e i
F RAMATOME COG EM A F U E LS l
April 4,1997 t
Mr. E.J. McAlpine, Chief Fuel Facilities Branch Division of Nuclear Materials Safety United States Nuclear Regulatory Commission 101 Marietta Street, N.W., Suite 2900 i
Atlanta, GA 30323-0199
SUBJECT:
REPLY TO NRC INSPECTION REPORT NO. 70-1201/97-02 AND i
NOTICE OF DEVIATION
Dear Mr. McAlpine:
This letter is in response to inspection Report No. 70-1201/97-02 and Notice of Deviation dated March 11,1997. The deviation is in regard to a commitment made to the Nuclear Regulatory Commission (NRC) by Framatome Cogema Fuels (FCF) on March 4,1996, to proceduralize NRC notification requirements by April 30,1996. This action was completed by issuing AS-1115, Revision 0,
" Regulatory Requirements for License Changes and incident Reporting" on September 18,1996.
l Framatome Cogema Fuels concurs with the facts contained in the Inspection Report and Notice of Deviation.
An investigation was performed by FCF's Safety & Licensing personnel to determhie the root cause for the deviation from the commitment made to the NRC.
The investigation consisted of interviews with persornel and evaluation of various l
administrative procedures in effect during the inspection period.
The root cause for the deviation was determined to be inadequate tracking of the action by the responsible personnel to ensure the procedure was issued by the i
committed date. It has not been FCF's practice to track NRC inspection actions under our present Quality Program requirements. Implementation of the established Program requirements for tracking action items would have prevented this deviation.
9705070044 970404 g
1 i
h Page 1 of 2 I
e
- - ~~
Frematome Cogems Fuels FRAMATOME eo. Bo= i t e48. Lynenburg. v4 2450s-ists TECHHOLOO Es Telephor.a: 804-832 5000 Fes: 804 832 5167 h0 1
~-
l.4-4 i
Page 2 of 2 1
}
The specific action taken to prevent a future recurrence includes implementation l
and training on administrative procedure 1703-71, "FCF Action Reports". This procedure documents and determines the resolution of significant concerns that i
occur within FCF under our Quality Program. The procedure will be implemented in the Safety & l.icensing organization to track to closure those action items o
resulting from NRC inspections. The implementation and training on this l
procedure will result in a method by which action items are monitored through
)
i completion and closure. Full compliance for this action will be achieved by April
!^
11,1997.
I i
l The additional corrective action talen to prevent a future recurrence of falling to meet a NRC commitment includes emphasizing, through training, the importance of j
)
meeting all commitments to the NRC. A description of the deviation, identification of the root cause and ramifications of not meeting the commitment resulting in the i
deviation was characterized and given as training to Safety & Licensir.g
)
i.
management and supervision. This corrective action has resulted in an increased l
awareness on the importance of meeting commitments. Full compliance for this action was achieved on April 1,1997. -
i The management of Framatome Cogema Fuels is concerned when an incident arises where commitments are made by FCF personnel and are not met. We are 4
g working proactively through tracking and management review to ensure all j'
commitments are met or alternate completion dates are egreed upon.
i l
The corrective actions noted herein will ensure future commitments are fulfilled by i
the date committed.
Should you have any questions or comments, please feel free to contact me at (804) 832-5015 or G.F. Elliott at (804) 832-5202.
FRAMATOME COGEMA FUELS Lynchburg Manufacturing Facility Charles W. Carr Vice-President, Manufacturing & Field Service i
e y
et -
w r-
+neg 1--
s-m m
_ma.aem-uma.a=.A i
--- a :
e--w-wa22 cam-w a__,.5aa r
FRAMATOME COGEMA FUELS
.m#
g i
P.O. Box 11646
(
f Lynchburg, VA 24506-1646 mim t
, : 0.32:
Eb 5 j
cs yg,"9332 u.s. post 4as [;
r:
x CC a,
e i
- E, n
Mr. E. J. McAlpine, Chief Fuel Facilities Branch g
Division ofNuclear Materials Safety
]
United States Nuclear Regulatory Commission
- j 101 Marietta Street, N.W., Suite 2900 3
Atlanta, GA 30323-0199
- ]
M e
f F R A M0 L O G 8 E $ATOME p
YiCH>
Inllill.inillnililullillnnulililulilnlinil
_,s
(
- m.
m m..-
7 9