Forwards Idvp Insp Rept 50-354/85-54 on 850930-1004.All Action Items Identified in Previous Rept Closed
ML20138D819
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 12/11/1985
From: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Mittl R
Public Service Enterprise Group
Shared Package
ML20138D824 List:
References
NUDOCS 8512130308
Download: ML20138D819 (5)


See also: IR 05000354/1985054

Text

P

4

[f

7't

NUCLEAR REGULATORY COMMISSION

UNITED STATES

'

W ASHINGTON, D. C. 20555

.....

Dicket No. 50-354

Public Service Electric and Gas Company

ATTN:

Mr. Robert L. Mitti, General Manager

Nuclear Assurance and Regulation

P.O. Box 570, T22A

Newark, New Jersey 07101

Dear Mr. Mitti:

SUBJECT: HOPE CREEK UNIT 1 INDEPENDENT DESIGN VERIFICATION PROGRAM (IDVP)

INSPECTION REPORT 50-354/85-54

This letter conveys the results of the inspection activities of the Hope Creek

generating station (HCGS) Unit 1 IDVP final report.

The inspection was

conducted by NRC's Office of Inspection and Enforcement from September 30

through October 4, 1985 at Sargent and Lundy Engineers' (S&L) office in

Chicago, Illinois. The NRC inspection team was composed of personnel from

NRC's Office of Inspection and Enforcement and consultants.

The specific objectives of this inspection were to (1) ensure that the

conclusions in the report were technically supported, and (2) verify that

the items identified in inspection report 50-354/85-32 were incorporated in the

program or otherwise satisfactorily resolved.

The status of NRC inspection items from Inspection Report 50-354/84-32 dated

May 8-10, and June 4-6, 1985 are given in the attached inspection report.

All

NRC action items identified in the previous report are closed.

Sincer

,

851213o308 851211

-

gDR

ADocK 05000354

rian K. Grimes, Director

_-

PDR

,-

Division of Quality Assurance, Vendor

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure:

Inspection Report 50-354/85 *4

cc: w/ enclosure

See next Page

.

_.-

Mr. R. L. Mitti

"f

Public Service Electric & Gas Co.

Hcpe Creek Generating Station

V

cc:

Gregcry Minor

Susan C. Remis

Richard Hubbard

Division of Public Interest Advocacy

Dale Bridenbaugh

New Jersey State Department of

1918 Technical Associates

the Public Advocate

1723 Hamilton Avenue, Suite K

Richard J. Hughes Justice Comples

San Jose, California 95125

CN-850

Trenton, New Jersey 08625

Troy B. Conner, Jr. Esquire

Office of Legal Counsel

Conner & Wetterhahn

Department of Natural Resources

1747 Pennsylvania Avenue N.W.

and Environmental Control

Washington, D.C.

20006

89 Kings Highway

P.O. Box 1401

Dover, Delaware 19903

Richard Fryling, Jr., Esquire

Mr. K. W. Burrowes, Project Engineer

Associate General Solicitor

Bechtel Power Corporation

Public Service Electric & Gas Company

50 Beale Street

P. O. Box 570 T5E

P. O. Box 3965

Newark, New Jersey 07101

San Francisco, California 94119

Mr. J. M. Ashley

Resident inspector

Senior Licensing Engineer

,

U.S.N.R.C.

c/o Public Service Electric & Gas Co.

P. O. Box 241

Bethesda Office Center, Suit 550

Hancocks Brid5e, New Jersey 08038

4520 East-West Highway

Bethesda,flaryland 20814

Richard F. Engel

Deputy Attorney Generel

Mr. A. E. Giardino

s

Division of Law

Manager - Quality Assurance E&C

Environmental Protection Section

Public Service Electric & Gas Co.

Richarc J. Hughes Justice Complex

P. O. Box A

CN-112P

Hanc N ks Bridge, New Jersey 08038

Trenten, New Jersey 08625

Mr. Robert J. Touhey,

Mr. Anthony J. Pietrofitta

Acting Director

General Manager

DNREC - Divisicr cf

Power Production Engineering

Environrental Control

Atlantic Electric

89 Kings Highway

1199 Black Horse Pike

P. O. Box 1401

Pleasantville, New Jersey 08232

Dover, Delaware 19903

Regional Administrator, Region I

Mr. R. S. Salvesen

U. S. Nuclear Regulatory Comission

General Manager-Hope Creek Operation

631 Park Avenue

Public Service Electric & Gas Co.

King of Prussia, Pennsylvania 19406

P.O. Box A

/[

Hancocks Bridge, New Jersey 08038

k

-

-

-.

.

'

'.

Public Service Electric & Gas Co.

-2-

Hope Creek Generating Station

!

d

cc:

Mr. B. A. Preston

Public Service Electric & Gas Co.

Hope Creek Site MC12Y

Licensing Trailer 12LI

Foot of Button wood Road

Hancock's Bridge, New Jersey 08038

Ms. Rebecca Green

New Jersey Bureau of Radiation

Protection

380 Scotch Road

Trenton, New Jersey 08628

r-

l t

'.

'

.

'

D

'

g Docket No. 50-354

Public Service Electric and Gas Company

ATTN:

Mr. Robert L. Mittl, General Manager

Nuclear Assurance and Regulation

P.O. Box 570, T22A

Newark, New Jersey 07101

Dear Mr. Mitti:

SUBJECT:

HOPE CREEK UNIT 1 INDEPENDENT DESIGN HRIFICATION PROGRAM (IDVP)

INSPECTION REPORT 50-354/85-54

This letter conveys the results of the inspection activities of the Hope Creek

generating station (HCGS) Unit 1 IDVP final report.

The inspection was

conducted by NRC's Office of Inspection and Enforcement from September 30

through 0ctober 4, 1985 at Sargent and Lundy Engineers' (S&L) office in

Chicago, Illinois.

The NRC inspection team was composed of personnel from

NRC's Office of Inspection and Enforcement and consultants.

The specific objectives of this inspection were to (1) ensure that the

conclusions in the report were technically supported, and (2) verify that

the items identified in inspection report 50-354/85-32 were incorporated in the

program or otherwise satisfactorily resolved.

The status of NRC inspection items from Inspection Report 50-354/84-32 dated

May 8-10, and June 4-6, 1985 are given in the attached inspection report.

All

NRC action items identified in the previous report are closed.

Sincerely,

Brian K. Grimes, Director

Division of Quality Assurance, Vendor

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure:

Inspection Report 50-354/85-54

cc: w/ enclosure

DISTRIBUTION:

DCS

JMTaylor, IE

JLMilhoan, IE

JStrosnider, RI

NRC PDR'

RHVollmer, IE

EVImbro, IE

HKister, RI

Local PDR

BKGrimes, IE

HBWang, IE

SDEbneter, RI

QAB Reading

JGPartlow, IE

DHWagner, NRR

Team Members

DQAVT Reading

GTAnkrum, IE

WButler, NRR

d

d

N/

Ii AVT:QAB

IE. QAVT'QAB

IE:

AVT:4AB

E DQAVT:QAB:C

VT.D

HBWang: art

EVImbro

JLMilhoan

T nk m

im s

12/ c 2./85

12/ 2/85

12/ov/85

/

85

12/

85

0

.w

-

_

..

-

-

-

.

.

.

7

_<

Docket No.'50-354

Public Service Electric and Gas Company

ATTN: Mr. Robert L. Mitt 1, General Manager

Nuclear Assurance and Regulation

P.O. Box 570, T22A

Newark, New Jersey 07101

.

Dear Mr. Mitti:

SUBJECT: HOPE CREEK UNIT 1 INDEPENDENT DESIGN VERIFICATION PROGRAM (IDVP)

INSPECTION REPORT 50-354/85-54

This letter conveys the results of the inspection activities of the Hope Creek

generating station (HCGS) Unit 1 IDVP final report.

The inspection was

. conducted by NRC's Office of Inspection and Enforcement from September 30

through October 4, 1985 at Sargent and Lundy Engineers' (S&L) office in

Chicago, Illinois.

The NRC inspection team was composed of personnel from

NRC's Office of Inspection and Enforcement and consultants.

The specific objectives of this inspection were to (1) ensure that the

3

conclusions in the report were technically supported, and (2) verify that

the items identified in-inspection report 50-354/85-32 were incorporated in the

program or otherwise satisfactorily resolved.

,

The status of NRC inspection items from Inspection Report 50-354/84-32 dated

May 8-10, and June 4-6, 1985 are given in the attached inspection report.

All

NRC action items identified in the previous report are closed.

j

Sincerely,

Brian K. Grimes, Director

Division of Quality Assurance, Vendor

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosure:

Inspection Report 50-354/85-54

l

cc: w/ enclosure

DISTRIBUTION:

fa

JMTaylor, IE

JLMilhoan, IE

JStrosnider, RI

~NRC'PDR

RHVollmer, IE

EVImbro, IE

HKister, RI

Local PDR

BKGrimes, IE

HBWang, IE

SDEbneter, RI

QAB Reading

JGPartlow, IE

DHWagner, NRR

Team Members

DQA

Reading

GTAnkrum, IE

WButler, NRR

f

N

I

QAB

IE.

AVT QAB'

IE:D AVT: AB

'DQAVT:QAB:C

VT.D

.

HBWang: art

EVImbro

JLMilhoan

T nkyum

i

s

12/ o 2/85

12/ 2/85

12/ov/85

/y/85

0

12/

85

4

.

.

. -

-.

.

.

.

.

.