Forwards Draft Technical Evaluation Rept Re Licensee Response to Generic Ltr 83-28,Item 1.2, Post-Trip Review: Data & Info Capabilities. Addl Info Required in Order to Complete Review & Preserve Present Review Schedule
ML20138G775
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/15/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Capstick R
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20138G781 List:
References
GL-83-28, NUDOCS 8510250610
Download: ML20138G775 (2)


Text

__

October 15, 1985 Docket No. 50-271 Mr. R. W. Capstick Licensing Engineer Vermont Yankee Nuclear Power Corporation 1671 Worcester Road Framingham, Massachusetts 01701

Dear Mr. Capstick:

SUBJECT:

DRAFT TECHNICAL EVALUATION REPORT (TER) FOR SALEM ATWS, ITEM 1.2 (GENERIC LETTER 83-28)

Re:

Vermont Yankee Nuclear Power Station The staff has completed a preliminary review to assess the completeness and adequacy of licensee responses to Generic Letter 83-28, Item 1.2.

For the Vermont Yankee Nuclear Power Station, your response was found to be incomplete in three of the areas evaluated.

The enclosed TER provides a technical evaluation representing the staff's initial judgement of the areas evaluated.

In order to preserve our present review schedule, we would appreciate your cooperation in obtaining additional information that will permit us to complete our review.

It would appear that the needed information on your facility could be obtained by telephone conference within 1 week of your receipt of the Draft TER. Your project manager will be warking with you to arrange an acceptable time to conduct the necessary conference calls.

Sincerely, Original signed by/

Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION Docket File HThompson ELJordan Gray File NRC PDR 0 ELD JParticw Local PDR SNorris

/

BGrimes ORB #2 Reading

/hJ'

/'

VRooney f

ACRS (10)

I

~W l

DL: RB#2 DL:0RB42 DL.'RB#2 l

SN is:ajs VRooney DVass3110 l

10/11/85 10/61/85 10/ f/85

/

l l

8510250610 e51015 PDR ADOCK 05000271 P

PDR

1 Mr. R. W. Capstick Vemont Yankee fluclear Power Corporation Vermont Yankee Nuclear Power Station cc:

Pr. W. F. Conway W. P. Murphy, Vice President &

L President & Chief Executive Officer Manager of Operations Vermont Yankee Nuclear Power Corp.

Yemont Yankee Nuclear Power Corp.

R. D. 5, Box 169 R. D. 5, Box 169 Ferry Road Ferry Road Brattleboro, Vermont 05301 Brattleboro, Vemont 05301 1

Mr. Donald Hunter, Vice President Mr. Gerald Tarrant Commissioner Vermont Yankee Nuclear Power Corp.

Vermont Department of Public Service 1671 Worcester Road 120 State Street Framingham, Massachusetts 01701 Mortpelier, Vemont 05602 New England Coalition en Nuclear Pollution Hill and Dale Fam Public Service Board R. D. 2, Box 223 State of Vermont Putney, Vemont 05346 120 State Street Montpelier, Vemont 05602 Mr. Walter Zaluzny Chaiman, Board of Selectman 4

Yemont Yankee Decommissionirg Post Office Box 116 Alliance Vernon, Vemont 05345 Box 53 Montpelier, Vermont 05602-0053 J. P. Pelletier, Plant Manager Vemont Yankee fluclear Power Corp.

Post Office Box 157 Resident Inspector Vernon, Vemont 05354 U. S. Nuclear Regulatory Comission Post Office Box 176 Rayrond N. McCandless Vernon, Verront 05354 Vemont Division of Occupational i

& Radiological Health Vemont Public Interest Administration Building Research Group, Inc.

10 Baldwin Street 43 State Street Mcntpelier, Vemont 05602 Montpelier, Vermont 05602 Honorable John J. Easton Thomas A. Murley l

Attorney General Regional Adninistrator State of Vermont Regicn I Office 109 State Street U. S. ?!uclear Regulatory Cornission Montpelier, Vermont 05602 631 Park Avenue King of Prussia, Pennsylvania 19406 John A. P.itscher, Esquire Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110

- - ~ ' - ' ~ ' ~ ~