Text
o us
. [($
Io UNITED STATES g
3, g
NUCLEAR REGULATORY COMMISSION a
wAssiworow. o. c. rosss PHILADELPHIA ELECTRTC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY
~~
ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.115 License No. DPR-44 1.
The Nuclear Regulatory Comission (the Comissioni has found that:
A.
The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated February 19, 1985, as amended by letter dated August 27, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-44 is hereby amended to read as follows:
8512170593 851210 PDR ADOCK 05000277 P
- PDR,
+
. Technical Specifications The Technical Specifications contained in Appendices v
A and B, as revised through Amendment No.115, are hereby incorporated in the license.
PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY C ISSION w
Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing
Attachment:
Changes to the Technical Specifications Date of issuance:
December 10, 1985
.c,
ATTACHMENT TO LICENSE AMENDMENT NO.115 FACILITY OPERATING LICENSE NO. DPR-44 DOCKET NO. 50-277 a
s=
Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain a vertical line indicating the area of change.
Remove Insert 206 206 211 211 214 214 i
i e
n
....:. ~. r. -
PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.8.B.3.d and 3.8.B.3.e, month and an instrument below.
check shall be performed c.
The effluent control every day during release.
monitor shall be set in Functional test shall accordance with the demonstrate operability methodology and parameters of the radwaste discharge in the ODCM to alarm and automatic isolation valve, automatically close the and control room an-waste discharge valve nunciation if any of the prior to exceeding the following conditions exist:
limits specified in 1.
Instrument indicates 3.8.B.1 above.
measured levels above d.
From and after the date the alarm / trip set-that the gross activity point.
monitor on the waste 2.
Instrument indicates effluent line is made an INOP failure.
l or found to be inoperable 3b.
The liquid effluent flow for any reason, effluent monitor shall be cali-releases may continue brated every 12 months.
only if best ef forts Additionally, an instru-are taken to make such ment check shall be monitor operable, performed every day provided that prior during release.
to initiating a r
release:
l.
At least two independent samples of the tank's contents are analyzed, and 2.
At least two technically qualified members of the Facility Staff independently verify the release rate cal-culation and discharge line valving.
O.
From and after the date that the flow monitor on the waste effluent line is made or found to be inoperable
.for any reason, effluent releases via this pathway may continue only if best efforts are taken to make such monitor operable, provided that the flow rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during actual releases.
Pump performance curves Amendment No. RJ, 177, 115
-206-
PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS and one main stack shall also demonstrate that noble gas monitor control room alarm an-shall be operable and set nunciation occurs if any of to alarm in accordance the following conditions exist:
with the methodology 1.
Instrument indicates and parameters in the measured levels ODCM. From and after the above the alarm date that both reactor setpoint.
building exhaust vent 2.
Instrument indicates monitors or both main a downscale failure.
stack noble gas monitors Additionally, an instrument are made or found to be check shall be performed inoperable for any reason, every day.
effluent releases via 4b.
The reactor building their respective pathway exhaust vent and the may continue provided at main stack flow rate least two independent monitors shall be grab samples are taken calibrated every 12 at least once per 8 hrs.
months. Additionally, an and these samples are instrument check shall analyzed for gross be performed every day.
activity within 24 4c.
hours, and at least two The reactor building exhaust vent and the main technically qualified stack iodine and particulate members of the facility sample flow rate monitors staff independently verify the release shall be calibrated every 12 months. Additionally, rate calculations.
an instrument check shall One reactor building c.
exhaust vent iodine be performed every day for the reactor building filter and one main stack iodine filter exhaust vent sample flow rate monitors, and every and one reactor build-ing exhaust vent week for the main stack sample flow rate monitor.
particulate filter 4d.
The main stack sample and one main stack flow line Hi/Lo pressure particulate filter with switches shall be their respective flow functionally tested every rate monitors shall be 6 months and calibrated cperable. From and after every 18 months.
the date that all iodine filters or all particulate filters for either the reactor building exhaust vent monitor or the main otack monitor are made or found to be inoperable for cny reason, effluent relenses via their respective pathway may Anendment No. 197, 115
-211-lU
PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS pursuant to Specification 6.9.3 a Special Report which includes the following informations a.
Explanation of why gaseous i
radwaste was being dis-(
charged without treatment, identification of any inoperable equipment or subsystems and the reason for its inoperability.
b.
Action taken to restore the inoperable equipment to operable status.
c.
Summary description of action taken to prevent a recurrence.
l Reactor shutdown is not j
required.
6.
The concentration of hydrogen 6a. An instrument check of the i
downstream of the recombiners operation of the hydrogen shall be limited to less monitors shall be performed than or equal to 24 by once per day.
i volume.
I
- a. With the concentration 6b. The hydrogen monitors and
[
of hydrogen downstream associated alarms downstream of the recombiner greater of the recombiner shall than 24 but less than or be calibrated once per t
equal to 44 by volume, month using standard gas restore the concentration containing 0-44 hydrogen, to within the limit within balance nitrogen or air l
48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
by volume as specified
- b. With the concentration of in the ODCM.
l hydrogen downstream of the recombiner greater than 44 by volume, an orderly l
reduction of power shall be initiated within one hour to bring the hydrogen down-i stream of the recombiner to less than or equal to 24 by volume.
i
- c. Except as specified in 3.8.C.6.d, two hydrogen 3
monitors downstream of the recombiners shall be I
i l
operable during power l
operation.
j Amendment No. JPR,115
-214-
\\
l_
fo, UNITED STATES
'[4
{,p g
NUCLEAR REGULATORY COMMISSION s.
L WASHINGTON, D. C. 20555
\\...+/
PHILACELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY
==
ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION, UNIT NO. 3 AMENDMENT TO FACTLITY OPERATING LICENSE Amendment No.119 License No. OPR-56 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Philadelphia Electric Company, et al. (the licensee) dated February 19, 1985, as amended by letter dated August 22, 1985, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:
l
. Technical Specifications
.The Technical Specifications contained in Appendices A and B, as revised through Amendment No.119, are hereby incorporated in the license.
PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULA10RY COMMISSION r
d' Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance: December 10, 1985 I
o,-,-
ATTACHMENT TO LICENSE AMENDMENT NO.119 FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 4
g.
Replace the following pages of the Appendix "A" Technical Specifications with the enclosed pages. The revised pages are identified by Amendment number and contain a vertical line indicating the area of change.
Remove Insert
?O6 206 211 211 1
214 214 i
i b
l 2
l s
t
. e __-
~
PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIRE!!ENTS 3.8.B.3.d and 3.8.B.3.e, month and an instrument below.
c.
The effluent control check shall be performed every day during release.
monitor shall be set in Functional test shall accordance with the demonstrate operability methodology and parameters of the radwaste discharge in the ODCf! to alarm and automatic isolation valve, automatically close the and control room an-waste discharge valve nunciation if any of the prior to exceeding the following conditions exist:
limits specified in 1.
Instrument indicates a
3.8.B.1 above.
measured levels above J
d.
From and after the date the alarm / trip set-that the gross activity point.
monitor on the waste 2.
Instrument indicates effluent line is made an INOP failure.
l or found to be inoperable 3b.
The liquid effluent flow for any reason, effluent monitor shall be cali-releases may continue brated every 12 months.
only if best efforts Additionally, an instru-are taken to make such ment check shall be monitor operable, performed every day provided that prior during release.
to initiating a release:
1.
At least two independent samples of the tank's contents are analyzed, and 2.
At least two technically qualified members of the Facility Staff independently verify the release rate cal-culation and discharge line valving.
e.
From and after the date that the flow monitor on the waste effluent line is made or found to be inoperable for any reason, effluent releases via this pathway may continue only if best efforts are taken to make such monitor operable, provided that the flow
~
rate is estimated at least once per 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> during actual releases.
Pump performance curves Amendment No. 7$,19),119
-206-
PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS and one main stack shall also demonstrate that noble gas monitor control room alarm an-shall be operable and set nunciation occurs if any of 1
to alarm in accordance the following conditions exig.t:
i with the methodology 1.
Instrument indicates and parameters in the measured levels ODCM. From and af ter the above the alarm date that both reactor setpoint.
I building exhaust vent 2.
Instrument indicates monitors or both main a downscale failure, stack noble gas monitors Additionally, an instrument are made or found to be check shall be performed inoperable for any reason, every day.
effluent releases via 4b.
The reactor building l
their respective pathway exhaust vent and the may continue provided at main stack flow rate least two independent monitors shall be grab samples are taken calibrated every 12 at least once per 8 hrs.
months. Additionally, an and these samples are instrument check shall analyzed for gross be performed every day, activity within 24 4c.
The reactor building hours, and at least two exhaust vent and the main technically qualified stack iodine and particulate members of the facility sample flow rate monitors staff independently shall be calibrated every verify the release 12 months. Additionally, rate calculations.
an instrument check shall c.
One reactor building be performed every day exhaust vent iodine for the reactor building filter and one main exhaust vent sample flow stack iodine filter rate monitors, and every and one reactor build-week for the main stack ing exhaust vent sample flow rate monitor.
particulate filter 4d.
The main stack sample and one main stack flow line Hi/Lo pressure particulate filter with switches shall be their respective flow functionally tested every rate monitors shall be 6 months and calibrated operable. From and after every 18 months.
the date that all iodine l
filters or all particulate filters for either the l
reactor building exhaust i
vent monitor or the main otack monitor are made or found to be inoperable for cny reason, effluent releases via their respective pathway may Amendment No. Jpp,119
-2 6
PBAPS LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS pursuant to Specification 6.9.3 a Special Report which includes the following information:
a.
Explanation of why gaseous radwaste was being dis-charged without treatment, ideatification of any inoperable equipment er subsystems and the reason for its inoperability.
b.
Action taken to restore the inoperable equipment to operable 1tatus.
c.
Summary deseription of action taken to prevent a recurrence.
Reactor shutdown is not required.
6.
The concentration of hydrogen 6a. An instrument check of the downstream of the recombiners operation of the hydrogen shall be limited to less monitors shall be performed than or equal to 24 by once per day.
volume.
- a. With the concentration 6b. The hydrogen monitors and of hydrogen downstream associated alarms downstream of the recombiner greater of the recombiner shall than 24 but less than or be calibrated once per equal to 44 by volume, month using standard gas restore the concentration containing 0-44 hydrogen, to within the limit within balance nitrogen or air i
48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.
by volume as specified
- b. With the concentration of in the ODCM.
hydrogen downstream of the recombiner greater than 4%
by volume, an orderly reduction of power shall be initiated within one hour to bring the hydrogen down-stream of the recombiner to less than or equal to 24 by volume.
- c. Except as specified in 3.8.C.6.d, two hydrogen monitors downstream of the recombiners shall be l
operable during power operation.
Amendment No. 7#,119
-214-
.