ML20138E493
| ML20138E493 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 05/01/1997 |
| From: | Tam P NRC (Affiliation Not Assigned) |
| To: | NRC (Affiliation Not Assigned) |
| References | |
| TAC-M97539, NUDOCS 9705020254 | |
| Download: ML20138E493 (2) | |
Text
,... - -...-.. -..
p crooD < * +-
j o%
UNITED STATES 4
l
'g j
NUCLEAR REGULATORY COMMISSION
't WASHINGTON, D.C. 20566 4001 i
i ok 4.....
4 May 1, 1997 I
MEMORANDUM FOR:
Docket File FROM:
Peter S. Tam, Senior Project Manager Project Directorate II-2 l
Division of Reactor Projects.- I/II M
Office of Nuclear Reactor Regulation
SUBJECT:
CATAWBA UNIT 2 - IMPLEMENTATION OF AMENDMENT 150 TO OPERATING LICENSE (TAC M97539)
The attached page, transmitted by. fax from Duke Power Company, signifies the implementation of operating license Amendment 150 on April 22,.1997.
1 i
Docket Numbers 50-414 Distribution Docket file PUBLIC H. Berkow NRCf]LECEM S M cacosa OFoI i
9705020254 970501 PDR ADOCK 05000414 P
CompHamee Functional Area Manual 3.3 FOI/r$
Rev. 2 Page 1 of 2 FACILITY OPERATTNG LICENSE / TECHNICAL SPECIFICATION CHANGE IMPLEMENTATION SHEET
%CNS Q MNS O ONS UNITNO. O 1 f 2 0 3
{
sJ/4 Tews $. 8 -t;BdM
- .*-+
s S.8-4~,4 9-L.
DATE RF.CEIVED Yd'17
'I3 NO.
'Sl+.4.I,sl4.5.2 j
AMENDMENT. NO.
N SITE PLAN NO(S).
p/g L
IMPLEMENTATION DATES A.
NRC EFFECTIVE DATE (From NRC letter): _
'l ' D ' N B.
STATION IMPLEMENTATION (Grace Period - 2 WEEKS):
2.
PLANTNOTIFICATION
{
Are A.
/6147 Via E-Mail Distribution; Include Site Technical Contacts D
/ "4L%c-implemsmadon Items rtr cA1-LUt 4
\\
3.
RGC TECHNICAL CONTEN~r REVIEW CRITERIA Q
A.
A11 Discrepancies Have Been Resolved Via NRC Interface.
Q B.
No Inadvertent Changen Were Made To T$ Sheets Involved.
C.
TS Change Was lasued As Requested By DPC.
TECHNICAL REVIEWER:
M MdM7 (List Discrepancies On Attached Page)
Date CHECKED BY:
b[
lIJA 97
/\\
(List ihscrepancies On Attached Page)
Date 4.
O ALL CORRECTIVE ACTIONS FROM ASSIGNED PIP COMPLETED VERIFIED BY:
M
_ NMf17 Regulatory Compliance Date 5.
FINALIMPLEMENTATION APPROVAL MStahin 4/a/n Manager, Regulato Compliance Date Mana@, Safety Assurance
' D&te goo [g 3XVI'IdR03 1801Y1303H 16TCICSC09 IY3 33'CI G3m 16/0C/t0