Deficiency Rept DER 85-28 Re C-E Instrument Rack Conduit Installation.Initially Reported on 850821.Final Rept Delayed Until 851101 Due to Extent of Investigation & Evaluation
ML20138C520
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/08/1985
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Kirsch D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-33679-TDS, DER-85-28, NUDOCS 8510220452
Download: ML20138C520 (2)


Text

,,

o *

/

Arizona Nuclear Power Project P O BOX 52034 e PHOf NIX ARIZONA 85072-2034 October 0, 1985 ANPP-33679-TDS/TPS U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects

Subject:

Time Extension for Report - DER 85-23 A 50.55(e) Potentially Reportable Deficiency Relation to CE Instrument Rack Conduit Installation File: 85-019-026; D.4.33.2

Reference:

(A) Telephone conversation between R. C. Sorensen and T..Siegfried on August 21, 1985 (B) ANPP-33573, dated September 18, 1985 (Interim Report)

Dear Sir:

The NRC was notified'of a potentially reportable deficiency in Reference (A),

and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by October 11, 1985.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 1,1985, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, n JW A fl0lD3's -

CRL G LL DI:l #d Sl DOSQ E. E. Van Brunt, Jr.

Executive Vice President Project Director l

Gull EEVB/TPS/1df 03SI333'd E

l I

i. 8510220452 851008 ADOCK 05000528 PDR 6 PDR b-L

\

16'-27

  • a, ,

ANPP-33679-TDS/TPS October 8, 1985 Mr. D. F. Kirsh DER 85-28 Page Two cc: Richard DeYoung, Director Office of Inspe: tion and Enforcement U. S. Nuclear Regulatory Commission * <

Washington, D. C. 20555 J. G. Haynes D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza T. D. Shriver D. E. Fowler C. N. Russo J. R. Bynum s J. M. Allen D. Canady A. C. Cehr G. A. Hierzer W. G. Bingham R. L. Patterson B. W. Welcher ,

H. D. Foster D. R. Fester D. R. Hawkinson R. P. Zimmerman l M. L. Clyde B. T. Parker J. Provasoli D. N. Stover ,

J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Power Operations 1100 Circle 75. Parkway, Suite 1509 j Atlanta, Georgia 30339 4