ML20138H330

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Insp Rept 50-341/85-44 on 850930-1004. No Noncompliance Noted
ML20138H330
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/24/1985
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jens W
DETROIT EDISON CO.
Shared Package
ML20138H333 List:
References
NUDOCS 8510290014
Download: ML20138H330 (2)


See also: IR 05000341/1985044

Text

{.

.

SAF GUARD 3 IFORM/C ON

OCT 2 41985

Docket No. 50-341

The Detroit Edison Company

ATTN: Wayne H. Jens

Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the routine safeguards inspection conducted by

Messrs. T .J. Madeda and G. L. Pirtle of this office on September 30

through October 4,1985, of activities at the Enrico Fermi Atomic Power

Plant, Unit 2, authorized by NRC Operating License No. NPF-33 and to the

discussion of our findings with you and other members of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

Commitments made to resolve concerns noted during the inspection regarding the

security management program are described in Paragraph 5.a of the Report

Details.

Please advise us if our understanding of your actions are incorrect.

Areas examined during this inspection concern a subject matter which is exempt

from disclosure according to Section 73.21(c)(2) of the NRC's " Rules of Prac-

tice," Part 73, Title 10, Code of Federal Regulations.

This information must

be handled and protected in accordance with the provisions of 10 CFR 73.21.

Consequently, our report of this inspection will not be placed in the Public

Document Room.

h

O

A

lll

8510290014 851024

PDR

ADOCK 05000341

0

PDR

3"Iclosure contaTas ..' '

SAFEGUARDS INFORMATTS

Opon reparation this

O n rrm : Arno

P Eo is Decontrolled

vela Louns wv ,g y gg,g

g

,,

v,,,,,,,,

,,

..

7

O

Chi i atrrmug R

UhlVih i i@T

ar~^"""

n a rrnii a nnn

A

The Detroit Edison Company

2

OCT 2 41985

l

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.

[DivisionofRadiationSafety

A. Hind, Director

and Safeguards

Enclosure:

Inspection Report

No. 50-341/85044(DRSS)

(UNCLASSIFIED SAFEGUARDS INFORMATION)

cc w/ enclosure:

L. P. Bregni, Licensing

Engineer

P. A. Marquardt, Corporate

Legal Department

Resident Inspector, RIII

IE File

IE/DI/0RPB

IE/ES

NMSS/SGPL

NRR/DL/SSPB

ACRS

cc w/ enclosure, w/o

.

SAFEGUARDS INFORMATION:

DCS/RSB (RIDS)

Licensing Fee Management Branch

Ronald Callen, Michigan

Public Service Commission

Harry H. Voigt, Esq.

Nuclear Facilities and

Environmental Monitoring

Section

Monroe County Office of

Civil Preparedness

RIII

RIII

RIII

RIII

P{ll

RIII

[10g/85

a c

/rr

P

e

Ax

-

r

ht

d

bb

g/av/r/

taclosure contains

$1JEGUARDS INFolemTION

Q on reparation this

OTW ~ b R 1i JD m-) y g-~' 0)1"" ' ' '" "'" "

a ,

sn

p n r- - ~

11

v m n"

'

'

_