ML20138H330
| ML20138H330 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/24/1985 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jens W DETROIT EDISON CO. |
| Shared Package | |
| ML20138H333 | List: |
| References | |
| NUDOCS 8510290014 | |
| Download: ML20138H330 (2) | |
See also: IR 05000341/1985044
Text
{.
.
SAF GUARD 3 IFORM/C ON
OCT 2 41985
Docket No. 50-341
The Detroit Edison Company
ATTN: Wayne H. Jens
Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
This refers to the routine safeguards inspection conducted by
Messrs. T .J. Madeda and G. L. Pirtle of this office on September 30
through October 4,1985, of activities at the Enrico Fermi Atomic Power
Plant, Unit 2, authorized by NRC Operating License No. NPF-33 and to the
discussion of our findings with you and other members of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
Commitments made to resolve concerns noted during the inspection regarding the
security management program are described in Paragraph 5.a of the Report
Details.
Please advise us if our understanding of your actions are incorrect.
Areas examined during this inspection concern a subject matter which is exempt
from disclosure according to Section 73.21(c)(2) of the NRC's " Rules of Prac-
tice," Part 73, Title 10, Code of Federal Regulations.
This information must
be handled and protected in accordance with the provisions of 10 CFR 73.21.
Consequently, our report of this inspection will not be placed in the Public
Document Room.
h
O
A
lll
8510290014 851024
ADOCK 05000341
0
3"Iclosure contaTas ..' '
SAFEGUARDS INFORMATTS
Opon reparation this
O n rrm : Arno
P Eo is Decontrolled
vela Louns wv ,g y gg,g
g
,,
v,,,,,,,,
,,
..
7
O
Chi i atrrmug R
UhlVih i i@T
ar~^"""
n a rrnii a nnn
A
The Detroit Edison Company
2
OCT 2 41985
l
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
[DivisionofRadiationSafety
A. Hind, Director
and Safeguards
Enclosure:
Inspection Report
No. 50-341/85044(DRSS)
(UNCLASSIFIED SAFEGUARDS INFORMATION)
cc w/ enclosure:
L. P. Bregni, Licensing
Engineer
P. A. Marquardt, Corporate
Legal Department
Resident Inspector, RIII
IE File
IE/DI/0RPB
IE/ES
NMSS/SGPL
NRR/DL/SSPB
cc w/ enclosure, w/o
.
SAFEGUARDS INFORMATION:
DCS/RSB (RIDS)
Licensing Fee Management Branch
Ronald Callen, Michigan
Public Service Commission
Harry H. Voigt, Esq.
Nuclear Facilities and
Environmental Monitoring
Section
Monroe County Office of
Civil Preparedness
RIII
RIII
RIII
RIII
P{ll
RIII
[10g/85
a c
/rr
P
e
Ax
-
r
ht
d
bb
g/av/r/
taclosure contains
$1JEGUARDS INFolemTION
Q on reparation this
OTW ~ b R 1i JD m-) y g-~' 0)1"" ' ' '" "'" "
a ,
sn
p n r- - ~
11
v m n"
'
'
_