Text
.
I Docket No. 50-354 1
i Mr. R. L. Mitti, General Manager I
Nuclear Assurance and Regulation Public Service Electric & Gas Company i
P.O. Box 570, T22A l
Newark, New Jersey 07101
+
Dear Mr. Mittl:
i
SUBJECT:
HCPE CREEK ENVIRONMENTAL PROTECTION PLAN i
We have reviev,ed the corrents contained in your October 1,1985 letter regarding the Hope Creek Environrental Protection Plan (EPP). He believe these conar.ents are justified and have revised the EPP accordingly.
{
Enclosed for your review is the Proof and Review copy of the EPP. Please review the enclosed EPP and notify us of any ' additional changes you believe are required.
If you hase no ccntents and are in agreement with the EPP as presented, please r
.i notify us to this effect.
Do not hesitate to call us if you have any questions.
Sincerely, l
[
1 I
Original Signed by Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing t
Enclosure:
As stated
[
l
[
.cc: See next page i
5 l
DISTRIBUTION [D6ckie't?Fild' NRC PDR Local PDR PRC System NSIC f
LC#2 Reading EHylton DWagner Dewey, OELD ACRS (16)
JParticw BGrimes Edordan i
b h m
LB#2/DL/PH LB#2/lL/BC 0 Wagner:lb WButler j
10/I[./85 10/g/85 l
i 1
r i
i 851028 PDR 4
851016 A
05000354 i
i PDR i
i
_.__.__._.-.._.__._._,.______J
~
((r
?',
UNITED STATES NUCLEAR REGULATORY COMMISSION j
), I ' l j
WASHINGTON, 0. C. 20555 t
OCT I 6 Gds Docket No. 50-354 Mr. R. L. Mitti, General Manager Nuclear Assurance and Regulation Public Service Electric & Gas Company P.O. Box 570, T22A Newark, New Jersey 07101
Dear Mr. Mitti:
SUBJECT:
HOPE CREEK ENVIRONMENTAL PROTECTION PLAN We have reviewed the comments contained in your October 1,1985 letter regarding the Hope Creek Environmental Protection Plan (EPP). We believe these coments are justified and have revised the EPP accordingly.
Enclosed for your review is the Proof and Review copy of the EPP. Please review the enclosed EPP and notify us of any additional changes you believe are required.
If you have no coments and are in agreement with the EPP as presented, please notify us to this effect.
Do not hesitate to call us if you have any questions.
Sincerely, k
Walter R. Butler, Chief Licensing Branch No. 2 Division of Licensing
Enclosure:
As stated i
cc: See next page 4
e&
-en s
.ss ea a
a
9 Mr. R. L. Mitti Public Service Electric & Gas Co.
Hope Creek Generating Station cc:
Gregory Hinor Susan C. Remis Richard Hubbard Division of Public Interest Adyccacy Dale Bridenbaugh New Jersey State Department of MHB Technical Associates the Public Aovocate 1723 Hamilton Avenue, Suite K Richard J. Hughes Justice Comples San Jose, California 95125 CN-850 Trenton, New Jersey 08625 Troy B. Conner, Jr. Esquire Office of Legal Counsel Conner & Wetterhahn Department of Natural Resources 1747 Pennsylvania Avenue N.W.
and Environmental Control Washington, D.C.
20006 89 Kings Highway P.O. Box 1401 Dover, Delaware 19903 Richard Fryling, Jr., Esquire Mr. K. W. Burrowes, Project Engineer Associate General Solicitor Bechtel Power Corporation Public Service Electric & Gas Company 50 Beale Street P. O. Box 570 T5E P. O. Box 3965 Newark, New Jersey 07101 San Francisco, California 94119 Mr. J. M. Ashley Resident Inspector Senior Licensing Engineer U.S.N.R.C.
c/o Public Service Electric & Gas Co.
P. O. Box 241 Dethesda Office Center, Suit 550 Hancocks Bridge, New Jersey 06036 4520 East-West Highway Bethesda, Maryland 20814 Richard F. Engel Deputy Attorney General Mr. A. E. Giardino Division of Law Manager - Quality Assurance E&C Environmental Protection Section Public Service Electric & Gas Co.
~
Richard J. Hughes Justice Ccmplex P. O. Box A CN-112P Hancocks Bridge, New Jersey 08038 Trenton, New Jersey 08625 Mr. Robert J. Touhey, Mr. Anthony J. Pietrofitta Acting Director General Manager DNREC - Division of Power Production. Engineering Environmental Control Atlantic Electric 89 Kings Highway 1199 Black Horse Pike P. O. Box 1401 Pleasantville, New Jersey 08232 Dover, Delaware 19903 Regional Administrator, Region I Mr. R. S. Salvesen U. S. Nuclear Regulatory Conmission General Manager-Hope Creek Operation 631 Park Avenue Public Service Electric & Gas Co.
King of Prussia, Pennsylvania 19406 P.O. Box A Hancocks Bridge, New Jersey 08038 l
I l
Public Service Electric & Gas Co. Hope Creek Generating Station cc:
Mr. B. A. Preston Public Service Electric & Gas Co.
Hope Creek Site MC12Y Licensing Trailer 12LI Foot of Button wecd Road Hancock's Bridge, New Jersey 08038 1
Ms. Rebecca Green New Jersey Bureau of Raciation Protection 380 Scotch Road Trenton, New Jersey 08628 6
de 9
6 8
-'*we,
- M-
-A u
APPENDIX B 1
TO FACILITY OPERATING LICENSE NO.
HOPE CREEK GENERATING STATION PUBLIC SERVICE ELECTRIC AND GAS COMPANY DOCKET NO. 50-354 ENVIRONMENTAL PROTECTION PLAN (NONRADIOLOGICAL)
HOPE CREEK GENERATING STATION ENVIRONMENTAL PROTECTION PLAN (NONRADIOLOGICAL)
TABLE OF CONTENTS Section P,a!Le 1.0 Objectives of the Environmental Protection Plan............
1-1 2.0 Environmental Protection Issues............................ 2-1 2.1 Aqua tic /Wa te r Qua li ty Is sues............................... 2-1 2.2 Terrestrial Issues......................................... 2-1 a
i" 3.0 Consistency Requirements................................... 3-1 1
3.1 Pla nt Des ign and 0pera tion................................. 3-1 J
3.2 -Reporting Related to the NPDES Permit and State Certifications........................................... 3-2 3.3 Changes Required for Compliance with Other Environmental Regulations.............................................. 3-3 4.0 Environmental Conditions................................... 4-1 4.1 Unusual or Important Environmental Events.................. 4-1 4.2 Environmental Monitoring................................... 4-1 5.0 Administra ti ve Procedu res............................
5.1 Review and Audit........................................... 5-1 5.2 Records Retention.......................................... 5-1 5.3 Changes in Environmen tal Protection Plan................... 5-2 5.4 Pl ant Reporting Requi rements............................... 5-2 p
e
1.0 Objectives of the Environmental Protection Plan The Environmental Protection Plan (EPP) is to provide for protection of nonradiological environmental values during operation of the nuclear facility.
The principal objectives of the EPP are as follows:
I (1) f Verify that the facility is operated in an environmentally acceptable manner, as established by the Final Environmental Statement - Oper Licensing Stage (FES-OL) and other NRC environmental impact ass (2)
Coordinate NRC requirements and maintain consistency with other I
Federal, State and local requirements for environmental 1
protection.
u 4
3 q
(3)
Keep NRC informed of the environmental effects of facility construct and operation and of actions taken to control those effects.
Environmental concerns identified in the FES-OL which relate to matters are regulated by way of the licensee's NPDES pemit.
.g.
1-1
2.0 Environmental Protection Issues In the FES-OL dated December 1984, the staff considered the environmental impacts associated with the operation of the Hope Creek Generating Station. Certain environmental issues were identified which required study or license conditions to resolve environmental concerns and to 8
assure adequate protection of the environment.
2.1 Aquatic / Water Quality Issues Consumptive surface water use by Hope Creek during periods of river flow below 85 m3/s (3,000 ft3/s), as measured at Trenton, New Jersey, is to be compensated for under a ruling of the Delaware River Basin Commission (DRBC). The applicant is participating in the development of a supple-mentary reservoir for this purpose.
(FES Section 4.2.3.2 and 5.3.1.1).
The NRC will defer to the DRBC for any further actions regarding flow i
compensation.
2.2 Terrestrial Issues The primary potential effect of station operation on terrestrial resources derives from cooling tower drift. Significant impacts on terrestrial
~
resources will likely not occur if the cooling tower functions properly and is adequately maintained. To ensure proper cooling tower operation, the need to measure drift rates and deposition on n?
.e vegetation was identified by the staff (FES Section 5.14.1).
1 s
2-1
i 3.0 Consistency Requirements 3.1 Plant Design and Operation The licensee may make changes in station design or operation or perform tests or experiments affecting the environment provided such activities do not involve an unreviewed environmental question and do not involve a change in the EPP*.
Changes in statfor Jee' n or operation or performance of tests or experiments which do not affect the environment are not subject to the requirements of this EPP. Activities governed by Section 3.3 are not subject to the requirements of this Section, Before engaging in additional construction or operational activities which o
may significantly affect the environment, the licensee shall prepare and record an environmental evaluation of such activity. Activities are excluded from this requirement if all measurable nonradiological environ-mental effects are confined to the on-site areas previously disturbed during site preparation and plant construction. When the evaluation indicates that such activity involves an unreviewed environmental question, the licensee shall provide a written evaluation of such activity and obtain prior NRC approval. When such activity involves a change in the EPP, such activity and change to the EPP may be implemented only in acCJrdance With an appropriate license amendment as set forth in Section 5.3 of this EPP.
This provision does not relieve the licensee of the requirements of 10 CFR 50.59.
9 3-1 1
6
i
)
A proposed change, test or experiment shall be deemed to involve an unreviewed environmental question if it concerns:
(1) a matter which may result in a significant increase in any adverse environmental impact previously evaluated in the FES-OL, environmental impact appraisals, or in any decisions of the Atomic Safety and Licensing Board; or (2) a significant change in effluents or power level; or (3) a matter, not previously reviewed and evaluated in the documents specified in (1) of this Subsection, which may have a significant adverse environmental impact.
The licensee shall maintain records of changes in facility design or operation and of tests and experiments carried out pursuant to this Sub-section. These records shall include written evaluations which provide bases for the determinatt.9 that the change, test, or experiment does not involve an unreviewed environmental question or constitute a decrease in the effectiveness of this EPP to meet the objectives specified in Section 1.0.
The licensee shall include as part of the Annual Environmental Operating Report (per Subsection 5.4.1) brief descriptions, analyses, interpretations, and evaluations of such changes, tests and experiments.
3.2 Reporting Related to the NJPDES Permit and State Certification Changes to, or renewals of, the NJPDES Permits or the State certification shall be reported to the NRC within 30 days following the date the change or renewal is approved.
If a permit or certification, in part or in its entirety, is appealed and stayed, the NRC shall be notified within 30 days following the date the stay is granted.
3-2
_ _. _ _ = _ _.
i The licensee shall notify the NRC of changes to the effective NJPDES Permit proposed by the licensee by providing NRC with a copy of the proposed change at the same time it is submitted to the permitting agency. The licensee shall provide the NRC a copy of the application for renewal of the NJPDES Pennit at the same time the application is submitted to the permitting agency.
3.3 Changes Required for Compliance with Other Environmental Regulations Changes in plant design or operation and performance of tests or experiments which are required to achieve compliance with other Federal, State, and local l
environmental regulations are not subject to the requirements of Section 3.1.
l 4
I r
I 4
l 1
{
4 e
1 3-3 I
a m~ - - - ^ - - ~ > ' ' '
+~ ~ ' ' ** " ' " '** * * * ' " ' ' ' ' ' " " " ' ' ' ~
' ' ' ~ ~
4.0 Environmental Conditions 4.1 Unusual or Important Environmental Events Any occurrence of an unusual or important event that indicates or could result in significant environmental impact causally related to plant operation shall be recorded and reported to the NRC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> s
f followed by a written report per Subsection 5.4.2.
The following are f
examples:
excessive bird impaction events; onsite plant or animal disease s
outbreaks; mortality or unusual occurrence of any species protected by the Endangered Species Act of 1973; fish kills; increase in nuisance organisms or conditions; and unanticipated or emergency discharge of waste water or chemical substances.
No routine monitoring programs are required to implement this condition.
4.2 Environmental Monitoring 4.2.1 Aquatic Monitoring The certifications and permits required under the Clean Water Act provide mechanisms for protecting water quality and, indirectly, aquatic biota.
The NRC will rely on the decisions made by the State of New Jersey under the authority of the Clean Water Act for any requirements for aquatic monitoring.
4-1
4.2.2 Terrestrial Ecology Nonitoring The applicant will implement the Salt Drift Monitoring Program to assess the impacts of cooling tower salt drift on the environment in the HCGS 4
vicinity provided to NRC by letter dated March 28, 1984 from Robert L. Mitt 1, Public Service Electric & Gas Co., to A. Schwencer U.S. Nuclear Regulatory Comission.
The monitoring program shall comence one year prior to the onset of comercial operation of the HCGS and include low-power testing and operational data up to three years from receipt of license or until such earlier time that the licensee can demonstrate that the objectives of the study have been fulfilled.
Annual monitoring reports shall be submitted to the NRC for review.
The licensee may make changes in the salt drift monitoring. procedures without prior Comission approval unless the proposed change affects the 4
program objectives described in the introduction to the Salt Drift Monitoring Program.
Changes in the procedures, for example, changes which affect sampling frequency, location, gear, or repifcation, shall be recorded.
Records shall describe the changes made, the reasons for making the changes, and a statement showing how continuity of the study will be affected.
Any modifications or changes of the monitoring program, once initiated, shall be governed by the need to maintain consistency with previously used procedures so that direct comparisons of data are technically valid. Suchmodificationsorchangesshal)bejustifiedand 4-2 l
k- -
)
A supported by adequate comparative sampling programs or studies demonstrating the comparability of results or which provide a basis for making adjustments I
i that would permit direct comparisons. The annual report should describe monitoring procedures and changes in such procedures made during the report period.
i t
4 e
l 4
4 1
1
?
I.
I h
4-3 i,
_.., -. ~ - -
5. _.-. _. -,. -. - _ -.. - ~..
---....<i_~_.,,1,--~I___-..
5.0 Administrative Procedures 5.1 Review and Audit The licensee shall provide for review of compliance with the EPP. The review shall be conducted independently of the individual or groups responsible for performing the specific activity. A description of the organization structure utilized to achieve the independent review function and results of the review activities shall be maintained and made available for inspection.
5.2 Records Retention Records and logs relative to the environmental aspects of station operation shall be made and retained in a manner convenient for review and inspection.
These records and logs shall be made available to NRC on request.
Records of modifications to station structures, systems and components determined to potentially affect the continued protection of the environ-ment shall be retained for the life of the stat'on. All other records, data and logs relating to this EPP shall be _ retained for five years or, where applicable, in accordance with the requirmnents of other agencies.
5-1
\\
5.3 Changes in Environmental Protection Plan Requests for changes in the EPP shall include an assessment of the environmental impact of the proposed change and a supporting justification.
Implementation of such changes in the EPP shall not commence prior to NRC approval of the proposed changes in the fonn of a license amendment incorporating the appropriate revision to the EPP.
I 5.4 Plant Reporting Requirements 5.4.1 Routine Reports An Annual Environmental Operating Report describing implementation of this EPP for the previous year shall be submitted to the NRC prior to May 1 of each year. The initial report shall be submitted prior to May 1 of the year following issuance of the operating license.
The report shall include summaries and analyses of the results of the environmental protection activities required by Subsection 4.2 of this EPP for the report period, including a comparison with related preoperational studies, operational controls (as appropriate), and previous nonradiological environmental monitoring reports, and an assessment of the observed impacts of the plant operation on the environment.
If harmful effects or evidence
~
of trends toward irreversible damage to the environment are observed, the licensee shall provide a detailed analysis bf the data and a proposed course of mitigating action.
5-2
The Annual Environmental Operating Report shall also include:
(1) A list of EPP noncompliances and the corrective actions taken to remedy them.
(2) A list of all changes in station design or operation, tests, and experiments made in accordance with Subsection 3.1 which involved a potentially significant unreviewed environmental question.
(3) A list of nonroutine reports submitted in'accordance with Subsection 5.4.2.
In the event that some results are not available by the report due date, the
~
report shall be submitted noting and explaining the missing results. The missing results shall be submitted as soon as possible in a supplementary report.
5.4.2 Nonroutine Reports A written report shall h.e submitted to the NRC within 30 days of occurrence of a nonroutine event. The report shall: (a) describe, analyze,andevaluate the event, including extent and magnitude of the impact, and plant operating '
characteristics; (b) describe the probable cause of the event; (c) indicate the action taken to correct the reported event; (d) indicate the corrective i
5-3
action taken to preclude repetition of the event and to prevent similar occurrences involving similar components or systems; and (e) indicate the agencies notified and their preliminary responses.
Events reportable under this subsection which also require reports to other Federal, State or local agencies shall be reported in accordance with those I
'l reporting requirements in lieu of the requirements of this subsection.
The ll NRC shall be provided with a copy of such report at the same time it is submitted to the other agency.
5 k
6 4
e 5-4
- - -