Accepts 831107 Response to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Testing of Reactor Trip Sys Components & Other safety-related Equipment.Safety Evaluation Encl
ML20138H164
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/18/1985
From: Butcher E
Office of Nuclear Reactor Regulation
To: Fay C
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20138H169 List:
References
GL-83-28, TAC-53030, TAC-53031, NUDOCS 8510280297
Download: ML20138H164 (2)


Text

- - - _ _ _ _ _ _.- _ _ . . _ _ . - ._. _ _ . - . - . . - - _ .

.e October 18, 1985 Docket Nos. 50-266 and 50-301 i

Mr. C. W. Fay, Vice President Nuclear Power Department Wisconsin Electric Power Company 231 West Michigan Street, Room 308 Milwaukee, Wisconsin 53201

Dear Mr. Fay:

SUBJECT:

GENERIC LETTER 83-28 ITEMS 3.1.3 AND 3.2.3 (POST MAINTENANCE TESTING) j FOR THE POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 The Commission has completed the review of your November 7,1983 response to Generic Letter 83-28 Items 3.1.3 and 3.2.3 Post-Maintenance Testing of i Reactor Trip System Components and All Other Safety-Related Equipment, for the Point Beach Nuclear Plant, Unit Nos. I and 2. Items 3.1.3 and 3.2.3 are concerned with the review of existing technical specifications for post-maintenance testing requirements that may degrade rather than enhance safety.

Based on the review of your response, we have concluded that at the present time no post-maintenance test requirements were identified in the technical 4

specifications that degrade safety. However, as part of your continuing evaluation, you should factor in such reviews to future technical specification changes to assure that future post-maintenance testing does not degrade the level of safety.

, On this basis, we find your responses to these items are adequate in content i and therefore are acceptable. We consider our review of items 3.1.3 and

! 3.2.3 complete.

Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Division of Licensing cc: See next page Distribution:

, Docket File; BGrimes NRC & L~PDRs EJordan HThompson DLasher OELD FRosa ACRS 10 RWHouston i PKreutzer Branch Files

! TColburn i ORB #3:D ORB #3:DLb ORR[hK 8510280297 851018 PKreutzeb TColburn;ef EBMtt1er p DR ADOCK 05000266 10 /g7 /85 [0 /l7/85 /0 //d/85 PDR i

l

Mr. C. W. Fay Point Beach Nuclear Plant Wisconsin Electric Power Company Units 1 and 2 cc:

Mr. Bruce Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, N.W.

Washington, DC 20036 Mr. James J. Zach, Manager Point Beach Nuclear Plant Wisconsin Electric Power Company 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Chairman Public Service Commission of Wisconsin Hills Farms State Office Building Madison, Wisconsin 53702 Regional Administrator, Region III U.S. Nuclear Regulatory Commission Office of Executive Director for Operations 799 Roosevelt Road Glen Ellyn, Illinois 60137 Resident Inspector's Office U.S. Nuclear Regulatory Connission 6612 Nuclear Road Two Rivers, Wisconsin 54241 1

P G

i l

, . .