Text
h/b4l
'
.
1
MAR 2 71986
Tennessee Valley Authority
ATTN:
Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
REPORT NOS. 50-327/86-04 AND 50-328/86-04
On January 21-30 and February 12-13, 1986, NRC inspected activities authorized by
NRC Operating License Nos. DPR-77 and DPR-79 for your Sequoyah facility.
As a
result of this inspection, significant failures to comply with NRC regulatory
requirements were identified and accordingly, an Enforcement Conference to
discuss these matters was conducted telephonically on March 14, 1986.
Areas examined during the inspection are identified in the report.
Within these
areas, the inspection consisted of selective examination of procedures and
representative records, interviews with personnel, and observations of activities
in progress.
In accordance with the " General Statement of Policy and Procedure for NRC
Enforcement Actions," 16 CFR.Part 2, Appendix C (1985), the violation described
.in Item 1 of the enclosed Notice has been classified as a Severity Level III
violation.
Normally, a civil penalty is considered for a Severity Level III
violation.
However, I have decided that a civil penalty will not be proposed in
this case because the State of South Carolina has taken enforcement action.
You are required to. respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence.
After reviewing your response to this
Notice, including your proposed corrective actions, - the NRC will determine
whether further NRC enforcement action is necessary to ensure compliance with
NRC regulatory requirements.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC's Public Document Room.
'
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
8604020494 860327
ADOCM 05000327'
O
I
s.6 oI
.
--
.
Tennessee Valley Authority
2'
,
Should you have any questions concerning this letter, please contact us.
Sincerely,
John A. Olshinski, Deputy Regional
Adminstrator for TVA
Enclosures:
1.
2.
Inspection Report No. 50-327/86-04
and 50-328/86-04
cc w/encls:
H. L. Abei-*ombie, Sequoyah Nuclear Plant
Site Dir, tor
P. R. Wallace, Plant Manager
K. W. Whitt, Chief, Nuclear
-Safety Review Staff
D. L.' Williams, Jr. , Supervisor
Licensing Section
G. B. Kirk, Compliance Staff Supervisor
J. E. Wills, Project Engineer
bcc w/encis:
J. N. Grace
.
H. R. Denton, NRR
H. L. Thompson, NRR
J. M. Taylor, IE
B. B. Hayes,.OI
NRC Resident Inspector
Document Control Desk
State of Tennessee
RI
- 3 p 86
._
I
RII
RII
RII
R
RII
RII
RI
/
b
\\
S eise
DVerrelli
G'Jen ins
DCollinhpStohr
RWedpington
C osey
3//y/86
3/g/86
3/u/86
3/2 786
3/At/86
3/ /86
3/gf/86
. -
==.
_ . .
-