Text

9

o

OCT 111985

In Reply Refer To:

Docket 50-298/85-18

Nebraska Public Power District

ATTN: J. M. Pilant, Manager, Technical ~

Staff-Nuclear Power Group

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

This refers to the inspection conducted by Mr. D. DuBois of this office and

one consultant during the period June 1-July 31,1985, of activities

authorized by NRC Operating License DPR-46 for Cooper Nuclear Station, and to

the discussion of our findings with Mr. P. Thomason and other members of your

staff at the conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

monthly surveillance and maintenance observations, licensee action on previous

inspection findings, survey of licensee's response to selected safety issues,

IE information notice, notification of unusual event, safety-related HFA relay

replacement, design changes and modifications, facility modifications, tests

and experiments program, startup testing - new or modified systems,

surveillance-containment local leak rate testing - type B & C tests,

preoperational test procedure review-recirculation system flow control test,

plant procedures, licensed operator training, inservice inspection- reactor

coolant system hydrostatic test, refueling, and spent fuel pool activities.

Within these areas, the inspection consisted of selective examination of

procedures and representative records, interviews with personnel, and

observations by the inspectors. These findings are documented in the enclosed

inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 2 of the enclosed report.

1

l' ~

l RI RPfr/ RPB

f DDuBois/sn JP EHJohnson

(0/ 3 /85 'g.Jaydon

/g/85 \o/p/85

8510220460 051011

DR ADOCK 0500 8 hi

t

L

. . . _ . - . __ - . . _ .

4

'- - r

c

t

.- Nebraska Public Power District -2-

4

Should you have any questions concerning this inspection, we wil1~ be pleased

to' discuss them with you.
,  : Sincerely,  !

'

4 Original signed By

'

l

-

E. H. Johnson

'

L E.H. Johnson, Chief

- Reactor Projects' Branch

'

Enclosure: .. .

' Appendix .NRC Inspection Report '

,

.50-298/85-18.

n -

'

'cc w/ enclosure:-

.. Paul V. Thomason, Division Manager 1

,

. .of;. Nuclear Operations; '

] . , Cooper Nuclear. Station

.P. O. Box'98

Brownv111e, Nebraska '68321

f- ,

Nebraska Radiati.on Control Program Director ,

-

Kansas Radiation Control Program Director

bec to DMB (IE01) '.

.

bec distrib. by RIV:

! *RPB' . R. P. Denise, DRSP  ;

  • Resident Inspector R.'D. Martin, RA~
*Section Chief (RPB/A) *D. Weiss, LFMB (AR-2015)

?

'*EP&PSB

  • MIS System

'

  • RIV File
  • RSTS Operator

^

  • w/766

.

4

f

4

,

.

t

.___"_.-____._ _ _ . . - _ - . _._m.-___----_----u.i-.-. __ . . - - - - - - - - - - -. - ------------------'----------A - - - -