ML20138E525

From kanterella
Jump to navigation Jump to search
Forwards Rev 10 to 100-PLN-7200-01, Gpu Nuclear Operational QA Plan, Revising Organizational Structure.Changes, Discussed
ML20138E525
Person / Time
Site: Oyster Creek, Crane
Issue date: 04/25/1997
From: Rone A
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138E529 List:
References
6000-97-3012, 6710-97-2157, 6730-97-2119, NUDOCS 9705050002
Download: ML20138E525 (2)


Text

y.

j GPU Nuclear, Inc.

(

One Upper Pond Road NUCLEAR Parsippany, NJ 070541095 Tel 201-316 7000 April 25,1997 i

6000-97-3012 6710-97-2157 6730-97-2119 l

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 l

Gentlemen:

Subject:

Three Mile Island Nuclear Generating Station, Unit 1 (TMI-1) -

Docket No. 50-289 Oyster Creek Nuclear Generating Station (OCNGS)-

Docket No. 50-219 Operational Quality Assurance Plac, Revision 10 After an extensive internal review of the nuclear safety assurance process at GPU Nuclear, the review team proposed a reorganization of the organizational structure of the groups involved in the process. The GPU Nuclear Operational Quality Assurance (OQA) Plan has been revised to reflect this realignment of functional responsibilities. The proposed changes are consistent with the Technical Specification requirements of both plants.

The proposed changes entail combining the Licensing & Regulatory Affairs (L&RA) Department with the Nuclear Safety Assessment (NSA) Department under a single director.

All the responsibilities of both departments have been retained under the proposed structure. The Director position will retain the responsibilities of the NSA Director and assume the responsibilities of the L&RA Director. At the two plant sites the Director will be supported by a Manager, Assessments /

and a Manager, Nuclear Safety and Licensing.

The Manager (s), Assessments will have implementation responsibility for audits and assessments at their respective sites. The Manager (s),

j Nuclear Safety and Licensing will manage the IOSRG function in addition to the licensing function. In the corporate office, the Director will be supported by a Manager Licensing and.

Vendor Audits and a Consultant to perform staff work for GORB. While there will be a number of management level personnel to develop positions and support implementation, overall responsibility will rest with the director.

05050000 970425 R

p ADOCK 05000219 lll ll ll\\ llU.lll.llll. l.l

6730-97-2119 page 2 of 2 1

The two departments involved in the change are complementary in their functional responsibilities and each requires a degree ofindependence from the line organization. The independence of the NSA Department is required by Appendix B to 10 CFR 50, the Technical Specifications and reflected in the OQA Plan. The independence of the L&RA Department is dictated by prudence and organizational theory.

In accordance with the provisions of 10 CFR 50.54(a), GPU Nuclear is submitting this change for the NRC's review and approval prior to implementation. Upon approval by the NRC, Revision 10 of the OQA Plan will be made effective and an update to the FSAR will be prepared.

GPU Nuclear believes that the recommendations of the process review team will enhance the nuclear safety assurance process. The reorganization is a key component of the changes and implementing the reorganization is contingent upon approval of the changes to the OQA Plan. We therefore request an expedited review of the changes.

Copies of the affected pages of the OQA Plan are attached. Should you have any questions or desire additional information regarding the changes to the OQA Plan, GPU Nuclear will gladly meet with the NRC staff. To arrange a meeting please contact Dennis Kelly (201-316-7885) of our Licensing Department.

Sincerely, l

J

.11. Rone Vice President and Director Nuclear Safety & Technical Services AIIR/DPK/ lab cc:

Administrator, Region 1 TMI Senior Resident Inspector Oyster Creek Senior Resident Insp ctor TMI Project Manager Oyster Creek Project Manager