UNITED STATES I O i
NUCLEAR REGULATORY COMMISSION k
fE WASHINGTON, D.C. 20666 4 001
%...../
April 29, 1997 Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III 1400 Opus Place, Suite 500 Downers Grove, IL 60515
SUBJECT:
DEFERRAL FROM THE REQUESTED ACTIONS OF BULLETIN 96-03 FOR QUAD CITIES NUCLEAR POWER STATION, UNIT 2 (TAC N0. M96164)
Dear Ms. Johnson:
By letter dated October 31, 1996, you notified the U.S. Nuclear Regulatory Commission (NRC) that it was the intent of Commonwealth Edison Company (Comed) to install new emergency core cooling system (ECCS) suction strainers of sufficient size to resolve the issue of potential strainer blockage by loss-of-coolant accident (LOCA) generated debris and other materials during the spring 1997 refueling outage of Quad Cities, Unit 2.
In a February 26, 1997, letter to the NRC, you notified the NRC that although you still intend to install larger passive suction strainers during the spring 1997 refueling outage at Quad Cities, Unit 2, you consider it necessary to request a schedular deferral from compliance with Bulletin 96-03.
The basis for this schedular deferral is that the Boiling Water Reactor Owners Croup's (BWROG) Utility Resolution Guidance (URG) report, upon which the design of the strainers is based, is still under review by the NRC staff.
We find your request to defer compliance with Bulletin 96-03 until December 31, 1998, acceptable based on your commitments to prior Bulletins on this subject (Bulletin 93-02; Bulletin 93-02, Supplement 1; and Bulletin i
l 95-02), the commitments in your February 26, 1997, letter to desludge the
/
suppression pools, and to undertake a program to reduce the sources of fibrous fy insulation.
In addition to the Comed commitments discussed above, we request that you take the following actions:
1.
We request that you perform an inspection in the drywell to verify that:
(1) insulation is not damaged, and (2) it is properly installed; and that any insulation that is damaged or not properly installed be repaired or removed.
NBC Fif CENTER COPY l
.,,4m 9705010333 970429 PDR ADOCK 05000265 O
_~- -.. ~. -. -. _ - - - _ - -
l l
i l
l 4
^
I.-Johnson l 2.
We also request that you perform a thorough drywell and suppression pool l
closeout inspection to verify that all foreign materials such as maintenance tools, equipment, construction materials, and miscellaneous debris, have been removed. This inspection should include the downcomers and vents.
We conclude that the installation of larger strainers, the compensatory actions and commitments to previous Bulletins, along with the two actions requested above will provide assurance of the continued safe operation of Quad Cities, Unit 2, and, therefore, we find that your request to defer compliance with Bulletin 96-03 is acceptable until December 31, 1998. Within 30 days of completion of refueling outage Q2R14 please inform the staff by letter of the completion of your commitments as well as the two additional items referenced above.
Sincerely, Original signed by:
Robert M. Pulsifer, Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation Docket No. 50-265 cc:
see next page Distribution:
Docket File PUBLIC PDIII-2 r/f J. Roe, JWR E. Adensam, EGA1 j
R. Capra j
C. Moore R. Pulsifer OGC, 015B18 ACRS, T2E26 W. Kropp, RIII DOCUMENT NAME:
QC96164.LTR
- See Previous Concurrence l
To esosive a copy of this document. Indicart in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy 0FFICE PM:PDIII-2_
E 1A1PNII-2l SCSB D:PDIII-2 le NAME RPULSIFERffJ IM5bfGA CBERLINGER*
RCAPRA M DATE 04/2(/97 04/ S /97 04/22/97 BW 04/et/97 4
0FFICIAL RECORD COPY
I. Johnson Quad Cities Nuclear Power Station Commonwealth Edison Company Unit Nos. I and 2 CC*
Michael I. Miller, Esquire Document Control Desk-Licensing Sidley and Austin Commonwealth Edison Company One First National Plaza 1400 Opus Place, Suite 400 Chicago, Illinois 60603 Downers Grove, Illinois 60515 Mr. L. William Pearce Station Manager Quad Cities Nuclear Power Station 22710 206th Avenue North Cordova, Illinois 61242 U.S. Nuclear Regulatory Commission j
Quad Cities Resident Inspectors Office 22712 206th Avenue North Cordova, Illinois 61242 l
Chairman i
Rock Island County Board of Supervisors 1504 3rd Avenue Rock Island County Office Bldg.
Rock Island, Illinois 61201 Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704 Regional Administrator U.S. NRC, Region III 801 Warrenville Road Lisle, Illinois 60532-4351 Richard J. Singer Manager - Nuclear MidAmerican Energy Company 907 Walnut Street P.O. Box 657 Des Moines, Iowa 50303 i
Brent E. Gale, Esq.
Vice President - Law and Regulatory Affairs MidAmerican Energy Company i
One Rivertenter Place i
106 East Second Street i
i P.O. Box 4350 Davenport, Iowa 52808 i
,