ML20138G000

From kanterella
Jump to navigation Jump to search
Forwards LER Rev 96-010-01 Re Failure to Comply W/Wcgs Ts. Licensee Recognized That LER Should Have Identified Valve Inoperability as Reportable Per TS 3.6.3 Rather than 3.7.4
Date released: 05/31/2020 Download: ML20138G000


Forwards LER Rev 96-010-01 Re Failure to Comply W/Wcgs Ts. Licensee Recognized That LER Should Have Identified Valve Inoperability as Reportable Per TS 3.6.3 Rather than 3.7.4
ML20138G821
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/30/1997
From: Warren C
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20138G821 (1)
:on 961009,failure of MOV to Fully Close Occurred Due to Inadequate pre-tensioning of Torque Switch Contact Finger.Valve Actuator Was Repaired,Training Was Provided & Program Requirements Revised
ML20138F995
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 04/30/1997
From: Flannigan R
WOLF CREEK NUCLEAR OPERATING CORP.
To:
References
Download: ML20138F995 (8)