ML20138H141
| ML20138H141 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 10/21/1985 |
| From: | Butcher E Office of Nuclear Reactor Regulation |
| To: | Randazza J Maine Yankee |
| References | |
| GL-83-28, NUDOCS 8510280263 | |
| Download: ML20138H141 (2) | |
Text
_-
October 21, 1985 Docket No. 50-309 Mr. J. B. Randazza Executive Vice President Maine Yankee Atomic Power Company 83 Edison Drive Augusta, Maine 04336
Dear Mr. Randazza:
SUBJECT:
SAFETY EVALUATION FOR GENERIC LETTER 83-28, ITEMS 3.1.3 AND 3.2.3
- POST MAINTENANCE TESTING FOR MAINE YANKEE ATOMIC POWER PLANT The Commission has completed the review of your November 4,1983 response to Generic Letter 83-28 Items 3.1.3 and 3.2.3 Post-Maintenance Testing of Reactor Trip System Components and All Other Safety-Related Equipment, for the Maine Yankee Atomic Power Station.
Items 3.1.3 and 3.2.3 are concerned with the review of existing technical specifications for post-maintenance testing requirements that may degrade rather than enhance safety.
Based on the review of your response, we have concluded that at the present time no post-maintenance test requirements were identified in the technical specifications that degrade safety. However, as part of your continuing evaluation, you should factor in such reviews to future technical specification t
changes to assure that future post-maintenance testing does not degrade the level of safety.
On this basis, we find your responses to these items are adequate in content and therefore are acceptable. We consider our review of items 3.1.3 and 3.2.3 complete.
Sincerely, Edward J. Butcher, Acting Chief Operating Reactors Branch No. 3 Division of Licensing cc: See next page Distribution:
Docket: File o NRC & L PDRs ACRS 10 8510280263 851021 HThompson PDR ADOCK 05000309 OELD P
PDR BGrimes EJordan JPartlow PKreutzer PSears D
Branch Files
,5/
ORB #3 DL ORB #3:DL OMf p PK M:
PSears;ef fBut her
\\ 10 /.1I/85 lo/SI/85 f4/6/85 1
L
9 e
Mr. J. B. Randazza Maine Yankee Atomic Power Company Maine Yankee Atomic Power Station cc:
Charles E. Monty, President Mr. P. L. Anderson, Project Manager Maine Yankee Atomic Power Company Yankee Atomic Electric Company 83 Edison Drive 1671 Worchester Road -
Augusta, Maine 04336 Framingham, Massachusetts 07101 Mr. Charles B. Brinkman Mr. G. D. Whittier Manager - Washington Nuclear Licensing Section Head Operations Maine Yankee Atomic Power Company Combustion Engineering, Inc.
83 Edison Drive 7910 Woodmont Avenue Augusta, Maine 04336 Bethesda, Maryland 20814 John A. Ritsher, Esquire Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 State Planning Officer Executive Department 189 State Street Augusta, Maine 04330 Mr. John H. Garrity, Plant Manager Maine Yankee Atomic Power Company P. O. Box 408 Wiscasset, Maine 04578 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 First Selectman of Wiscasset Municipal Building U.S. Route 1 Wiscasset, Maine 04578 Mr. Cornelius F. Holden Resident Inspector c/o U.S. Nuclear Regulatory Commission P. O. Box E Wiscasset, Maine 04578' j
l
_