ML20138D750

From kanterella
Jump to navigation Jump to search
Forwards Corrected FSAR Figure 4.2-1 from 850913 Rev 1 to SNM License Application.Original Figure Contained Typos. Corrected Figure Will Be Incorporated in Next FSAR Amend
ML20138D750
Person / Time
Site: 07003008
Issue date: 10/09/1985
From: Carey J
DUQUESNE LIGHT CO.
To: Jennifer Davis
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
25879, 2NRC-5-138, NUDOCS 8510240402
Download: ML20138D750 (3)


Text

7 ld-30DE

~

'A>?

85 00716 A9:28 M>C-J.5L38 7

1 Telecopy i

era B Id g 2 Suite 210 Pittsburgh, PA 15205 October 9, 1985 T

396-SS United States Nuclear Regulatory Commission Washington, DC 20555 ATTENTION: Mr. John G. Davies, Director Nuclear Material Safety and Safeguards

SUBJECT:

Beaver Valley Power Station - Unit No. 2 Docket No. 50-412 Application for Special Nuclear Material License

REFERENCE:

2NRC-5-130, dated September 13, 1985 Gentlemen:

The above-referenced letter transmitted revision 1 to the Beaver Valley Unit 2 Special Nuclear Material (SNM) License application.

This transmittal included a copy of FSAR Figure 4.2-1.

This figure contains two typographical errors which will be corrected in the next FSAR amendment.

A copy of the corrected figure is attached.

DUQUESNE LIG T COMPANY By W. Carey Vice President KAT/wjs Attachment 4

n, p'\\

cc:

Mr. B. K. Singh, Project Manager (w/a) tmue Mr. G. Walton, NRC Resident Inspector (w/a) vsuc y

OCT 161985 ej I'

uutE?cEn,

x-P l(

e' i[m ?)

hr 8510240402 851009

Qg

.5 f PDR ADOCK 07003008 p%

9 C

pog g,,

25779

8.426 REF

< 16 SPACES AT 0.4 9 6=7. 9 3 6 >

M Nf8U

0. 2 4 5 -->. 4 0.530>

CLUSTER CONTROL

>f0.136 000000000000000 goOOOOOOOOOO g g 0.065 ->-C' O

O gogg gO G O

O

"' '" 'SSE

& O O

AND C0hTROL ROD PITCH o w 4 0.4g6 000 O

O O

cpg goeoeog ggI.488 s

o 0.078 M *6 0 o

A OO O

00 00 O

O Cc o

0 0 O

/A 4-2.976 O O O

/

OO O

O OOO O O O

O O

OO

/

a

/

o O o o

n O

O o: O O '. O O

/

fO O

O 0 0 0

O O

O

/

cuiOE 0900000000000000 0D00000000000000b /Y THlHBM 8 "8*.

06oo0000000000000 000o0000000000000 A

o O O

/O

.0.040 TYP 8 qS. 9.?'a 8 80 0

'O o' 8 l

O O O

o 3 00:

,@ g gO O

O Og l

0 O O O

r' o G=-G,,

[O::q g gO O

=0 Cg N

'% o oO O

O O

O 0x ix5TRusExTATion o

o g&

O o

., g 8 8o o8 SHEATH h

A FUEL ASSEMBLY o o 00000000000000000 0000000000000000Q wl1HOUT ROD b ONTROL CLUSTEP.'ELEMEN -

CLUSTER CONTROL C

FUEL RODS iEQUIRED o-

. 2 W OD = 0 3 ') 4 CLAD THICKNESS = 0.0225 CLLD HATERIAL - ZIPC-4 FIGURE 4.2-1 FUEL ASSEMBLY CROSS SECTION 17 x 17 BEAVER VALLEY POWER STATI0ti-UtilT 2 Fit.'AL S AFETY AtJ ALYSIS REPORT

tn-bh DOCKET NO.

~

CONTROL NO.

b7]f DATE OI' D00.

/d[/)If

/d[/['[NI DATE RCVD.

FCUF_

.PDR TCAP LPDR MI

-ISE REF.

MIUR SAFECUARDS FCTC-OTHER

. DESCRIPTION:

N MW bk R h

  • M a _/_...-

2 4ec - s~ 130 Asc DM3,/fr

/d /d b

NITIAL h

/

/

L'