Letter Sequence Other |
|---|
|
Results
Other: B11335, Forwards Procedures Re Degraded Grid Voltage,Including Change 2,Rev 4 to OP2347B, Normal Station Svc Transformer 15G-2S & Change 2,Rev 5 to OP 2347A, Reserve Station Svc Transformer 15G-22S, B11803, Forwards Change 1,Rev 5 to Procedure OP2347B, Normal Station Svc Transformer 15G-2S (Nsst). Encl Change Suppls 841204 Submittal Re Procedures for Degraded Grid Voltage, ML20101D056, ML20101D060, ML20101D065, ML20138J300
|
MONTHYEARML20101D0651983-04-0707 April 1983 Change 1,Rev 2 to Procedure OP 2384, Engineered Safeguards Actuation Sys Operation Project stage: Other ML20101D0601983-12-0202 December 1983 Change 2,Rev 5 to Procedure OP 2347A, Reserve Station Svc Transformer 15G-22S Project stage: Other A03999, Responds to 840427 Request for Schedule for Submitting Procedures Re Degraded Grid Voltage.Unit 2 Procedures Will Be Submitted by 840629.Unit 1 Procedures Will Be Submitted in Early 19851984-06-11011 June 1984 Responds to 840427 Request for Schedule for Submitting Procedures Re Degraded Grid Voltage.Unit 2 Procedures Will Be Submitted by 840629.Unit 1 Procedures Will Be Submitted in Early 1985 Project stage: Request ML20101D0561984-08-30030 August 1984 Change 2,Rev 4 to Procedure OP2347B, Normal Station Svc Transformer 15G-2S Project stage: Other B11335, Forwards Procedures Re Degraded Grid Voltage,Including Change 2,Rev 4 to OP2347B, Normal Station Svc Transformer 15G-2S & Change 2,Rev 5 to OP 2347A, Reserve Station Svc Transformer 15G-22S1984-12-0404 December 1984 Forwards Procedures Re Degraded Grid Voltage,Including Change 2,Rev 4 to OP2347B, Normal Station Svc Transformer 15G-2S & Change 2,Rev 5 to OP 2347A, Reserve Station Svc Transformer 15G-22S Project stage: Other ML20138J3001985-08-15015 August 1985 Change 1 to Rev 5 to Procedure OP2347B, Normal Station Svc Transformer 15G-2S (Nsst) Project stage: Other B11803, Forwards Change 1,Rev 5 to Procedure OP2347B, Normal Station Svc Transformer 15G-2S (Nsst). Encl Change Suppls 841204 Submittal Re Procedures for Degraded Grid Voltage1985-10-16016 October 1985 Forwards Change 1,Rev 5 to Procedure OP2347B, Normal Station Svc Transformer 15G-2S (Nsst). Encl Change Suppls 841204 Submittal Re Procedures for Degraded Grid Voltage Project stage: Other ML20138P6951985-10-28028 October 1985 Safety Evaluation of Degraded Grid Voltage Procedure.Revised Operator Procedure OP 2347B,Change 1,provides Acceptable Procedures Covering Operator Actions Required During Degraded Grid Voltage Conditions W/O LOCA Conditions Project stage: Approval ML20138P6871985-10-28028 October 1985 Forwards Safety Evaluation Re Change 1 of Rev 5 to Operating Procedure OP 2347B on Operator Guidance for Protection of Class 1E Electric Sys Under Degraded Grid Conditions. Procedure Acceptable Project stage: Approval 1984-06-11
[Table View] |
Text
- ,
N t#TILETIES cenerei Onices seioen street. Berlin. Connecticut i,Y vi$iNE="
P.O. BOX 270 e'****'<**'"Na*
HARTFORD. CONNECTICUT 06141-0270 L
L J [!(( [*E"*,",",
(203) 665-5000 October 16, 1985 Docket No. 50-336 Bil803 Director of Nuclear Reactor Regulation Attn:
Mr. Edward J. Butcher, Chief Operating Reactors Branch //3 U. S. Nuclear Regulatory Commission Washington, D. C. 20535 Gentlemen:
Millstone Nuclear Power Station, Unit No. 2 Degraded Grid Voltage In our December 4,1984(l) submittal, we enclosed the procedures dealing with degraded grid voltage. We hereby submit a revised copy of procedure OP2347B dated March 22, 1985, as supplementary information to our December 4,1984 submittal.
We trust you find this information satisfactory.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY d,"T.D a
J. F. Opeka '
Senior Vice President 4
By: C. F. Sears Vice President (1)
W. G. Counsil letter to J. R. Miller dated, December 4,1984, Degraded Grid Voltage.
8510290300 851016 DR ADOCK 05000336 p
Rolf 3o ---- A
~-
Docket No. 50-336 Millstone Nuclear Power Station, Unit No. 2 Degraded Grid Voltage l
(
l l
t October,1985