ENCLOSURE 1 NOTICE OF' VIOLATION Duke Power Company Docket No. 50-369 McGuire Unit 1 License No. NPF-9 The following violation was identified during an inspection conducted on December 21, 1985 - January 27, 1986. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Technical Specification 6.8.1 requires that current written approved procedures be established, implemented, and maintained covering the activities referenced in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978 which include recovery from Reactor Trip. Station Directive 3.1.10 requires that malfunctions or failures in equipment or components subject to Technical Specification Limiting Condition for Operation require-ments be evaluated and corrected as required prior to restart. It further requires in Enclosure 4.1 that a review of safety systems be performed to identify other than expected performance, and also that abnormal behavior be evaluated and resolved prior to restart.

Contrary to the above, the post trip review preceding Unit I reactor startup of November 2,1985, was deficient in that it did not evaluate and resolve the abnormal response noted on Pressurizer !! eater Bank A.

This is a Severity Level IV Violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: (1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.