Requests That Util Clarify in Writing the Intended Start Date of Third 10 Yr ISI Interval & Establish Schedule for Submittal of ISI Program Plan to Allow Adequate Time for Staff Review & Approval of Proposed Alternatives
ML20138G883
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 05/02/1997
From: Dromerick A
NRC (Affiliation Not Assigned)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
References
TAC-M98251, TAC-M98252, NUDOCS 9705060425
Download: ML20138G883 (4)


Text

..

yem%

50 S/7 3/8 p*

4 UNITED STATES g

j NUCLEAR REGULATORY COMMISSION 4"

WASHINGTON, D.C. 30666 4 001 n%...../

May 2, 1997 Mr. Charles H. Cruse Vice President - Nuclear Energy Baltimore Gas and Electric Company Calvert Cliffs Nuclear Power Plant i

1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 4

SUBJECT:

NOTIFICATION OF EXTENSION OF THE INSERVICE INSPECTION AND INSERVICE TEST PROGRAM - SECOND TEN-YEAR INTERVAL CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2 (TAC NOS. M98251 AND M98252)

Dear Mr. Cruse:

The NRC staff has reviewed Baltimore Gas and Electric Company's (BGE) letter dated March 18, 1997, notifying the staff of an extension of its second ten-

)

year interval for the inservice inspection (ISI) and the inservice test (IST) programs for Calvert Cliffs Units 1 and 2.

In regard to the extension of the second ten-year interval of the ISI and the IST programs, the staff concurs with BGE's justification which is in accordance with subsection IWA-2430 of the applicable ASME Code,Section XI.

The specified start date of the third ten-year IST interval and the schedule for submittal of the IST program plan for staff's review are acceptable.

However, the start date of the third ten-year ISI interval is not clearly specified in the submittal.

Please note that a lead time of at least 6 months is necessary for the staff's review of the ISI program plan and the associated relief requests.

BGE states in the above submittal that 10 CFR 50.55a allows 12 months after the beginning of the updated interval to obtain NRC approval for relief requests from any new ASME Code requirements that cannot be met. The 12-month delay for submitting relief requests are limited to those where an examination requirement by the Code or addenda is determined to be impractical pursuant to 10 CFR 50.55a(g)(5)(iv).

If the licensee proposed an alternative to the Code requirement pursuant to 10 CFR 50.55a(a)(3)(i) or (a)(3)(ii), such a request should be submitted to NRC for authorization prior to its implementation by the licensee.

g %hh omi[j j

9705060425 970502 PDR ADOCK 05000317 G

PDR

u' O

C. Cruse Therefore, BGE should clarify in writing the intended start date of its third ten-year ISI interval and estabitsh a schedule for submittal of its ISI program plan to allow adequate time for staff review and approval of proposed alternatives to the Code requirements.

If you have any questions regarding this matter, please contact me at (301) 415-3473.

Sincerely, Alexander W. Dromerick, Senior Project Manager Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-317 and 50-318 cc: See next page i

e l

l

C. Cruse May 2, 1997 Therefore, BGE should clarify in writing the intended start date of its third ten-year ISI interval and establish a schedule for submittal of its ISI program plan to allow adequate time for staff review and approval of proposed alternatives to the Code requirements.

I If you have any questions regarding this matter, please contact me at (301) 415-3473.

1 3

Sincerely,

/S/

Alexander W. Dromerick, Senior Project Manager Project Directorate I-1 4

Division of Reactor Projects - I/II 4

Office of Nuclear Reactor Regulation l

i Docket No. 50-317 and 50-318 l

cc:

See next page i-DISTRIBUTION:

Docket File-PUBLIC PDI-l R/F S. Varga l

S. Bajwa S. Little A. Dromerick OGC ACRS j

L. Doerflein, Region I i

I DOCUMENT NAME:

G:\\CCl-2\\ EXTEND.LTR To receive a copy of this document, indicate in the box:

"C" - Copy without attachment / enclosure "E" - Copy,with attachment / enclosure "N" - No copy l 0FFICE PM:PDI 1 lE LA:PDI-lQ l l

) D:PDI 1 f f()

l l

l A

f NAME ADr M r/t SLittt f SBajwa

@}N 4

DATE QS 7 /97~

0@ l /97 OQ y/97 Offici.al Record Copy I

Mr. Charles H. Cruse Calvert Cliffs Nuclear Power Plant i

Baltimore Gas & Electric Company Unit Nos. I and 2 cc:

President Mr. Joseph H. Walter, Chief Engineer Calvert County Board of Public Service Commission of Commissioners Maryland 175 Main Street Engineering Division Prince Frederick, MD 20678 6 St. Paul Centre 1

Baltimore, MD 21202-6806 James P. Bennett, Esquire Counsel Kristen A. Burger, Esquire Baltimore Gas and Electric Corapany Maryland People's Counsel P.O. Box 1475 6 St. Paul Centre Baltimore, MD 21203 Suite 2102 Baltimore, MD ~ 21202-1631 Jay E. Silberg, Esquire Shaw, Pittman, Potts, and Trowbridge Patricia T. Birnie, Esquire 2300 N Street, NW Co-Director Washington, DC 20037 Maryland Safe Energy Coalition P.O. Box 33111 Mr. Terrence J. Camilleri, Director, Baltimore, MD 21218 NRM Calvert Cliffs Nuclear Power Plant Mr. Loren F. Donatell 1650 Calvert Cliffs Parkway NRC Technical Training Center Lusby, MD 20657-4702 5700 Brainerd Road Chattanooga, TN 37411-4017 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 287 St. Leonard, MD 20685 Mr. Richard I. McLean Administrator - Radioecology Department of Natural Resources 580 Taylor Avenue Tawes State Office Building, B3 Annapolis, MD 21401 Regional Administrator, Region I

~

U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406