ML20138E493

From kanterella
Jump to navigation Jump to search

Forwards Fax from Util Re Implementation of OL Amend 150 on 970422
ML20138E493
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 05/01/1997
From: Tam P
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
References
TAC-M97539, NUDOCS 9705020254
Download: ML20138E493 (2)


Text

,... - -...-.. -..

p crooD < * +-

j o%

UNITED STATES 4

l

'g j

NUCLEAR REGULATORY COMMISSION

't WASHINGTON, D.C. 20566 4001 i

i ok 4.....

4 May 1, 1997 I

MEMORANDUM FOR:

Docket File FROM:

Peter S. Tam, Senior Project Manager Project Directorate II-2 l

Division of Reactor Projects.- I/II M

Office of Nuclear Reactor Regulation

SUBJECT:

CATAWBA UNIT 2 - IMPLEMENTATION OF AMENDMENT 150 TO OPERATING LICENSE (TAC M97539)

The attached page, transmitted by. fax from Duke Power Company, signifies the implementation of operating license Amendment 150 on April 22,.1997.

1 i

Docket Numbers 50-414 Distribution Docket file PUBLIC H. Berkow NRCf]LECEM S M cacosa OFoI i

9705020254 970501 PDR ADOCK 05000414 P

PDR

CompHamee Functional Area Manual 3.3 FOI/r$

Rev. 2 Page 1 of 2 FACILITY OPERATTNG LICENSE / TECHNICAL SPECIFICATION CHANGE IMPLEMENTATION SHEET

%CNS Q MNS O ONS UNITNO. O 1 f 2 0 3

{

sJ/4 Tews $. 8 -t;BdM

  • .*-+

s S.8-4~,4 9-L.

DATE RF.CEIVED Yd'17

'I3 NO.

'Sl+.4.I,sl4.5.2 j

AMENDMENT. NO.

N SITE PLAN NO(S).

p/g L

IMPLEMENTATION DATES A.

NRC EFFECTIVE DATE (From NRC letter): _

'l ' D ' N B.

STATION IMPLEMENTATION (Grace Period - 2 WEEKS):

2.

PLANTNOTIFICATION

{

Are A.

/6147 Via E-Mail Distribution; Include Site Technical Contacts D

/ "4L%c-implemsmadon Items rtr cA1-LUt 4

\\

3.

RGC TECHNICAL CONTEN~r REVIEW CRITERIA Q

A.

A11 Discrepancies Have Been Resolved Via NRC Interface.

Q B.

No Inadvertent Changen Were Made To T$ Sheets Involved.

C.

TS Change Was lasued As Requested By DPC.

TECHNICAL REVIEWER:

M MdM7 (List Discrepancies On Attached Page)

Date CHECKED BY:

b[

lIJA 97

/\\

(List ihscrepancies On Attached Page)

Date 4.

O ALL CORRECTIVE ACTIONS FROM ASSIGNED PIP COMPLETED VERIFIED BY:

M

_ NMf17 Regulatory Compliance Date 5.

FINALIMPLEMENTATION APPROVAL MStahin 4/a/n Manager, Regulato Compliance Date Mana@, Safety Assurance

' D&te goo [g 3XVI'IdR03 1801Y1303H 16TCICSC09 IY3 33'CI G3m 16/0C/t0