ML20138C523

From kanterella
Jump to navigation Jump to search
Requests Encl Approved Ref Matl by 860414 for Administration of Replacement & Requalification Written,Oral & Simulator Operator & Senior Operator Licensing Exams Scheduled for Wk of 860616
ML20138C523
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/25/1986
From: Verrelli D
NRC
To: White S
TENNESSEE VALLEY AUTHORITY
References
NUDOCS 8604020520
Download: ML20138C523 (5)


Text

hlMA) hJT 5f

&- %(,4 March 25, 1986 Tennessee Valley Authority ATTN: Mr. S. A. White Manager of Nuclear Power 6N 38A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Gentlemen:

SUBJECT:

OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. A. R. Champion, Nuclear Training and Mr. K. E. Brockman, Operator Licensing Section, arrangements were made for administration of the replacement and requalification examinations at the Brown's Ferry Nuclear Plant.

The written, and plant oral examinations are scheduled for the week of June 16-18, 1986. The simulator examinations are scheduled for June 17-19, 1986, at the Browns Ferry simulator. The requalification examinations are scheduled for June 16-20, 1986 In order for us to meet the above schedule, it will be necessary for the facility to furnish the selected reference material from the approved list in Enclosure 1 by April 14, 1986. Any delay in receiving this material will result in a delay in administration of the examinations. Our examinations are scheduled far in advance with considerable planning to utilize our present limited examiner-manpower and to meet the_ examination date requested by the various facilities. Therefore, missing the April 14,1986 deadline, even by a few days, will likely result in a long delay, since it would not be possible to reschedule examinations at other facilities. Mr. Champion has been advised of our selected reference material requirements, the number of reference material sets that are required, and the examiners' names and addresses where each set is to be mailed.

This rgest for information was approved by the Office of Management and Budget' under e blinket- Clearance Number 3150-0101 which expires on June 30, 1986.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management, Room 3208, New Executive Office Building, Washington, DC 20503.

The facility management is responsible for providing adequate space and facilities in- order to properly conduct the written examinations. Enclosure 2, "Administra-tion of Operator Licensing Written Examinations," describes our requirements for conducting these examinations. Mr. Champion has also been informed of these requirements.

p /2)

. Tennessee Valley Authority 2 March 25, 1986 All operator and senior license applications s'hould be submitted on Form NRC-398 at least 60 days prior to the first examination date so that we will be able to review the training and experience of the candidates, process the medical certi-fications, and prepare final examiner assignments after candidate eligibility has been determined.

Thank you for your consideration in this matter. If you have any questions regarding the examination procedures and requirements, please contact Mr. Bruce A. Wilson, 404/331-5542, or Mr. K. E. Brockman, 404/331-2694.

Sincerely, t

(Original signed by DMVerrelli)

David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects-

Enclosures:

1. Reference Material Requiremente
2. " Administration of Operator Licensing Written Examinations" cc w/encls:

R. J. Johnson, Training Supervisor R. L. Lewis, Plant Manager bec w/encls:

Senior Resident Inspector Document Control Desk State of Tennessee PRShaw:sh

.KBrockman h M BAWilso'n h

CAJu an DMVe relli 3/ /86 3/\3/86 3/70/86 3/gl 86 3/ /86

?v..- - - - , - , - ..._% . . - - . . - , _ _ _ , - , , _ _ , m

ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS

1. Procedure Index (alphabetical by subject)
2. All administrative procedures (as applicable to reactor operation 'or safety) 3.- All integrated plant procedures (normal or general operating procedures)
4. Emergency procedures (emergency instructions, abnormal or special procedures)
5. Standing orders (important orders that are safety-related and may supersede the regular procedures)
6. Fuel-handling and core-loading procedures (initial core-loading procedures whenappropriate)
7. Annunciator procedures (alann procedures, including set points)
8. Radiation protection manual (radiation control manual.or procedures)
9. Emergency plan implementing procedures
10. Technical Specifications
11. Lesson plans (training manuals, plant orientation manual, system descriptions, reactor theory, thermodynamics, etc.) -
12. System operating procedures
13. Piping and instrumentation diagrams, electrical single-line diagrams, or flow diagrams
14. Technical Data Book and/or plant curve information as used by operators
15. Any other material the examiner feels is necessary to adequately prepare a written examination, such as. reactor traces of significant plant evolutions
16. Questions and answers that licensee has prepared (volun~tary by licensee) 1 l

Enclosure 1 2 March 25, 1986

17. Malfunction and initial condition material for simulator (if applicable)

All of the above reference material should be approved, final issues . and should be so marked. Uncontrolled, preliminary, or other such issues will not be acceptable except for cold-license examinations. If a cold-license plant has not finalized some of the material, the chief examiner is respon-sible for ensuring that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination. All procedures and reference material should be bound or in the fonn used by the control room operators,

~ ~

with appropriate indexes or tables of contents so that they can be used efficiently.

E_NCLOSURE 2 ADMINISTRATION OF OPERATOR LICENSING FRITTEN EXAMINATIONS NRC Requirements:

1. A single room should be provided by the facility for completing the written examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility / contractor

' ~

personnel for the duration of the written examination.- If necessary, the

~ ~ facility should make arrangements' for the'use of a' suitable room at a 1ocal

~

school, motel, or other building. Obtaining this room is the responsibi?ity of the licensee.

2. Minimum spacing is one candidate per 5 X 21 ft., minimum size table with 3-feet spacing between tables. No wall charts, models, and/or other training materials may be present in the examining room.
3. Suitable arrangements are to be made by the facility for the candidates to have lunch, coffee, etc. These arrangements will be reviewed by the examiner and/or proctor.
4. The facility shall arrange to review the examination questions and answer key. This review will begin after the completion of the written examination and written consnents will normally be presented to the Chief Examiner prior to his departure from the site.
5. The facility will provide sealed pads ~ of paper for each candidate's use in completing the examination. All reference material needed to complete the examination will be furnished by the examiner. Candidates may bring calcu-lators but no other equipment or reference material to the examination room.

l

6. Only black ink or dark pencil should be used for writing answers to questions.
7. Candidates will be-asked to provide positive identification at the start of the written examination.

l

-..__.._..__,----,,.J