r VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-11 FOR THE MONTH OF NOVEMBER, 1985 8512170467 851130ADOCK050g1 DR ll)

OPERATING 04TA REPORT Docket No.

50-271 Date 851210 Completed by F.J. Burger Telephone (802) 257-7711 OPERATING SDARJS Notes:

1.

Unit Name Vermont Yankee 2.

Reporting Period:

November 3.

Licensed Thermal Power (MWt):

1593 4.

Nameplate Rating (Gross MWe):

540 5.

Design Elect:Ical Rating (Het MWe):514(oc) 504(cc) 6.

Maximum Dependable Capacity (Gross MWe):

535 7.

Maximum Dependable Capacity (Net MWe):

504 8.

If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:

NA%

9.

Power level to which restricted, if any (Net MWe): N/A

10. Reasons for restrictions, if any:

N/A This month Yr-to-Date Cumulative

11. Hours in Reporting Period 720.00 8016.00
12. Number of Hours Reactor was Critical 0.00 6297.13 93111.06
13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
14. Hours Generator On-Line 0.00 6288.28 90718.35
15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
16. Gross Thermal Energy Generated (MWH) 0.00 9550621.00 132109630.50
17. Gross Electrical Energy Generated (MWH) 0.00 3166154.00 43955902.00
18. Net Electrical Energy Generated (MWH) 0.00 2999402.00 41700250.00
19. Unit Service Factor 0.00 78.45 78.44
20. Unit Availability Factor 0.00 78.45 78.44
21. Unit Capacity Factor (using MOC Net) 0.00 74.24 71.54
22. Unit Capacity Factor (using DER Net) 0.00 72.80 70.14
23. Unit Forced Outage Rate 0.00

.32 6.92

24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each):

Refueling outage began September 21, 1985 for 32 weeks.

25. If shut down at end of report period, estimated date of startup:May 3,1986
26. Units in Test Status (prior to commercial operation): N/A Forecast Achieved Initial Criticality Initial Electricity Commercial Operation

r AVERAGE DAILY UNIT POWER LEVEL Docket No.

50-271 Unit Vermont Yankee Date 851210 Completed by F.J. Buroer Telephone (802) 257-7711 MONTH November DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4 0

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 16 0

INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

= -. _ - -

'~

Dock:t No.

50-271 l

Unit Vermont Yrnkee LNIT SHUTDOWNS AND POWER REDUCTIONS Date 851210 Completed by F. J. Burger.

REPORT MONTH November Telephone (802) 257-7711 1

2 3

4 5

No.

Date Type Duration Reason Method of License System Component Cause and Corrective Action to (hours)

Shutting Down Event Code Code Prevent Recurrence Reactor Report #

85-14 851101 S

720 C

1 N/A N/A N/A 1985 Refueling / Maintenance /Recirc (cont]

Pipe Replacement-Outage in progress.

d d

i I

1 2

3 4

i F-Forced A-Equipment Failure (Explain)

Method:

Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)

E-Operator Training and License Examination 4-Other (Explain)

{

F-Administrative 5

G-Operational Error (Explain)

Exhibit I - Same Source.

i H-Other (Explain) 4 i

_~

Dock;t No.

50-271 Unit Vermont YJnkee Date 851210 Completed by F.J. Burger SAFETY-RELATED MAINTENANCE Telephone (802) 257-7711 EQUIPMENT NA TURE OF LER OR OUTAGE f@LFUNCTION CORRECTIVE ACTION MAINTENANCE NLNBER CAUSE RESULT Reactor Recirc Fumps Preventive NA Recommended by Remove Suction Suction Flow Splitters P18-1A and 8 MR85-2436 Supplier Flow Splitters Removed and 85-2437 l

l 1

I I

I l

l I

1 1

I

__... -.~

.. _ ~.-

_. _ _ _ _ - ~.

=.-

Docket No. 50-271 Unit vermont Yankee Date 851210 i

Completed by F.J. Burger Telephone (802) 257-7711 1

REPORT MONTH November t

SLMMRY OF OPERATING EXPERIENCES Highlights l'

Vermont Yankee operated at 0% of rated thermal power for the month.

Gross electrical generation was O

MWH or 0% of design e

electrical capacity.

I i

i Operating Summary i

l The following is a chronological description of plant operations including i

other pertinent items of interest for the months a

l Throughout the reporting period, the plant was shutdown for the 1985 RefuelingA4aintenance/Recirc Pipe Replacement Outage.

i.

I i

J t

i l

i 1

I I

i i

i k

i

}

i I

i-

. _ -.... -. ~.,.

....~

VERMONT YANKEE NUCLEAR POWER CORPOR ATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 VYV 85-501 December 10, 1985 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D. C.

20555 Dear Sirs Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of November,1985.

Very truly yours, VERMONT YAWEE NUCLEAR POWER CORPORATION Vice President and {

Warren P Murphy Manager of Operations WPMgJB/tec:MSR1.lA45R A