Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198H5541997-12-29029 December 1997 SER Accepting Request for Approval of ASME Case N-498,rev 1, as an Alternative to Required Hydrostatic Pressure Test for Plant,Unit 2 ML20197K1541997-12-18018 December 1997 SER Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 Service Water Piping for North Anna Power Station,Per Util 970919 Submittal ML20199L0501997-11-24024 November 1997 SER Accepting Inservice Insp Program Relief Request NDE-32 ML20199E4971997-11-14014 November 1997 Safety Evaluation Authorizing Proposed Alternative of Licensee Relief Requests NDE-35 & NDE-37,for Plant,Units 1 & 2 During Second 10 Yr Interval ML20217E0701997-09-24024 September 1997 Safety Evaluation Granting Licensee ASME Section XI Relief Request NDE-33 at Plant,Unit 1 ML20217E2411997-09-24024 September 1997 SER Accepting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 Service Water Piping,Virginia Electric & Power Co,North Anna Power Station,Unit 1 ML20217E1871997-09-24024 September 1997 SER Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 Service Water Piping,Virginia Electric & Power Co,North Anna Power Station,Units 1 & 2 ML20149L2001997-07-29029 July 1997 SER Granting Requests for Relief NDE-33,34 & 35 Re ISI Program,Per 10CFR50.55a(g)(6)(i) ML20149F1321997-07-17017 July 1997 Safety Evaluation Supporting Amends 205 & 186 to Licenses NPF-4 & NPF-7,respectively ML20148H1971997-06-0404 June 1997 Safety Evaluation Granting Licensee Relief Request NDE-31 Related to Inservice Insp Program ML20140F4811997-04-30030 April 1997 Safety Evaluation Accepting Licensee 951207 Proposed Alternative in Request for Relief SPT-16 Re Second 10-yr Interval Inservice Insp Program for Unit 2 ML20133G1561997-01-10010 January 1997 Safety Evaluation Accepting Second 10-year Relief Requests for Relief Numbers NDE-27,NDE-28 & NDE-29 ML20133G1911997-01-10010 January 1997 Safety Evaluation Accepting Second 10-year Interval Inservice Insp Plan Relief Request NDE-30 ML20138G1931996-10-16016 October 1996 SER Accepting Second 10-year Interval Inservice Insp Plan Request for Relief SPT-14,rev 1 Virginia Electric & Power Co North Anna Power Station,Unit 2 ML20128P1701996-10-10010 October 1996 Safety Evaluation Supporting Second 10-year Interval Inservice Insp Program Plan Requests for Relief NDE-23 Through NDE-30 for Plant Unit 2 ML20128F5981996-10-0101 October 1996 Safety Evaluation Authorizing Licensee Proposed Alternative to Examine Terminal End Welds on Lower Regenerative Heat Exchanger sub-vessels,per 10CFR50.55a(a)(3)(ii) ML20059M1181993-11-15015 November 1993 SER Accepting Category 3 Qualification in Lieu of Category 2 for Pressure Monitoring Instrumentation ML20057C0401993-09-17017 September 1993 Safety Evaluation Re Inservice Testting Program Requests for Relief ML20126C1221992-12-0404 December 1992 Safety Evaluation Authorizing Util to Continue Current Test Method for Interim Period,Based on Util Plans to Develop & Implement Use of non-intrusive Testing Techniques for Check Valves Following 1993 Unit 2 Refueling Outage ML20125B7251992-12-0303 December 1992 Safety Evaluation Granting Temporary Exemptions from Requirements of GDC-2 & 10CFR50.49 for Phase 1,stage 1 of Svc Water Sys Restoration Project ML20062C4441990-10-18018 October 1990 SER Re Station Blackout.Plant Does Not Conform W/Station Blackout Rule ML20247C2091989-09-0707 September 1989 Safety Evaluation Accepting Util 890512 Response to IE Bulletin 80-11, Masonry Wall Design ML20245J8401989-06-28028 June 1989 Safety Evaluation Supporting Restart of Unit 1 & Util 890528 Response to NRC Bulletin 89-001, Failure of Westinghouse Mechanical Steam Generator Tube Plugs ML20195J0061988-11-29029 November 1988 Safety Evaluation Supporting Licensee Responses to NRC Bulletin 88-002, Rapidly Propagating Fatigue Cracks in Steam Generator Tubes, Subj to Util Adopting Addl Administrative Controls ML20207F1391988-08-12012 August 1988 Safety Evaluation Supporting Util Responses to IE Bulletin 80-11, Masonry Wall Design, W/Exception of One Open Item ML20196G9081988-03-0404 March 1988 SER Re Util 831104 & 850208 Responses to Generic Ltr 83-28, Item 2.2.1, Equipment Classification (Program for All Safety-Related Components. Responses Acceptable ML20149J9301988-02-18018 February 1988 Safety Evaluation Re Relief Request 6 of Inservice Testing Program for Pumps & Valves ML20154E8221987-12-11011 December 1987 Safety Evaluation Supporting Util Identification of Major Causal Factors Leading to 870715 Tube Rupture Event & Adequacy of Diagnostic & Corrective Measures Implemented in Order to Preclude Similar Events ML20237B5981987-12-11011 December 1987 Safety Evaluation Accepting Util 870915 & 0925 Responses to Steam Generator Tube Rupture on 870715.Util Has Adequately Demonstrated That Primary Failure Mechanism Leading to Event Caused by flow-induced Vibration ML20236F4971987-10-23023 October 1987 Safety Evaluation Re Util 870925 Request for Approval of Steam Generator Downcomer Flow Resistance Plate Mods & Increase in Calculated Offsite Dose Per 10CFR50.59.Mods Acceptable ML20235U8811987-07-13013 July 1987 Safety Evaluation Supporting Request for Relief from Certain Exam & Hydrostatic Test Requirements of ASME Code ML20213G8081987-05-11011 May 1987 SER Re Util 850208 Response to Generic Ltr 83-28,Item 2.1 (Part 2), Vendor Interface Programs (Reactor Trip Sys Components. Program Acceptable ML20212K5111987-02-27027 February 1987 SER Accepting Licensee 831104 Response to Generic Ltr 83-28, Item 4.5.2, Reactor Trip Sys Reliability,On-Line Testing ML20207Q0651987-01-0909 January 1987 Safety Evaluation Denying Util 850401 Request to Reduce Number of Thimbles Required for Monthly Surveillance Flux Mapping ML20215D0811986-09-30030 September 1986 Safety Evaluation Granting Util 860613 Request for Relief from Inservice Hydrostatic Test Requirements for Svc Water Spray Sys 1999-09-08
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
Enclosure SAFETY EVALUATION (SUPPLEMENT 1)
BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO GENERIC LETTER 83-28, ITEMS 3.1.1, 3.1.2, 3.2.1. AND 3.2.2 VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION, UNITS 1 AND 2 DOCKET N05. 50-338 AND 50-339
- 1. Evaluation By letters dated Noverrber 4,1983 and February 8,1985 VEPCO, the licensee of North Anna Power Statien, Units 1 and 2, provided information regarding their compliance to Sections 3.1, 3.2, 4.1, and 4.5 of Generic Letter 83-28.
We evaluated the above responses against the NRC staff positions described in the Generic Letter for completegess and adequacy. We concluded that the licensee's responses to Action Items 3.1.1, 3.1.2, 3.2.1, and 3.2.2 were hcomplete and additional information was required to determine accept-avility. The Safety Evaluation with a request for additional information was transmitted to the licensee on June 24, 1985. The licensee responded to our request for additional information in supplemental responses dated August 22, 1985; October 2, 1985; and October 21, 1985. In these letters, the licensee provided supplemental information on Action Items 3.1.1, 3.1.2, 3.2.1, and 3.2.2. We have evaluated those supplemental responses and have concluded that the licensee's responses to the above items are acceptable and meet the intent of Generic Letter (GL) 83-28.
Delineated below are the results of the required evaluations and a brief sumary of the licensee's responses:
- a. Item 3.1.1, Review of Test and Maintenance Procedures and Technical Specifications (ReactorTripSystem)
The licensee's response to this item is acceptable and meets the intent of GL 83-28. The licensee has committed to perform a review of maintenance and test procedures to assure that post-maintenance testing is required and that the testing verifies component capability to, perform its intended safety function. prior to being returned to service. The licensee stated that the procedure review and necessary procedure revisions will be completed by September 1,1987. The licensee also stated.that to ensure that post-maintenance testing will be included in test and maintenance procedures, where applicable, the
~
administrative procedure for processing new and revised procedures will '
be revised to incorporate a step to acknowledge that a. review has becn l performed to determine if post-maintenance' testing is required. The ,
l licensee indicated that the procedure revision will be implemented by 1 November 1, 1985.
R 8512170463 851206 DR ADOCK OSO g 8 i- . .- .
,Lt . . _ . _.
2
- b. Item 3.1.2, Check of Vendor and Engineering Recomendations for Testing and Maintenance (Reactor Trip System Components)
The licensee's response to this item is acceptable and meets the intent of GL 83-28. The licensee stated in their response dated October 21, 1985, that a review will be performed to ensure that previous vendor and engineering recomendations are included in test and maintenance procedures, where applicable. The procedure review and necessary procedure revisions are scheduled to be completed by July 1,1986.
The licensee indicated that approximately 75 procedures must be reviewed to verify that appropriate vendor and engineering recomenda-tions have been incorporated. The licensee also stated that the admin-istrative procedure for processing new and revised procedures will be revised to incorporate a step acknowledging that a review of vendor and engineering recommendations has been performed. This change will help ensure that previous vendor and engineering recomendations are included in test and maintenance procedures. The licensee comitted to implement this procedure revision by November 1,1985.
- c. Item 3.2.1, Review of Test and Maintenance Procedures and Technical Specifications (All Other Safety-Related Components)
The licensee's response to this item is the same as the response provided for Item 3.1.1 above. The licensee comitted to conduct a review of test and maintenance procedures for all safety-related components (including reactor trip system components) to verify that post-maintenance testing is required and that the testing verifies component capability to perform its intended safety functions prior to being returned to service. The licensee stated that the procedure review and necessary procedure revisions will be completed by September 1, 1987. Also, to further ensure that post-maintenance testing will be included in test and maintenance procedures, where applicable, the licensee committed to revise the administrative procedure for processing new and revised procedures to add a step acknowledging that a review has been performed to determine if post-maintenance testing is required. The licensee committed to implement this procedure revision by November 1, 1985.
- d. Item 3.2.2 - Check of Vendor and Engineering Recomendations for
,l Testing and Maintenance (All Other Safety-Related Components)
The licensee's response to this item is acceptable and meets the intent of GL 83-28. The licensee stated in their response dated October 2, 1985, that a review will be performec to ensure that previous vendor and engineering recomendations are included in test and maintenance l
3 procedures, where applicable. The procedure review and necessary procedure revisions will be completed by September 1,1987. The licensee indicated that approximately 800 procedures must be reviewed to verify that appropriate vendor and engineering recommendations have been incorporated. The licensee stated that this number of procedures is significantly less than the total number of test and maintenance procedures because procedures implemented subsequent to June 1984 have incorporated vendor and engineering recommendations in accordance with station administrative procedures. The licensee also stated th'r the administrative procedure for processing new and revised prop?6J 4g " vill
~
be revised to incorporate a step acknowledging that a review of vendor and engineering recommendations has been performed. This change will ensure that previous vendor and engineering recommendations will be included in test and maintenance procedures. The licensee stated that this procedure revision will be implemented by November 1, 1985.
~
- 2. Conclusion Based on review of the information submitted by the licensee in their supplemental responses dated August 22, 1985; October 2, 1985; and October 21, 1985, we conclude that the licensee's actions on GL 83-28 Action Items 3.1.1, 3.1.2, 3.2.1, and 3.2.2 are acceptable and meet the intent of GL 83-28.
. _ , ~ _ __ . - __ _ _