MONTHYEARML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20217D8361999-10-11011 October 1999 Provides NRC with Summary of Activities at TMI-2 During 3rd Quarter of 1999 ML20217F8271999-10-0707 October 1999 Forwards Pmpr 99-13, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990828- 0924.Diskette Containing Pmpr in Wordperfect 8 Is Encl. All Variances Are Expressed with Regard to Current Plans ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20216J6581999-09-28028 September 1999 Provides Info as Requested of Licensees by NRC in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20212E1971999-09-16016 September 1999 Forwards Rev 11 of Gpu Nuclear Operational QAP, Reflecting Organizational Change in Which Functions & Responsibilities of Nuclear Safety & Technical Support Div Were Assigned to Other Divisions ML20212A2101999-09-13013 September 1999 Forwards Rev 3 of Gpu Nuclear Post-Defueling Monitored Storage QAP for Three Mile Island Unit 2, Including Changes Made During 1998.Description of Changes Provided on Page 2 ML20216G4151999-09-0909 September 1999 Forwards Pmpr 99-12, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting Period 990731- 0827.All Variances Expressed with Regard to Current Operations Plans ML20211M5861999-09-0202 September 1999 Forwards non-proprietary & Proprietary Response to NRC 990708 RAI Re TS Change Request 272,reactor Coolant Sys Coolant Activity.Proprietary Encl Withheld ML20211M6591999-09-0101 September 1999 Forwards Errata Page to 990729 Suppl to TS Change Request 274,to Reflect Proposed Changes Requested by . Page Transmitted by Submitted in Error ML20211L2401999-09-0101 September 1999 Submits Response to NRC AL 99-02, Operator Reactor Licensing Action Estimates ML20211H3731999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI LAR 285 & TMI-2 LAR 77 Re Changes Reflecting Storage of TMI-1 Radioactive Matls in TMI-2 Facility.Revised License Page mark-up,incorporating Response,Encl ML20211H4001999-08-27027 August 1999 Responds to NRC 990810 RAI Re TMI-1 LAR 285 & TMI-2 LAR 77 Re Changes to Clarify Authority to Possess Radioactive Matls Without Unit Distinction.Revised License Page mark-up, Incorporating Response Encl ML20211K2391999-08-23023 August 1999 Forwards fitness-for-duty Performance Data Repts for TMI, Oyster Creek & Corporate Headquarters Located in Parsippany, Nj ML20211H5041999-08-20020 August 1999 Forwards Proprietary & non-proprietary Rept MPR-1820,rev 1, TMI Nuclear Generating Station OTSG Kinetic Expansion Insp Criteria Analysis. Affidavit Encl.Proprietary Rept Wihheld 05000289/LER-1999-007, Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface1999-08-20020 August 1999 Forwards LER 99-007-01 Re Increasing Failure Rate of ESAS Relays.Rept Supplements Preliminary Info Re Determination of Root Cause & Long Term Corrective Actions.Changes Made for Supplement Are Indicated in Bold Typeface ML20211A4261999-08-19019 August 1999 Forwards Insp Rept 50-289/99-04 on 990606-0717.Two Severity Level 4 Violations Occurred & Being Treated as Noncited Violations ML20211H3571999-08-19019 August 1999 Forwards Itemized Response to NRC 990712 RAI Re TS Change Request 248 Re Remote Shutdown Sys,Submitted on 981019 ML20211A3931999-08-12012 August 1999 Requests NRC Concurrence with Ongoing Analytical Approach as Described in Attachment,Which Is Being Utilized by Gpu Nuclear to Support Detailed License Amend Request to Revise Design Basis for TMI-1 Pressurizer Supports ML20210R4691999-08-11011 August 1999 Forwards Update 3 to Post-Defueling Monitored Storage SAR, for TMI-2.Update 3 Revises SAR to Reflect Current Plant Configuration & Includes Minor Editorial Changes & Corrections.Revised Pages on List of Effective Pages ML20210N7601999-08-10010 August 1999 Informs That NRC Staff Reviewed Applications Dtd 990629, Which Requested Review & Approval to Allow Authority to Possess Radioactive Matl Without Unit Distinction Between Units 1 & 2.Forwards RAI Re License Amend Request 285 ML20210N7191999-08-0606 August 1999 Forwards Notice of Partial Denial of Amend to FOL & Opportunity for Hearing Re Proposed Change to TS 3.1.12.3 to Add LCO That Would Allow Continued HPI Operation ML20210L3831999-07-30030 July 1999 Responds to NRC 990617 RAI Re OTSG Kinetic Expansion Region Insp Acceptance Criteria That Was Used for Dispositioning Indications During Cycle 12 Refueling (12R) Outage ML20210K7371999-07-30030 July 1999 Forwards Rev 2 to 86-5002073-02, Summary Rept for Bwog 20% Tp LOCA, Which Corrects Evaluation Model for Mk-B9 non- Mixing Vane Grid Previously Reported in Util to Nrc,Per 10CFR50.46 ML20210L1151999-07-28028 July 1999 Confirms Two Senior Management Changes Made within Amergen Energy Co,Per Proposed License Transfer & Conforming Administrative License Amends for TMI-1 05000289/LER-1999-009, Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section1999-07-22022 July 1999 Forwards LER 99-009-00 Re 990626 Event Involving Partial Loss of Offsite Power & Subsequent Automatic Start of EDG 1A.Commitments Made by Util Are Contained in long-term Corrective Actions Section ML20216D4001999-07-22022 July 1999 Provides Summary of Activities at TMI-2 During 2nd Quarter of 1999 ML20210B8231999-07-21021 July 1999 Forwards Exemption from Certain Requirements of 10CFR50.54(w) for Three Mile Island Nuclear Station,Unit 2 in Response to Licensee Application Dtd 990309,requesting Reduction in Amount of Insurance for Unit to Amount Listed ML20210G9471999-07-15015 July 1999 Forwards Pmpr 99-10, CNWRA Program Manager Periodic Rept on Activities of CNWRA, for Fiscal Reporting period,990605- 0702.Diskette Containing Pmpr in Wordperfect 8 Format Is Also Encl ML20209H9401999-07-15015 July 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Application for Exemption Dtd 990309. Proposed Exemption Would Reduce Amount of Insurance for Onsite Property Damage Coverage as Listed ML20209G2451999-07-15015 July 1999 Advises That Suppl Info in Support of Proposed License Transfer & Conforming Adminstrative License Amends,Submitted in & Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20212K1701999-07-13013 July 1999 Submits Concerns Re Millstone & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Should Provide Adequate Emergency Planning in Case of Radiological Accident ML20216D9861999-07-12012 July 1999 Forwards RAI Re 981019 Application Request for Review & Approval of Operability & SRs for Remote Shutdown Sys. Response Requested within 30 Days of Receipt of Ltr ML20209G5861999-07-0909 July 1999 Forwards Insp Rept 50-289/99-05 on 990510-28.No Violations Noted ML20209F2571999-07-0909 July 1999 Forwards Staff Evaluation Rept of Individual Plant Exam of External Events Submittal on Three Mile Nuclear Station, Unit 1 ML20209D8451999-07-0808 July 1999 Forwards Insp Rept 50-289/99-06 on 990608-11.No Violations Noted.Overall Performance of ERO Very Good & Demonstrated, with Reasonable Assurance,That Onsite Emergency Plans Adequate & That Util Capable of Implementing Plan ML20209D6291999-07-0808 July 1999 Forwards Notice of Withdrawal & Corrected TS Pages 3-21 & 4-9 for Amend 211 & 4-5a,4-38 & 6-3 for Amend 212,which Was Issued in Error.Amends Failed to Reflect Previously Changes Granted by Amends 203 & 204 ML20209D5141999-07-0808 July 1999 Forwards RAI Re 981019 Application & Suppl ,which Requested Review & Approval of Revised Rc Allowable Dose Equivalent I-131 Activity Limit with Max Dose Equivalent Limit of 1.0 Uci/Gram.Response Requested within 30 Days 05000289/LER-1999-008, Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public1999-07-0202 July 1999 Forwards LER 99-008-00 Re Discovery of Degraded But Operable Condition of RB Emergency Cooling Sys.Condition Did Not Adversely Affect Health & Safety of Public ML20196J3981999-07-0101 July 1999 Responds to GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Y2K Readiness Disclosure for TMI-1 Encl ML20209C1131999-07-0101 July 1999 Forwards Signed Agreement as Proposed in NRC Requesting Gpu Nuclear Consent in Incorporate TMI-1 Thermo Lag Fire Barrier Final Corrective Action Completion Schedule Commitment of 000630 Into Co Modifying License 1999-09-09
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20217M0721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Pass Dates ML20212J9991999-10-0101 October 1999 Responds to Recent Ltr to President Clinton,H Clinton, Chairman Jackson &/Or Wd Travers Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performance of Plant to Ensure That Public Health & Safety Adequately Protected ML20212L0061999-10-0101 October 1999 Discusses GL 97-06 Issued by NRC on 971231 & Gpu Response for Three Mile Island .Staff Reviewed Response & Found No New Concerns with Condition of SG Internals or with Insp Practices Used to Detect Degradation of SG Internals ML20212L1831999-10-0101 October 1999 Responds to Recent Ltr to Wd Travers Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Performance of Millstone to Ensure Adequate Protection to Public Health ML20212L2081999-10-0101 October 1999 Responds to Recent Ltrs to President Wj Clinton,Chairman Jackson & Commissioners & Wd Travers,Expressing Concerns Re Millstone NPPs & Continued Lack of Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance ML20212K1241999-10-0101 October 1999 Responds to Recent Ltrs to Chairman Jackson,Commissioners & Wd Travers,Expressing Concern Re Millstone Npps.Nrc Continues to Monitor Performace of Millstone to Ensure That Public Health & Safety,Adequately Protected ML20212L2171999-10-0101 October 1999 Responds to Recent Ltr to President Wj Clinton,Chairman Jackson & Commissioners,Wd Travers & Ferc,Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island ML20212L1971999-10-0101 October 1999 Responds to Recent Ltr to Chairman Jackson & Commissioners Expressing Concerns Re Millstone NPPs & Continued Lack of Emergency Mgt Plan for Eastern Long Island.Nrc Continues to Monitor Plant Performance to Ensure Public Health & Safety ML20212K8771999-09-30030 September 1999 Informs of Completion of mid-cycle PPR of Three Mile Island on 990913.No Areas Identified in Which Licensee Performance Warranted Addl Insp Beyond Core Insp Program.Provides Historical Listing of Plant Issues & Insp Schedule ML20212K8551999-09-30030 September 1999 Informs That During 990921 Telcon Between P Bissett & F Kacinko,Arrangements Were Made for Administration of Licensing Exams at Facility During Wk of 000214.Outlines Should Be Provided to NRC by 991122 ML20212J0011999-09-27027 September 1999 Forwards Insp Rept 50-289/99-07 on 990828.No Violations Noted ML20211A4261999-08-19019 August 1999 Forwards Insp Rept 50-289/99-04 on 990606-0717.Two Severity Level 4 Violations Occurred & Being Treated as Noncited Violations ML20210N7601999-08-10010 August 1999 Informs That NRC Staff Reviewed Applications Dtd 990629, Which Requested Review & Approval to Allow Authority to Possess Radioactive Matl Without Unit Distinction Between Units 1 & 2.Forwards RAI Re License Amend Request 285 ML20210N7191999-08-0606 August 1999 Forwards Notice of Partial Denial of Amend to FOL & Opportunity for Hearing Re Proposed Change to TS 3.1.12.3 to Add LCO That Would Allow Continued HPI Operation ML20210B8231999-07-21021 July 1999 Forwards Exemption from Certain Requirements of 10CFR50.54(w) for Three Mile Island Nuclear Station,Unit 2 in Response to Licensee Application Dtd 990309,requesting Reduction in Amount of Insurance for Unit to Amount Listed ML20209H9401999-07-15015 July 1999 Forwards Copy of Environ Assessment & Findings of No Significant Impact Re Application for Exemption Dtd 990309. Proposed Exemption Would Reduce Amount of Insurance for Onsite Property Damage Coverage as Listed ML20209G2451999-07-15015 July 1999 Advises That Suppl Info in Support of Proposed License Transfer & Conforming Adminstrative License Amends,Submitted in & Affidavit,Marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) ML20216D9861999-07-12012 July 1999 Forwards RAI Re 981019 Application Request for Review & Approval of Operability & SRs for Remote Shutdown Sys. Response Requested within 30 Days of Receipt of Ltr ML20209F2571999-07-0909 July 1999 Forwards Staff Evaluation Rept of Individual Plant Exam of External Events Submittal on Three Mile Nuclear Station, Unit 1 ML20209G5861999-07-0909 July 1999 Forwards Insp Rept 50-289/99-05 on 990510-28.No Violations Noted ML20209D8451999-07-0808 July 1999 Forwards Insp Rept 50-289/99-06 on 990608-11.No Violations Noted.Overall Performance of ERO Very Good & Demonstrated, with Reasonable Assurance,That Onsite Emergency Plans Adequate & That Util Capable of Implementing Plan ML20209D6291999-07-0808 July 1999 Forwards Notice of Withdrawal & Corrected TS Pages 3-21 & 4-9 for Amend 211 & 4-5a,4-38 & 6-3 for Amend 212,which Was Issued in Error.Amends Failed to Reflect Previously Changes Granted by Amends 203 & 204 ML20209D5141999-07-0808 July 1999 Forwards RAI Re 981019 Application & Suppl ,which Requested Review & Approval of Revised Rc Allowable Dose Equivalent I-131 Activity Limit with Max Dose Equivalent Limit of 1.0 Uci/Gram.Response Requested within 30 Days ML20196J5631999-07-0101 July 1999 Informs That Util 981203 Joint Application with Amergen Energy Co Marked Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20196J5741999-06-30030 June 1999 Informs That as Result of Staff Review of Util Response to GL 92-01,rev 1,suppl 1,info Provided in Support of PT Limits License Amend & B&W Topical Rept,Staff Revised Info for Plant,Unit 1,in Reactor Vessel Integrity Database ML20196H6811999-06-29029 June 1999 Forwards Insp Rept 50-289/99-03 on 990425-0605.No Violations Noted.However,Adequacy of Assessment of Reactor Bldg Emergency Cooler Operability Prior to Conducting Maintenance on One Reactor Bldg Spray Sys,Questionable ML20212H8711999-06-21021 June 1999 Discusses Updated Schedule Commitment Submitted by Gpu on 990602 for Implementing Thermo-Lag 330-1 Fire Barrier C/As & Completion of Thermo-Lag Effort at TMI-1.Informs NRC Will Incorporate Commitment Into Co Modifying License ML20195K2821999-06-17017 June 1999 Forwards Request for Addl Info Re Kinetic Expansion Region Inspection Acceptance Criteria ML20212H6621999-06-0404 June 1999 Informs That NRC Office of Nuclear Reactor Regulation Reorganized Effective 990328.As Part of Reorganization,Div of Licensing Project Mgt Created.Ss Bajwa Will Be Section Chief for Three Mile Island Nuclear Station ML20207E7201999-05-27027 May 1999 Discusses Reorganization of Nrr,Effective 990328. Organization Chart Encl ML20207B6541999-05-27027 May 1999 Forwards SER Accepting Util Program to Periodically Verify design-basis Capability of safety-related MOV at TMI-1 & That Util Adequately Addressed Actions Requested in GL 96-05 ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206S3411999-05-14014 May 1999 Forwards Insp Rept 50-289/99-02 on 990314-0424.Violations Occurred & Being Treated as non-cited Violations.Security Program Was Inspected During Period & Found to Be Effective ML20206N5831999-05-13013 May 1999 Requests Description of Proposed Corrective Actions for Fire Zones AB-FZ-3,AB-FZ-5,AB-FZ-7,FH-FZ-2,CB-FA-1 & FH-FZ-6. Confirmation That Corrective Actions & Commitments Made Will Be Completed by 991231,requested IR 05000298/19980091999-05-12012 May 1999 Refers to Insp Rept 50-298/98-09 Conducted Between 981227-990130.During Insp,Apparent Violation of 10CFR50.50 Identified & Being Treated as non-cited ML20206H3571999-05-0606 May 1999 Forwards RAI Re 981203 Application & Suppls & 0416,requesting Review & Approval of Revised Core Protection SL & Bases for TMI-1 to Reflect Average of 20% of Tubes Plugged Per Sg.Response Requested within 10 Days of Receipt ML20207A5401999-04-29029 April 1999 Informs That Licensee 980930 Response to GL 96-06,appears to Be Reasonable & Appropriate for Specific Design & Configuration of RB Emergency Cooling at Plant,Unit 1 & That Staff Satisfied with Licensee Resolution of Waterhammer ML20206D4001999-04-20020 April 1999 Informs of Completion of Review of Gpu Request for Exemption Submitted on 961231,970908,971230,980521,981014,981125 & 981223 from Requirements of 10CFR50,App R,Section III.G.2 for TMI Unit 1.Forwards Exemption & Safety Evaluation ML20205S6791999-04-16016 April 1999 Forwards Insp Rept 50-289/99-01 on 990131-0313.No Violations Noted.Identification by Licensee Staff of Elevated Tritium Activity in Monitoring Well Led to Investigation & Identification of Leak from Buried Radwaste Path ML20205P3391999-04-0909 April 1999 Discusses Results of Plant Performance Review for Three Mile Island Completed on 990225.Historical Listing of Plant Issues That Were Considered During PPR Encl IR 05000289/19980061999-03-26026 March 1999 Ack Receipt of 981112 & s Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-289/98-06 .Action Does Not Change NRC Determination That Change to Hpis Valve Configuration Involved URI ML20204E3911999-03-17017 March 1999 Informs That Region I Plans to Conduct Open Predecisional Enforcement Conference to Discuss Apparent Violations Re Efs Issues as Described in Insp Rept 50-289/98-09,per ML20204B6771999-03-15015 March 1999 Submits Withdrawal of Amend Request for Operating License DPR-46.Proposed Change Would Have Modified Facility TSs Pertaining to Neutron Monitoring Neutron Detectors ML20207H7391999-03-0505 March 1999 Forwards Insp Rept 50-289/98-09 on 981227-990130.Two Apparent Violations Being Considered for Enforcement Action.First Violation Deals with Failure to Follow Procedures for Control of Emergency Boration Source ML20203F4911999-02-0505 February 1999 Forwards Request for Addl Info Re Licensee 981125 Amend Application Re TS Change Request 277 for OTSG Inservice Insp During 13R for Three Mile Island,Unit 1 ML20202H6771999-02-0303 February 1999 Documents Basis for NRC Staff Generic Approval of Requests to Relocate TS Requirements from Tss.Staff Generic SER Finding Relative to Relocated TS Requirements Encl ML20196K3511999-01-22022 January 1999 Refers to Gpu Responses to Second NRC RAI Re GL 92-08 & Review of Gpu Analytical Approach for Ampacity Derating Determinations.Forwards SE & SNL Technical Ltr Rept Concluding That No Outstanding Safety Concerns Identified ML20199H6471999-01-20020 January 1999 Forwards RAI Re Gpu TS Change Request 277 OTSG Cycle 13 for Plant Unit 1.NRC Has Determined That Addl Info Needed to Complete Review ML20199G7401999-01-12012 January 1999 Forwards Insp Rept 50-289/98-08 on 981101-1226.No Violations Noted.Operator Workaround Program Found to Be Acceptable ML20206S0221999-01-0808 January 1999 Responds to Re Changes to Physical Security Plan Identified as Rev 38,submitted Under Provisions of 10CFR50.54(p).Based on NRC Determination,Changes Do Not Decrease Overall Effectiveness of Security Plan 1999-09-30
[Table view] |
See also: IR 05000289/1996201
Text
,
.
S .. .
.
I
.- i
j April 25,1997 {
4
( .
3-
.
EA Nos.97-070 and 97-117 ,
,
j- Mr. James Langenbach
- Vice President and Director, TMI
GPU Nuclear Corporation
l
4 Three Mile Island Nuclear Station- 3
i P. O. Box 480 '
! Middletown, PA 17057-0191
SUBJECT: APPARENT VIOLATIONS RESULTING FROM RECENT INSPECTIONS AT
THREE MILE ISLAND - UM T 1
~
References: 1) NRC letter, dated April 15,1997; SUBJECT: Three Mile Island-Unit 1,
Design inspection (NRC Inspection Report No. 50-289/96-201)
2) NRC letter, dated March 20,1997; SUBJECT: NRC Integrated
Inspection Report Nos. 50-289/97-01 and 50-320/97-01
Dear Mr. Langenbach:
i
1
Based on review of findings (unresolved items) contained in reference 1, we have identified- I
seven apparent violations associated with Technical Specifications 3.3.1 and 3.6.6,
10 CFR 50.59,10 CFR 50.71(e), and 10 CFR Part 50, Appendix B (Criteria Ill, V_ and XVI),
as described in enclosure 1. Enclosure 1 identifies the area (s) of concern and the
reference 1 report section (and item number) that are related to specific regulatory
requirements.
!
Reference 2 contained four apparent violations associated with Technical Specifications j
6.5.1.2,10 CFR 50.59 and 10 CFR Part 50,' Appendix B, (Criteria V and XV!), as described
in enclosure 2. Enclosure 2 identifies the area (s) of concern and the reference 2 report
sections that are related to specific regulatory requirements.
The apparent violations are being considered for escalated enforcement action in !
accordance with the " General Statement of Policy and Procedure for NRC Enforcement
Actions" (Enforcement Policy), NUREG-1600. No Notice of Violation is presently being
issued for these inspection findings. In addition, please be advised that the number and
characterization of apparent violations described in enclosures 1 and 2 may change as a -i
result of further NRC review.
1
I
f GDI i
"
9705070093 970425 1
-
p ] ,
.
- . . . . -
A ee + e 1m-u-t +eg-m-- w- g,97g,- --
sr v.- -- v . -
-+er- w- P- W'
. -- - .- - --
, - - _ _ - - .- . - - -
.
,
.
Mr. James Langenbach ,
2
!
A predecisional enforcement conference lo discuss these apparent violations has been
.
scheduled for May 22,1997. The decician to hold a predecisional enforcement conference
l
does not mean that the NRC has determined th::hese violations have occurred or that
enforcement action wi1 be taken. This conference is being held to obtain information to
enable the NRC to make an enforcement decision, such as a common understanding of the
facts, root causes, missed opportunities to identify the apparent violations sooner,
corrective actions, significance of the issues and the need for lasting and effective
corrective action.
At the conference, we expect your presenta? ion to address, but not be limited to, the
- following issues associated with the apparent violations:
i
i (1) design control weaknesses in the peformance of calculations and in the
i control of calculations used in the analysis for switchover of the decay heat
- removal system (DHRS) pump suction from the borated water storage tank
'
(BWST) to the reactor building sump under post-accideat conditions;
(2) calculations that were being performed in documents, such as memoranda,
technical data reports, and plant engineering evaluation requests, that do not
comply with your engineering procedures for calculations;
(3) nonconservative assumptions and missing inputs in calculations for the
makeup pumps and makeup tank;
(4) a potential unreviewed safety question when evaluating a Final Safety
Analysis Report (FSAR) change regarding the net positive suction head for
the DHRS pumps; and
(5) untimely and ineffective actions relative to dispositioning of licensee
identified deficiencies associated with the Quality Classifiestion List.
The conference provides an opportunity for you to point out any errors in our inspection
report and for you to provide any information concerning your perspectives on: 1) the
severity of the violations, 2) the application of the factors that the NRC considers when it
determines the amount of a civil penalty that may be assessed in accordance with Section
VI.B.2 of the Enforcement Policy, and 3) any other application of the Enforcement Policy to
this case, including the exercise of discretion in accordance with Section Vll. This
conference will be open to public observation,
- - --_-_- ----__ - __ - - -
.
1
.
Mr. James Langenbach 3
You will be advised by separate correspondence of the results of our deliberations on this
matter. No response regarding these apparent violations is required at this time. In ,
accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and I
its enclosure will be placed in the NRC Public Document Room,
i
Sincerely,
~
!!(-h :
Charles W. Hehl, Director
Division of Reactor Project
Docket No. 50-289
License No. DPR-50
Enclosures:
1. Apparent Violations Relative to NRC Inspection Report
50-289/96-201
2. Apparent Violations Relative to NRC Inspection Report
50-289/97-01 !
1
cc w/ encl:
E. L. Blake, Shaw, Pittman, Potts and Trowbridge (Legal Counsel for GPUN)
J
Commonwealth of Pennsylvania l
J. C. Fornicola, Director, Licensing and Regulatory Affairs l
M. J. Ross, Director, Operations and Maintenance
TMI-Alert (TMIA) !
J. S. Wetmore, Manager, TMI Regulatory Affairs l
l
!
l
l
l
l
l
l
l
L_________
- .- .-.. . -- .- .. . .- . _ _. - . .
.
l
.
Mr. James .Langenbach
l
4 l
1
2
Distribution w/ encl:
Region I Docket Room (with concur.rences) l
!
NRC Resident inspector l
. Nuclear Safety Information Center (NSIC) j
PUBLIC
l
- D. Holody, RI
j J. Lieberman, OE ]
j
j
'
R. Gallo, NRR -
S. Malur, NRR I
! T. Kenny,DRS
'
P. Eselgroth, DRP l
D. Haverkamp, DRP i
C. O'Daniell, DRP I
-
D. Screnci, PAO (1) ;
. W. Dean, OEDO ;
P. Milano, NRR, PDI 3 ,
j B. Buckley, PM, NRR, PDI-3 l
l Inspection Program Branch, NRR (IPAS)
l
R. Correia, NRR i
R. Frahm, Jr., NRR !
i
DRS File (1)
1
,
i
i
'
,
4
1
^
DOCUMENT NAME: A:ENFLTH.TML g j 6, seg% et h
G.4 h Ar#, A. Ceyp oi N'
g
,
Ts receive a copy of this document. ind. rate la the bou *C" = Copy without attaGhmenvcClosure
- E" = Copy with attachmentlenclosure "N* = No copy
i OFFICE Rl/DRS Rl/DRS , ,\) Rl/DRP g ) EL Rl/ORAg NRR [4 (g l
NAME TAENNY d Aq[ GKEpK7f p f P@{d7EBOTg a DHOLOI3V M RGALLO _ grp
DATE 03/19/97 .yVA 03Qd9C/ .
03/20/97 _
V f 03 5{/97 jo3/Lt/{" l
0FFICE RI/ORF l ; RI/ .bn) l / l l
NAME WHehl ,Auj / W %wd tu
DATE 04/23/7/ 04/ t.4 /97 0 04/ /97 04/ /97 04/ /97 !
0FFICIAL RECORD COPY ,
. ._ . _ _ . - . _ . ._ _ _ _. __. - _ _ . . . . _ . _ . . __ .
- -
i
i
4 .
EECLOSURE 1
APPAREET VIOLATIOES RELATIVE TO BBC IRSPECTION REPORT 50-289f96201
a
- Regelsteri Report Sestsee
j Regoirement Ares et Consere stem Esmher)
a
i
4
Technical Adequacy of BWST setpoint for DHRS pump switchover to RB sump E1.3.2.2.a
- Specification 3.3.1 (964G113)
i
Technical Lack of documented instructions for alignment of MU V 18 50 power E1.2.3.2.b
Specification 3.6.6 supply (96-201 10)
!
! 10 CFR 50.59 Design basis valve stroke times in surveillance procedure E 1,2.2.2.d ;
1
!96 201 05)
.
Adequacy of safety evaluation of an FSAR change E1.3.2.2.b
'
(96-201 14)
2
I
l
l 10 CFR 50.71(e) FSAR discrepancies E1.2.7
i (96 201 12)
<
! Discrepancies between FSAR and Technical Specifications regarding E1.3.2.2.d l
. DHRS leakage (96 201 16) I
i
'
FSAR discrepancies E1.3.7 j
!
(96 201 26) l
i
I
!
,
W-
___ . _ _ . _ ._. __
.
.
Enclosure 1 2
-
W atery Report Sectue
. Ruperament Area of Concere Stem besser)
10 CFR 50, App B, Adequacy of makeup tank pressurellevel curves E1.2.2.2.c
Criterion 111 (96-201 04)
Dssign Control
Adequacy of BWST setpoint for DHRS pump switchover to RB sump E1.3.2.2.a
j (96 201 13)
l Leak testing of DHRS pump suction check valves (first example) E1.3.2.2.e
(96 20117A)
. .
"
!
'
Leak testing of DHRS pump discharge check valves (second example) E1.3.2.2.s
i (96 20117B) i
I
!
)
'
Inspection of DHRS pump vault floor drain check valves (third I
'
example) E1.3.2.2.e j
, (96 20117C)
i
Static head correction for BWST level transmitter
E1.3.4.2.a
- (96 201 21)
l
Control of calculations l
E1.4
,
(96 201 28)
10 CFR 50, App. 8, Lack of documented lastructions for alignment of MU V 18 DC power E1.2.3.2.b
Criterion V supply (96-201 10)
Instructions, !
i
Procedures and
Drawings Failed to follow procedure instructions for testing of molded case E 1.3.3.2.a
circuit breakers (96 201 20)
Failed to follow drawing instructions for BWST level transmitter E 1.3.6.2.c
enclosure and heat tracing (96 201 25)
10 CFR 50, Ap. B, Timeliness of action on SSFI open items [1.3.2.2.f
Criterion XVI (96-201 18)
Corrective Actions
>
. . . .. ... - - .. . __. __ -
.
.
4
Enclosure 1 3
_
_
Regulatory Report Secties
- Rogerement Area of Cassere mom Bomber)
Currently Not an Makeup tank level instrument loop tolerances E1.2.4.2.s
Apparent Violation (96 201 12)
i
i
l
T-laction of BWST low level alarm for operator action E 1.3.4.2.c
(96-201 23)
.
f
i
-
]
i
'
l
,
1
. _ _ _ __ _. _ . __ __
n
1
4'
i.
EBCLOSURE 2
APPAREET VIOLATIOBS RELATIVE TO RRC IRSPECIME REPORT 5828Sf9781
,
Regeistory
)
l Regoiremsets Area ef Concern Report fecties i
Technical Failed to include Engineering Procedure E 011, Revision 4, in the E.2.1.2
- Specification 6.5.1.12 safety review process l
,
i
,
10 CFR 50.5g Failed to perform and document safety evaluations regarding quality E.2.1.1
, classification list (QCL) level reductions for components of four
) syste'ns described in the UFSAR
10 CFR 50, App. 8, Failed to follow Engineering Procedure E 011, Revision 4, for E.2.1.2
Criterion V downgrading components l
Instructions, j
Procedures and
Drawings
10 CFR 50, App. h, Previous corrective actions relative to quality clasufication list (QCL) E.2.1.3
Criterion XVI deficiencies had not been effective or timely
Corrective Action
.>