ML20138F783

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-261/91-05 on 910216-0330.Violations Noted
Date released: 05/31/2020 Download: ML20138F783


Insp Rept 50-261/91-05 on 910216-0330.Violations Noted.Major Areas Inspected:Operational Safety Verification,Surveillance Observation,Maint Observation,Engineered Safety Feature Sys Walkdown & Onsite Review Committee
ML20138F796
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/12/1991
From: Christensen H, Garner L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
Download: ML20138F796 (27)
Notice of Violation from Insp on 910216-0330.Violation Noted:Documented Instructions Were Not Provided for Method to Establish Temporary Heating Equipment to Maintain Reactor Vessel Head Flang Temp.Procedures & Drawings Not Provided
ML20138F790
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/12/1991
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
Download: ML20138F790 (1)
Forwards Insp Rept 50-261/91-05 on 910216-0330.Violations Noted
ML20138F776
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 04/12/1991
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: EURY L W
CAROLINA POWER & LIGHT CO.
References
Download: ML20138F776 (3)