ML20138H687
| ML20138H687 | |
| Person / Time | |
|---|---|
| Issue date: | 01/02/1997 |
| From: | Taylor J NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Kress T Advisory Committee on Reactor Safeguards |
| References | |
| ACRS-GENERAL, NUDOCS 9701060176 | |
| Download: ML20138H687 (7) | |
Text
-
= --
o
- d y
UNITED STATES g
,g NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055tMoot o,
/
g.....f January 2, 1997 j
Dr. Thomas S. Kress, Chairman Advisory Committee on Reactor Safeguards U.S. Nuclear Regulatory Commission Washington, D.C.
20555-0001
SUBJECT:
STAFF RESPONSE TO ACRS COMMENTS ON PROPOSED STEAM GENERATOR RULE
Dear Dr. Kress:
I am responding to your letter of November 20, 1996, in which you forwarded the comments of the Advisory Committee on Reactor Safeguards (ACRS) on the technical bases for the proposed steam generator rule and an associated draft regulatury guide.
The staff appreciated the opportunity to brief the ACRS on this matter in November 1996, and the timely response from the committee.
The staff has concluded that additional meetings on the proposed rulemaking are appropriate.
In this regard, NRR and ACRS staff are working to schedule several additional meetings.
It is our intent that the first of these meetings, to be scheduled in the near future, would provide an opportunity to discuss some broad issues related to implementation of risk-informed regulation. These issues are related not only to the proposed steam generator rule, but also to other risk-informed initiatives that the staff has recently presented to the ACRS.
Following the next meeting, we will schedule additional subcommittee and full committee meetings to further discuss the specifics of the proposed steam generator rulemaking.
I would also like to note that it is the staff's intent that the differing professional opinion (DP0) concerns that were presented to the ACRS and summarized in your letter, will be addressed in the rulemaking package.
i a
\\
t>J<
CONTACT: Timothy A. Reed, NRR i
415-1462
['A D W1Acru 060050 QW, y
~ I ',N 9701060176 970102 PDR ACRS
^'
Oa n p (o GENERAL PDR y
Cs, nW m. ;
D,r. Thomas S. Kress.
I appreciate your cooperation with the staff in resolving these issues so that the agency can proceed with the proposed steam generator rulemaking.
Sincerely, Originalsignellty i
James M. Taylor James M. Taylor Executive Director for Operations cc:
Chairman Jackson Commissioner Rogers l
Commissioner Dicus Commissioner Diaz Commissioner McGaffigan i
SECY 4
RSanders i
Tech Editor DISTRIBUTION:
Central File DMorrison PDR EMCB RF HJThompson EJordon JMilhoan JBlaha JMitchell RJones Chiller WHodges t
MMayfield NDudley KBohrer GT G960886 Dross TSpeis SBozin 96-17 DOCUMENT NAME: G:\\ REED \\ACRSEDO.9 4
- SEE PREVIOUS CONCURRENCE To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy Office-
- DE:EMCB C
- DE:EMCB C
- DE:EMCB C
- DE: ADD C
- DE:AD C
Name Treed:
ESullivan KWichman JStrosnider Glainas Date 12/13/96 12/13/96 12/13/95 12/12/96 12/13/96
)
Office
- DSSA:D C
- NRR:AADT C
- NRR:AD[C AIRR:AD Name GHolahan BSheron AThadani j FMiraglia Date 12/16/96 12/27/96 12/27/96 12/#/96 0FFICIAL RECORD COPY r3 o
\\
i+0 Q\\'
JN Y
p
Qr. Thomas S. Kress.
the agency can proceed with the proposed steam generator rulemaking.
Sincerely, James M. Taylor Executive Director for Operations cc:
Chairnan Jackson Commissioner Rogers Commissioner Dicus Commissioner Diaz l
Commissioner McGaffigan SECY RSanders Tech Editor DISTRIBUTION:
Central File DMorrison PDR EMCB RF HJThompson EJordon JMilhoan JBlaha JMitchell RJones CMiller WHodges MMayfield NDudley KBohrer GT G960886 Dross TSpeis SBozin 96-17 DOCUMENT NAME: G:\\ REED \\ACRSEDO.9
- SEE PREVIOUS CONCURRENCE To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy Office
- DE:EMCB E
- DE:EMCB E
- DE:EMCB E
- DE: ADD E
- DE:AD E
Name Treed:
ESullivan KWichman JStrosnider Glainas Date 12/13/96 12/J3496
,Rf Mf 96 12/12/96 12/13/96 Office
- DSSA:D E
dR:AldT bR(AEW/,,7~NRR:AD i
Name GHolahan BSheM ATddani FMiraglia Date 12/16/96 12/L7/96 12/2.1/96 12/ /96 0FFICIAL RECORD COPY Y,f i
2 rssalving these issues so that the agency can proceed with the proposed steam generator rulemaking.
Sincerely, I
James M. Taylor Executive Director for Operations
Attachment:
As stated cc:
Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Diaz Commissioner McGaffigan SECY Tech Editor DISTRIBUTION:
Central File DMorrison PDR EMCB RF HJThompson EJordon JMilhoan JBlaha JMitchell RJones CMiller WHodges MMayfield NDudley KBohrer GT G960886 Dross TSpeis DOCUMENT NAME: G:\\ REED \\ACRSEDO.7 0FFICIAL RECORD COPY
- SEE PREVIOUS CONCURRENCE To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No copy Office EMCB:DE EMCB:DE EMCB:DE
- DD:DE E
D:DE Name Treed:
ESullivan KWickman JStrosnider Glainas Date
/ /96
/ /96
/ /96 12/12/96
/ /96 Office IbDSSA[
ADT:NRR DD:NRR D:NRR Name /' kGHIkkh6n BSheron AThadani FMiraglia Date ' )1-//[/96
/ /96
/ /96
/ /96 I
i l
l
2
~
resolving these issues so that the agency can procesd with the proposed steam I
generator rulemaking.
l Sincerely,
)
James M. Taylor Executive Director for Operations cc:
Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Diaz Commissioner McGaffigan SECY j
Attachment:
As stated DISTRIBUTION-Central File DMorrison PDR EMCB RF I
HJThompson EJordon JMilhoan JBlaha JMitchell RJones CMiller WHodges Mayfield NDudley KBohrer GT G960886 Dross TSpeis DOCUMENT NAME: G:\\ REED \\ACRSEDO.7 0FFICIAL RECORD COPY-
- SEE PREVIOUS CONCURRENCE To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E' - Copy with attachment / enclosure "N" - No copy Office EMCB:DE EMCB:DE EMCB:DE DD:DEfd) f D90$
Name Treed:
ESullivan KWickman JStrosNder ddinas b /th96 fs//l7,/96 Date
/ /96
/ /96
/ /96 t
Office D:DSSA ADT:NRR DD:NRR D:NRR TechEd Name GHolahan BSheron AThadani FMiraglia Date
/ /96
/ /96
/ /96
/ /96
/ /96 i
Qr. Thomas S. Kress.
resolving these issues so that the agency can proceed with the proposed steam generator rulemaking.
4
.i Sincerely, James M. Taylor Executive Director for Operations
Enclosure:
As stated cc:
Chairman Jackson Commissioner Rogers Commissioner Dicus Commissioner Diaz Commissioner McGaffigan SECY Tech Editor i
DISTRIBUTION:
Central File DMorrison PDR EMCB RF HJThompson EJordon JMilhoan JBlaha JMitchell RJones CMiller WHodges MMayfield NDudley KBohrer GT G960886 Dross TSpeis SBozin 96-17 DOCUMENT NAME: G:\\ REED \\ACRSEDO.7
- SEE PREVIOUS CONCURRENCE To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attach 4ent/ enclosure "N" - No copy Office DF22EM E
DE)EkB[ E DL:Fh E DE:* ADD E
DE:AD Name Td[cf N
M kn JStrosnider Glainas Date 12/)3 96 12/43/96 12/d96 12/12/96 12/ /96
/
Office DSSA:D NRR:AADT NRR: ADD NRR:AD Name GHolahan BSheron AThadani FMiraglia Date 12/ /96 12/ /96 12/ /96 12/ /96 0FFICIAL RECORD COPY
D
.u beaWE EDO Principal Correspondence Control FROM:
DUE: 12/17/96 EDO CONTROL: G960886 DOC DT: 11/20/96 T. S. Kress FINAL REPLY:
ACRS TO:
James Taylor FOR SIGNATURE OF :
i
- GRN CRC NO:
i Exeuctive Director DESC:
ROUTING:
PROPOSED RULE ON STEAM GENERATOR IFTEGRITY i
Tay2or Milhoan Thompson Blaha Mitchell DATE: 11/22/96 Morrison,RES l
Paperiello,NMSS Jordan,AEOD ASSIGNED TO:
CONTACT:
Cyr,0GC ACRS File NRR Miraglia -
SPECIAL INSTRUCTIONS OR REMARKS:
Prepare response to ACRS for EDO signature.
Put Commissioners and SECY on cc (shown on original) for reply.
USE SUBJECT LINE IN REPLY.
NRR RECEIVED: NOVEMBER 25, 1996 NRR ACTION:
DE:LAINAS db N
]
t NRR ROUTING:
MIRAGLIA i 0:JE TO NRR Dir.1.a. v,-a7 '
THADANI
!!fPERfdAN MARTIN l 8 / _).A.,C, )
SHERON B0HRER Y[] (
l
[
]#
UNITED STATES F
NUCLEAR REGULATORY COMMISSION n
I ADVISORY COMMITTEE ON REACTOR SAFEGUARDS QL WASHINGTON, D. C. 20555
%,**,* /g November 20, 1996 l
Mr. James M. Taylor Executive Director for Operations U.S. Nuclear Regulatory Commission i
Washington, D.C.
20555-0001
Dear Mr. Taylor:
SUBJECT:
PROPOSED RULE ON STEAM GENERATOR INTEGRITY During the 436th meeting of the Advisory Committee on Reactor Safeguards, November 7-9, 1996, we reviewed the technical bases for the proposed steam generator integrity rule and an associated regulatory guide.
During the 432nd meeting of the ACRS, June 12-14, 1996, and meetings of the Joint Subcommittees on Materials &
Metallurgy and on Severe Accidents, June 3-4 and November 5-6, 1996, we heard presentations on subjects related to this matter.
During these reviews, we had the benefit of discussions with representatives of the staff, the Nuclear Energy Institute, and the Electric Power Research Institute, as well as the author of a differing professional opinion.
We also had the benefit of the documents referenced.
The proposed steam generator integrity rule is ir.nded to provide a risk-informed and performance-based regulat!. n to replace an existing prescriptive regulation.
In its prese..
form, the rule is a performance-based regulation almost completel) divorced from any direct relation to risk objectives.
Such a performance-based rule proliferates the incoherence problems of the present deterministic approach. The proposed rule preserves a tenuous connection between
" design-basis space" and " risk space" without clearly articulating the risk objectives.
Some of the characteristics exhibited in the development process of the rule and regulatory guide include the following:
difficulty in reaching agreement on the performance criteria, o
e incomplete and sometimes perfunctory analyses required to provide an assessment of relative risk, reliance on core-damage frequency alone e
as an indicator of risk, and EDO -- G960886 A'a i 2 ^M CL-.YA
~ -.~.-.-
i Jcmas M. Taylor '
1 l-e recourse to defense-in-depth without specific criteria for its i
use.
4 We believe that more direct consideration of risk could have 4
avoided some of these difficulties.
A controversial element of the proposed rule and regulatory guide j
is the introduction of severe accident issues into an area that has been exclusively resolved by using a design-basis analysis.
This extension of the scope of accident analysis is necessary to make risk-$nformed regulatory decisions and is part of the cost of moving toward risk-informed regulation.
Since licensees have done risk-informed analyses for the Individual Plant Examination (IPE)
- process, we believe that the analysis for addressing severe accident events should not be overly burdensome to them.
Steam generator tube ruptures are small contributors to the total core-damage frequency, but may be risk significant due to containment bypass effects.
In previous analyses, the staff performed limited assessments of primary side fission product attenuation and neglected secondary side attenuation.
The regulatory guide now proposes that the licensees deal with the risk i
of a thermally induced tube failure either by demonstrating that the frequency of the initiating events is sufficiently low (10 '/ reactor year) or by demonstrating that the conditional probability of tube failure, given that an initiating event has occurred, is low (on the order of 0.1)..We believe that licensees should also be given the option to demonstrate that, even if thermally induced tube ruptures occur, the associated risk is low when a more realistic treatment of fission product attenuation is made.
We are concerned that the proposed regulatory guide, as presented, could send the wrong message to licensees that risk-informed and performance-based requirements are add-ons to the traditional design-basis accident approach and can only result in an additional burden. We believe that to be risk informed and performance based, i
the regulatory guide should begin with a clear statement of its objectives, followed by a statement of the performance criteria and the guidelines for meeting the criteria.
We note that the staff has. stated that the proposed performance enteria have been derived from risk analyses, but we have not seen these analyses.
Rewriting the regulatory guide is not a trivial task, but could result in a regulatory framework that could be used as a model for future risk-informed and performance-based rulemaking efforts.
In other applications of performance-based regulation such as the Maintenance Rule, the licensees have been permitted to determine appropriate performance criteria and have been given more flexibility in developing the methodology used to determine whether the criteria have been met.
For the steam generator rule, the 4
j Jcmas M. Taylor :
J staff has concluded that it should approve the performance criteria i
i that are proposed by licensees to implement the steam generator rule.
We agree with the decision of the staff that it should approve the criteria.
Industry, however, should be provided more j
flexibility to propose alternative performance criteria supported j
by an appropriate risk analysis.
We would like to review all of the supporting documentation before commenting on the specific criteria that have been proposed in the regulatory guide.
The demonstration that the criteria have actually been satisfied l
requires a complex process
,f nondestructive examination and evaluation of structural integrity and leakage during operation and design-basis accidents.
The methodology required for these i
evaluations is not well established.
Thus, the staff has felt l
constrained to provide a great deal of detail in the proposed regulatory guide to describe the characteristics of an acceptable j
methodology.
Although we are not yet prepared to endorse the j
regulatory guide, we believe that the present immaturity of the t
j methodology and-the importance of the results justify such an i
approach.
The staff position is that the regulatory guide provides sufficient
~
guidance for developing an acceptable methodology and that formal review of industry-developed repair criteria and procedures will not be required.
We would like to review the results of a "t.rade study" of the preapproval approach vs. the post-implementation inspection approach to methodology acceptance.
Industry has questioned whether safety factors proposed in the steam generator rule are more conservative than those required by the ASME code.
We encourage the staff to consider the. industry a arguments.
Industry accepts the performance criterion proposed by the staff for primary-to-secondary leakage.
Industry stated that this leakage criterion ought not be ipso facto a trigger for inspection i
or enforcement of regulations concerning the steam generator rule.
l This is a valid concern.
Excessive leakage does not necessarily indicate a failure of the steam generator program.
Adequate opportunities for staff action are available if failures of the program are discovered following a plant shutdown due to excessive primary-to-secondary leakage.
1 We are looking forward to reviewing the staff NUREG report I
concerning the staff's treatment of thermally induced tube failure.
We are especially interested in the treatment of elevated temperatures resulting from flow through leaking tubes, and coupling between aerosol deposition and thermal hydraulics.
A differing professional opinion (DPO) was filed on July 11, 1994.
We have reviewed the contentions in that DPO and summarized them in
)
Jcmas M. Taylor
-4 the attachment.
We also note that Generic Safety Issue (GSI)-163,
" Multiple Steam Generator Tube Leakage," identified in 1992 has yet to be prioritized and resolved.
Both the DPO and the GSI are directly related to the proposed rulemaking.
We urge the staff to prepare a point-by-point response to the issues in the DPO and to prioritize J
and resolve GSI-163 before implementing the steam generator integrity rule.
Dr. William J.
Shack did not participate in the Committee's deliberations regarding this matter.
Sincerely, z 5. &
T.
S. Kress Chairman
Attachment:
Summary of Differing Professional Opinion Issues - Presented to the ACRS on November 7, 1996 l
\\
References:
1.
Memorandum dated October 25, 1996, from Brian Sheron, Office I
of Nuclear Reactor Regulation, to John Larkins, Executive Director, ACRS,
Subject:
ACRS Review of the Proposed Steam Generator Rule [ forwarding the proposed steam generator rule j
and draft steam generator regulatory guide) 2.
Memorandum dated May 1, 1996, from James M. Taylor, Executive Director for Operations, NRC, to Joram Hopenfeld, Office of Nuclear Regulatory Research, NRC,
Subject:
Resolution of Differing Professional Opinion Regarding Voltage-Based Repair Criteria for Steam Generator Tubes, dated July 13, 1994 3.
Memorandum dated July 15,
- 1994, from James M.
- Taylor, Executive Director for Operations, NRC, to John T.
- Larkins, Executive Director, ACRS,
Subject:
ACRS Review Of Proposed Generic Letter 94-XX, Voltage-Based Repair Criteria for Westinghouse steam Generator Tubes
[ forwarding Differing Professional Opinion]
4.
Report dated September 12, 1994, from T. S. Kress, Chairman, ACRS, to Ivan Selin, Chairman, NRC,
Subject:
Proposed Generic Letter 94 -XX, " Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes" 5.
Memorandum dated September 30, 1994, from Joram Hopenfeld, Office of Nuclear Regulatory Research,
- NRC, to John T.
Larkins, E :ecutive Director, ACRS,
Subject:
Comments On ACRS Review Of Generic Letter " Voltage Based Repair Criteria for Westinghouse Steam Generator Tubes" l
..... ~ - -
%r
SUMMARY
OF DIFFERING PROFESSIONAL OPINION ISSUES PRESENlrD TO THE ACRS ON NOVEMBER 7, 1996 The DPO author estimates core-damage frequency with containment bypass to be 10-*
3.4 x 10-' events / year.
He stated that the uncertainties associated with characterizing steam generator tube defects and severe accident phenomena are not sufficiently understood to properly model tube rupture events.
Tubes may fail before the surge line due to:
e crack networking and characterization of flaws not being adequately determined by nondestructive examinations, increased heat transfer caused by flow through tube cracks, e
cracks in tubes opening due to increased pressure, e
cracks in tubes unplugging at elevated pressure, and e
jets from tube cracks eroding adjacent tubes.
a The DPO author stated that the staff should document the i
assumptions and models used to study hidden uncertainties.
l t
l
>