ML20138J063

From kanterella
Jump to navigation Jump to search
Ack Receipt of Rev 8-B to Operating QA Program.Revised QA Program Continues to Satisfy 10CFR50,App B & Acceptable
ML20138J063
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/12/1985
From: Paperiello C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Schnell D
UNION ELECTRIC CO.
Shared Package
ML20138J068 List:
References
NUDOCS 8512170427
Download: ML20138J063 (1)


Text

9 T

DEC 121985

- Docket No. 50-483 Union Electric Company ATTN: Mr. Donald F. Schnell Vice President - Nuclear Post Office Box 149 - Mail Code 400 St. Louis, M0 63166 Gentlemen:

Thank you for the submittal of your Operating Quality Assurance Program, Revision 8-B.

We have reviewed the changes and find that'the revised' program continues to satisfy the requirer.ents of 10 CFR 50, Appendix B, and is acceptable.

We appreciate your submittal of the information req' ired by 10 CFR 50.54(a).

u Please contact Mr. Frank Hawkins of my s.taff (312-790-5555) with any questions you have regarding this matter.

Sincerely, p'

i Carl J. Paperi llo, Director Division of Reactor Safety

-cc:

W. H. Weber, Manager, Nuclear Construction S. E. Miltenberger, Plant Manager R. L. Powers, Assistant Manager, Quality Assurance DCS/RSB (RIDS)

Licensing Fee Management Branch G. T. Ankrum, QAB, IE Resident Inspector, RII_I Region IV K. Drey Chris R. Rogers, P.E.

Utility Division, Missouri Public Service. Comission SNUPPS W

@ly

'R U

RQ,

p Vandel/mab Hawkins Hehl Reyhs

- 12/12/85 8512170427 851212 PDR ADOCK 05000483 P.

PDR h80l

$