Forwards Breakdown of Review Costs by Program Ofc,Per Cost Analysis for OL Application Review During 840624-1222.Fee Paid.No Addl Fee Owed
ML20138E573
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/11/1985
From: Miller W
NRC OFFICE OF ADMINISTRATION (ADM)
To: Jens W
DETROIT EDISON CO.
References
NUDOCS 8512130490
Download: ML20138E573 (2)


Text

- - - -

p.

DISTRIBUTION:

  • PDR LPDR LFMS Actual Manpower File RMDiggs DEC 111985 CJHolloway
Reg Docket Filet DWeiss LFMS Reactor File LSolander, PRAB

"' ^

Docket No. 50-341 C r o, R DLynch, NRR The Detroit Edison Company MRushbrook, NRR Attn: Dr. Wayne Jens Vice President-Nuclear Operations 2000 Second Avenue Detroit, MI 48226 Gentlemen:

As you are aware,10 CFR 170 of the Commission's regulations for license and inspection fees was revised effective June 20, 1984. Section 170.12(b) of the revised rule provides that for applications for permits, licenses, facility reference design approvals, and special projects which have been on file with the Cormiission for review for six months or longer, billings would be made at six-month intervals or when the review is completed, whichever is earlier.

Consistent with the requirements of 10 CFR 170.12(b), we have completed the cost analysi s for the Fermi 2 OL application review for the period June 24, 1984 through December 22, 1984. The cost through that period is $1,010,693. The enclosure shows a breakdown of the review custs by program office. When the costs of $1,010,693 are added to the costs of

$3,990,470 from the previous period, the cumulative OL review costs through December 22,1984 are $5,001,163.

Operating licenses for 5% power operation and 100% power operation were issued to your Company on March 20, 1985 and July 15, 1985 respectively.

Since your company has received an operating license from the NRC,

$3,077,400 is the maximum fee that may be assessed for the OL review in accordance with 10 CFR 170.21 as revised June 20, 1984. Your company was billed for the maximum fee on January 25, 1985 and the fee has been paid therefore no additional OL fees are owed by Detroit Edison Company.

Sincerely,

$@k21gg g gggggg41 ,

P PDR William O. Miller, Director License Fee Management Staff Office of Administration

/ DW/ Cost Analysis Letter /TAS

" '

  • LFM[/ADM f l LFMS/ADM

. q. . .f.. 7

=v===> lloway WOMiller l y.

l

. . .ey _ - -

7

= m 12/ /85 12/ /85 i

. .i> .

{..

...t.

_ _g . .

we rozu ns uo.so Nacv ono OFFICIAL RECORD COPY

9 DETROIT EDISON COMPANY ,

OPERATING LICENSE REVIEW COSTS FROM 6/24/84 THROUGH 12/22/84 FACILITY: Fermi 2 DOCKET NO.: 50-341 Costs Per Professidnal Prcgram Office Professional Staff-hours Staff-hour Contractual Total s Review Staff-hour Expended Costs Costs Costs

1. NRR $62 3760.5 $233,151 $ 61,086 $294,237
2. IE-HQ 53 207.0 10,971 14,400 25,371
3. REGIONS 53 10,418.4 552,175 129,510 681,685 4 ACRS 62 3.8 236 - 236
5. NMSS 58 158.0 9,164 - 9,164 ,-

iotal Cost: $1,010,693