Requests Withholding Proprietary Rept Re Tubesheet Region Plugging Criterion for Full Depth Hardroll Expanded Tubes, from Public Disclosure (Ref 10CFR2.790)
ML20138D048
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/09/1985
From: Wiesemann R
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML19344C066 List:
References
CAW-85-069, CAW-85-69, NUDOCS 8510230155
Download: ML20138D048 (10)


Text

.

ATTACHMENT T rr October 9, 1985 c CAW-85-069 Mr. Harol 3 R. Denton, Director Office cf Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 APPLICATION FOR WITHHOLDING PROPRIETARY INFORMATION FROM PUBLIC DIS 10SURE

Subject:

Tubesheet Region Plugging Criterion For Full Depth Hardroll Expanded Tubes

Reference:

South Carolina Electric & Gas Company Letter to NRC Dated October 1985

Dear Mr. Denton:

The proprietary material for which withholding is being requested in the referenced letter by South Carolina Electric & Gas Company is further identified in an affidavit signed by the owner of the proprietary information, Westinghouse Electric Corporstion. The affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Comission and addresses with specificity the considerations listed in paragraph (b)(4) of 10CFR Section 2.790 of the Commission's regulations.

The proprietary material for which withholding is being required is of the same technical type as' that proprietary material previously submitted with Application for Withholding CAW-81-79 Accordingly, this letter authorizes the utilization of the accompanying affidavit by South Carolina Electric & Gas Company. '

Correspondence with respect to the proprietary aspects of the application for 4

withholding or the Westinghouse affidavit should reference this letter,

, CAW-85-069, and should be addressed to the tridersigned.

Very truly yours, Ro t - Wiesemann, Manager l Regulatory & Legislative Affairs i

/1sv Enclosures l

cc: E. C. Shomaker, Esq.

l Office of the Executive Legal Director, NRC l

8510230155 851016 PDR ADOCK 05000395 P PDR L

, CAW-81-79 AFFIDAV!T  !

COMMONWEALTH OF PENNSYLVANIA:

ss COUNTY OF ALLEGHENY:

Before me, the undersigned authority, personally appeared Robert A. Wiesemann, who, being by me duly sworn according to law, deposes and says that he is authorized to execute this Affidavit on behalf of Westinghouse Electric Corporation (" Westinghouse") and that the averments of fact set forth in this Affidavit are true and correct to the best of his knowledge, infonnation, and belief:

eA nmA Robert A. Wiesemann, Manager Regulatory and Legislative Affairs Sworn to and subscribed l before me this 2 day of D u r./a 1981.

._/

! f. ' 'it?. .. u /s wsy

. Notary Pub'lic f 1.*
  • CAW-81-79 (1) I am Manager, Regulatory and Legislative Affairs, in the Nuclear Technology Division, of Westinghouse Electric Corporation and as such, I have been specifically delegated the function of reviewing 3 the proprietary information sought to be withheld from public dis- l closure in connection with nuclear power plant licensing or rule-making proceedings, and am authorized to apply for its withholding on behalf of the Westinghouse Water Reactor Divisions.

(2) I am making this , Affidavit in conformance with the provisions of 10CFR Section 2.790 of the Commission's regulations and in con-junction with the Westinghouse application for withholding ac-companying this Affidavit.

I (3) I have personal knowledge of the criteria and procedures utilized by Westinghouse Nuclear Energy Systems in designating information as a trade secret, privileged or as confidential commercial or financial information.

(4) Pursuant to the provisions of paragraph (b)(4) of Section 2.790 of the Commission's regulations, the following is furnished for consideration by the Commission in determining whether the in-formation sought to be withheld from public disclosure should be withheld.

(i) The information sought to be withheld from public disclosure is owned and has been held in confidence by Westinghous'e.

1 f

J t

CAW-81-79 (ii) The information is of a type customarily held in confidence by Westinghouse and not customarily disclosed to the public.

Westinghouse has a rational basis for determining the types of information customarily held in confidence by it and, in that connection, utilize,s a system to determine when and whether to hold certain types of information in confidence.

The application of that system and the substance of that system constitutes Westinghouse policy and provides the rational basis required.

Under that system, information is held in confidence if it falls in one or more of several types, the release of which might result in the loss of an existing or potential com-petitive advantage, as follows:

(a) The information reveals the distinguishing aspects of a process (or component, structure, tool, method, etc.)

where prevention of its use by any of Westinghouse's competitors without license from Westinghouse consti-tutes a competitive economic advantage over other companies.

(b) It consists of supporting data, including test data, relative to a process (or component, structure, tool, method, etc.), the application of which data secures a competitive economic advantage, e.g., by optimization or improved marketability.

l l

l 1

CAW-81-79 (c) Its use by a competitor would reduce his expenditure of resources or improve his ccmpetitive position in the design, manufacture, shipment, installation, assurance of quality, or licensing a similar product.

(d) It reveals cost or price information, production cap-acities, budget levels, or connercial strategies of Westinghouse, its customers or suppliers.

(e) It reveals aspects of past, present, or future West-inghouse or customer funded development plans and pro-grams of potential commercial value to Westinghouse.

(f) It contains patentable ideas, for which patent pro-tection may be desirable.

(g) It is not the property of Westinghouse, but must be treated as proprietary by Westinghouse according to agreements with the owner.

There are sound policy reasons behind the Westinghouse system which include the following:

(a) The use of such information by Westinghouse gives Westinghouse a corpetitive advantage over its com-petitors. It is, therefore, withheld from disclosure to protect the Westinghouse competitive position!

l l

l l

I

CAW-81-79 l

I (b) It is information which is marketable in many ways. f The extent to which such infomation is available to '

competitors diminishes the Westinghouse ability to  !

sell products and services involving the use of the infomation.  ;

I i

(c) Use by our competitor would put Westinghouse at a

[

competitive disadvantage by reducing his expenditure

  • of resources at our expense.

(d) Each component of proprietary infonnation pertinent to a particular competitive advantage is potentially  !

as valuable as the total competitive advantage. If l competitors acquire components of proprietary infor- l mation, any one component may be the key to the entire puzzle, thereby depriving Westinghouse of a competitive !

advantage. I (e) Unrestricted disclosure would jeopardize the position i of prominence of Westinghouse in the world market, and thereby give a market advantage to the competition ,

in those countries.  !

L (f) The Westinghouse capacity to invest corporate assets -

in research and development depends upon the success  !

in obtaining and maintaining a competitive advantage.  !

I

[

l [

i e

r CAW-81-79  !

i (iii) The information is being transmitted to the Comission in confidence and, under the provisions of 10CFR Section 2.790, it is to be received in confidence by the Comission. .

(iv) The information sought to be protected is not available in

  • i public sources or available information has not been pre-

{

viously employed in tne same original manner or method to '

the best of our knowledge and belief.  :

i (v) The proprietary information sought to be withheld in this submittal is that which is appropriately marked in " Steam  ;

Generator Tube Plugging Margin Analysis" for the Virgil C.

Sumer Nuclear Power Plant Unit No.1. WCAP-9912. Revi-sion 2 (Proprietary) being transmitted by South Carolina  ;

Electric and Gas Company letter Application for Withholding Proprietary Information from Public Disclosure Nichols to  !

Denton, November 1981. The proprietary infomation as sub- t mitted for South Carolina Electric and Gas Company, Virgil C.

Sumer Nuclear Station use is expected to be applicable in othar licensee and applicant submittals in response to cer- "

i tain NRC requirements for justification of the steam i generator tube plugging margin.

This infomation is part of that which will enable Westing-house to:  ;

(a) Provide documentation of the analyses, method and test-ing for determining plugging margin. t P

k CAW-81-79 1

I (b) Establish the minimum wall thickness in compliance with  !

Regulatory Guide 1.121.  !

(c) Establish the stress limits versus thinning of the remaining tube wall.

(d) Establish the maximum allowable leakage in support of

. the leak-before-break criteria.

(e) Assist the customer to obtain NRC approval.

i Further this information has substantial commercial value as follows: i (a) Westinghouse plans to sell similar information to its customers for purposes of meeting NRC requirements for licensing documentation.

i i

(b) Westinghouse can sell support and defense of the tech-nology to its customers in the licensing process.

Public disclosure of this infonnation is likely to cause f

substantial harm to the competitive position of Westinghouse  !

because it would enhance the ability of competitors to pro- -

vide similar analytical documentation and licensing defense services for commercial power reactors without commensur' ate expenses. Also, public disclosure of the information would enable others to use the information to meet NRC require-ments for licensing documentation without purchasing the -

right to use the information. '

I i

i

CAW-81-79 The development of the technology described in part by the information is the result of applying the results of many years of experience in an intensive Westinghouse effort and the expenditure of a considerable sum of money.

In order for competitors of Westinghouse to duplicate this information, similar technical programs would have to be performed and a significant manpower effort, having the requisite talent and experience, would have to be expended for system d'esign software development.

~

Further the deponent sayeth not.

l l

I l

l

ATTACHMENT IV No Significant Hazards Determination

1. Does the proposed amendment invol"e a significant increase in the probability or consequences of an accident ,previously evaluated?

No.

The supporting P* evaluation demonstrates that the presence of the tubesheet will complement tube integrity in that region by precluding tube deformation beyond its initial outside diameter. The resistance to both tube rupture and tube collapse behavior is strengthened by the presence of the tubesheet in that region. Furthermore, the existing Technical Specification leakage rate requirements remain in place in the unlikely event leakage from this region does occur.

2. Does the proposed amendment create the possibility of a new cr different kind of accident from any accident previously evaluated?

No.

The enclosed supporting evaluation demonstrates that following the P*

criteria minimizes the potential for any possible tubesheet area tube indications that may exist from creating any type of accident condition.

3. Does the proposed amendment involve a significant reduction in a margin of safety?

No.

As demonstrated in the attached evaluation, integrity of ~the tube bundle under both normal and postulated accident conditions will continue to be maintained. Current Technical Specification leakage rate limitations will continue to be met; therefore, any leakages will be limited to ensure safety margins are preserved.

In addition to the above supporting ~ conclusions, 'the proposed change to allow for repair of tubes according to an NRC approved sleeving method is considered to have a no significant hazards determination. The change will not involve a s ignificant increase in the probability or consequences of a new or previously evaluated accident because only an NRC approved sleeving method will be utilized for tube repair. This approved method will allow the plant to function in a manner which is consistent with normal and any postulated accident conditions.

The proposed change does not involve a significant reduction in a margin of safety because it only allows SCE&G-the option of utilizing another acceptable method of tube repair. Any repair method will have to be demonstrated to the Staff to be a satisfactory alternative to tube plugging.