ML20138J419

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-295/85-36 & 50-304/85-38 on 851008-1118 & Notice of Violation
ML20138J419
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 12/10/1985
From: Chrissotimos N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20138J422 List:
References
NUDOCS 8512170520
Download: ML20138J419 (2)


See also: IR 05000295/1985036

Text

m

o , M/M

DEC 10 25

,

Docket No. 50-295

Docket No. 50-304

-

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by NRC inspectors

M. M. Holzmer, L. E. Kanter and J. N. Kish of this office on October 8

through November 18, 1985 of activities at the Zion Nuclear Generating

Station, authorized by License Numbers DPR-39 and DPR-48 and to the

discussion of our findings with Mr. G. Pliml at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed Appendix. A written

response is required.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)

will be placed in the NRC Public Document Room.

The responses directed by this letter (and the accompanying Notice) are not

subject to the clearance procedures of the Office of Management and Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

N. J. Chrissotimos, Chief

ProjectsBranch2

Enclosure: Inspection Reports

No. 50-295/85036(DRP); and

No. 50-304/85038(DRP)

See Attached Distribution

0512170520 051210

DR ADOCK 0500 5 ]E p g ' td

F

- .

Commonwealth Edison Company 2

DFC t 02

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

G. Plim1, Station Manager

Jan Norris, Project Manager, NRR

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

Mayor, City of Zion

RIII RI RIII

Jr1

Suermann/mj

m

Hehl

e Ik

Ch}Tssotimos

12/06/85

,