, Mississippi 39286-1995

'

i

j Vice President, Operations Support

i Entergy Operations, Inc.

P.O. Box 31995 i

Jackson, Mississippi 39286-1995

1 ,

'

1

1

1

l

I

_ .__ .. __. . . _ _ . . . _ _ . _ . _ . _ _ _ . . . . _ _ . . . _ _ _ _ _ . . . . _ .

.

t

!

Entergy Operations, Inc. -3-

,

,

Wise, Carter, Child & Caraway  !

P.O. Box 651 *

Jackson, Mississippi 39205

,

General Manager, Plant Operations '

,

Waterford 3 SES '

Entergy Operations, Inc. i

P.O. Box B

Killona, Louisiana 70066

'

Manager.- Licensing Manager  !

!

Waterford 3 SES

Entergy Operations, Inc. l

!

P O. Box B

Killona, Louisiana 70066

i

Chairman  ;

Louisiana Public Service Commission

One American Place, Suite 1630

Baton Rouge, Louisiana 70825-1697

.

Director, Nuclear Safety &

Regulatory Affairs i

Waterford 3 SES l

Entergy Operations, Inc.

P.O. Box B

Killona, Louisiana 70066

William H. Spell, Administrator

Louisiana Radiation Protection Division

P.O. Box 82135

Baton Rouge, Louisiana 70884-2135 j

t

Parish President '

!

St. Charles Parish

P.O. Box 302  !

'

Hahnville, Louisiana 70057

Mr. William A. Cross

.Bethesda Licensing Office I

'

3 Metro Center

Suite 610  !

!

Bethesda, Maryland 20814

!

i

- _ _

. _ _ _ _ _ _ _ _ _ _ - _ _ . _ _ _ _ - _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - __-____ ____-_____- __

.

Entergy Operations, Inc. -4-

Winston & Strawn

1400 L Street, N.W.

,

Washington, D.C. 20005-3502

.

ne e

l

i

i

j

l

.. .__ ..- _ _ . _ _ _ __ _. . ... _ _ . _ . _ _ . _.__ _

,

't o'

,

04/28 67 09:35 R IV US tRC FTS 002 ,

!

4

-,

,

Entergy Operations, Inc. 5-

a. I

. E-Mail report to T. Boyce (THB) I

E-Mail report to NRR Event Tracking System (IPAS)  ;

'

E-Mail report to Document Control Desk (DOCDESK) l

, E-Mail report to Richard Correia (RPC)

E Mail report to Frank Talbot (FXT)

'

I

bec to DCD, (lE01)

t>cc distrib. by RIV:

! Regional Adrninistrator Resident inspector

DRP Director DRS-PSB

~

' Branch Chief (DRP/D) MIS System

Project Engineer (DRP/D)

'

RIV File i

Hranch Chief (DRP/lSS) Leah Tremper (OC/LFDCB, MS: TWFN 9E10)

G. Sanborn, Region IV W. L. Brown, RC

J. Lieberman, OE, MS: 7-HS DE:EA File, MS: 7-H5

i

'

.

t

J

l

!

.

i I

l

'

i

1

l

.

4

DOCUMENT NAME: R:\_WAT)WT7 4RP.LAK f j

io recev, copy or eocom=ne. trees = m now c = copy weout enchwures m = copy wm encio ure. *w = No copy

)

RIV: SRI l C:DRP/M yyb D:DRP q ,n 1 ) ] l /

LAKeller PHHerr{f! QF TPGwynn }(9

,

j

04/13/97 04/M9fK/ 03/f;W97 7 i

'-

i plC!AL RECORD col'Y

2Yo/

uoop9 11 !! lll1'll!Ill,l!1ll

.

.