ML20138G639

From kanterella
Jump to navigation Jump to search
Forwards Security Training & Qualification Plan,Rev 12A. Withheld
ML20138G639
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/26/1996
From: Bailey J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
102-03829-JAB-A, 102-3829-JAB-A, NUDOCS 9701020144
Download: ML20138G639 (2)


Text

a commenwar. Aumerms.taew Jack A. Bailey Mail Station 7605 Palo Verde Nuclear Vk* President TEL 602/393-5444 P.O. Box 52034 Generatng Statior.

Nuclear Support FAX 602/393-6077 Phoerix. AZ 85072 2034 102-03829-JAB /AKK/ RAS December 26,1996 I

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555-0001

Reference:

Letter dated October 23,1996, from K. E. Brockman, USNRC to J. M. Levine, APS

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1,2, and 3 Docket Nos. STN 50-528/529/530 Security Training and Qualification Plan, Revision 12A Enclosed please find three copies of the amended Revision 12 to the Security Training and Qualification Plan. Two copies of this amended Training and Qualification Plan (numbered 12A) are also being submitted to the Regional Administrator, NRC Region IV pursuant to 10 CFR 50.4 (b)(4),10 CFR 50.54(p)(2) and in reply to the reference above.

Revision 12A to the Security Training and Qualification Plan includes (as an attachment) a detailed description of the Physical Agility Test Program, similar to Revision 11 of the plan. Also, the revised plan clarifies the training requirements for Security Shift Team Leaders and Contract Security Personnel, clarifies the granting of extensions to training and qualification requirements, and includes title changes resulting from recent organizational restructuring.

Revision 12A to the Security Training and Qualification Plan was reviewed in accoroance with 10 CFR 50.54 and NRC Generic Letter 95-08 and does not decrease the safeguards effectivenesa of the Plan or the overall level of security system performance.

APS has determined the Security Training and Qualification Plan is a proprietary document subject to the controls of 10 CFR 2.790(d). Accordingly, the enclosures should be withheld from public disclosure and should not be placed in the Public Document

Room, fn 9701020144 961226

/

PDR ADOCK 05000528

//

F PDR

\\

/

g

'7 s

s

, U. S. Nucle r Regul: tory Commission ATTN: Document Control Desk

- Security Training and Qualification Plan, Revision 12A n

2 Page 2 Should you have questions regarding this submittal, please contact Craig K.

Seaman at (602) 393-2099.

Sincerely, g h [8bA"Q JAB /AKK/ RAS /rs

Enclosures:

1.

Summary of changes to the PVNGS Security Training and Qualification Plan 2.

Justification of changes to the PVNGS Security Training and Qualification Plan 3.

Revision 12A of the PVNGS Security Training and Qualification Plan cc:

L. J. Callan K. E. Perkins K. E. Johnston J. W. Clifford