ML20138F470
| ML20138F470 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/10/1985 |
| From: | Chrissotimos N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fay C WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20138F473 | List: |
| References | |
| NUDOCS 8510250271 | |
| Download: ML20138F470 (2) | |
See also: IR 05000266/1985015
Text
6
0 /M @
.
OCT 101985
Docket No. 50-266
Docket No. 50-301
Wisconsin Electric Power Company
ATTN:
Mr. C. W. Fay
Vice President
Nuclear Power Department
231 West Michigan, Room 308
Milwaukee, WI 53201
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. R. L. Hague
and R. J. Leemon of this office on August 1, 1985 to September 30, 1985 of
activities at Point Beach Nuclear Plant, Unit 1 and 2, authorized by NRC
Operating Licenses No. DPR-24 and No. DPR-27 and to the discussion of our
findings with J. J. Zach at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as described in the enclosed Appendix.
The inspection showed that action had been taken to correct the identified
violation and to prevent recurrence. Consequently, no reply to this violation
is required and we have no further questions regarding this matter at this
time.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", Part 2
Title 10, Code of Federal Regulations, a copy of this letter and the enclosure
will be placed in the NRC's Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
85102go
$h
'
p
. Original signed by N.J. Chrtssetfmos'
9
N. J. Chrissotimos, Chief
Projects Branch 2
Enclosure:
Inspection Reports
No. 50-266/85015 (DRP);
No. 50-301/85015 (DRP)
See Attached List For Distributinr.
16d l
t
.
Wisconsin Electric Power Company
2
Distribution
cc w/ enclosure:
J. J. Zach, Plant Manager
DMS/ Document Control Desk (RIDS)
Resident Inspector, RIII
John J. Duffy, Chief
Boiler Section
Ness Flores, Chairperson
Wisconsin Public Service
Commission
RIII
ard r/pg
Jac
C issotimos