ML20138K067

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation on 831025 & 850918 Responses to Generic Ltr 83-28,Item 1.1 Re post-trip Review Program Description & Procedures
ML20138K067
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 12/12/1985
From: Zwolinski J
Office of Nuclear Reactor Regulation
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20138K073 List:
References
GL-83-28, NUDOCS 8512180264
Download: ML20138K067 (3)


Text

.

I

- Docket No. 50-409-Mr. James W.~ Taylor-General Manager Dairyland Power Cooperative

- 2615 East-Avenue South La Crosse, Wisconsin 54601

Dear Mr. Tay1or:

SUBJECT:

' GENERIC LETTER 83-28, ITEM 1.1, POST-TRIP REVIEW PROGRAM DESCRIPTION AND PROCEDURES Re:

La Crosse Boiling Water Reactor By letters dated October 25, 1983 and September 18, 1985, you responded to Generic Letter 83-28 with regard to required actions based on generic implications of Salem ATWS events. We have reviewed the portions of your responses' applicable to Item 1.1 of Generic Letter 83-28 and conclude that the Post-Trip Review Program and Procedures at the La Crosse Boiling Water Reactor are acceptable.

. We have enclosed our safety evaluation and conclude that all staff concerns on this topic have been resolved.

Sincerely, W w ed my John A. Zwolinski, Director BWR Project Directorate #1 Division of BWR Licensing

Enclosure:

- Safety. Evaluation

- cc w/ enclosure:

See next page u

Local PDR DVassallo BWD#1 Reading OELD fdor B512180264 e51212 BGrimes p[

^

0 CJamerson

. JZwolinski RBernero:

~

ACRS (10)

DBL:PD#[1.

DBL:PD#

DBL:PD#1 CJamerson JStang:tm -

JZwolinski g /f/85' g/ru/85 1 t /&/85

/

'o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

s a

wAsumorow o.c.20sss l

'*o.,,,

December 12, 1985 y

j Docket No. 50-409

\\

. i,

)

I

(

Mr. James W. Taylor General Manager Dairyland Power Cooperative 2615 East Avenue South La Crosse, Wisconsin 54601

Dear Mr. Taylor:

F

SUBJECT:

GENERIC LETTER 83-28, ITEM 1.1, POST-TRIP REVIEW PROGRAM DESCRIPTION AND PROCEDURES Re:

La Crosse Boiling Water Reactor By letters dated October 25, 1983 and September 18, 1985, you responded to Generic Letter 83-28 with regard to required actions based on generic implications of Salem ATWS events. We have reviewed the portions of your

. responses applicable to Item 1.1 of Generic Letter 83-28 and conclude that the Post-Trip Review Program and Procedures at the La Crosse Boiling Water Reactor are acceptable.

i We have enclosed our safety evaluation and conclude that all staff concerns E

on this topic have been resolved.

F Sincerely, 0

John Zwolinski, Director BWR Project Directorate #1 L

Division of BWR Licensing

Enclosure:

Safety Evaluation 1

cc w/ enclosure:

il See next page i

1

(

ghe s

M%

eper-a w

.w e

W4*'NN 3-e=

e'sa-emeW-%**s=

---s+

" ^ ~ '

1 g

Mr.-James W.. Taylor Dairyland Power Cooperative La Crosse Boiling Water Reactor cc:

i Fritz Schubert, Esquire Clarence Riederer, Chief Engineer Staff Attorney Wisconsin Public Service i

Dairyland Power Cooperative Commission

[

,2615 East Avenue South.

Post Office Box 7854 4

La Crosse, Wisconsin 54601 Madisen, Wisconsin 53707

0. S. Heistand, Jr., Esquire Morgan, Lewis & Bockius 1800 M Street, N.W.

Washington, D.C.

20036 Mr. John Parkyn, Plant Manager

'7 La Crosse Boiling Water Reactor Dairyland Power Cooperative P. O. Box 275 Genoa, Wisconsin 54632 r

U.S. Nuclear Regulatory Commission Resident Inspectors Office Rural Route #1, Box 276 Genoa, Wisconsin 54632 Town Chairman Town of Genoa Route 1 Genoa, Wisconsin 54632 Chairman, Public Service Commission of Wisconsin Hill Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road lI Glen Ellyn, Illinois 60137