ML20138C351
| ML20138C351 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 03/26/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20138C354 | List: |
| References | |
| GL-85-18, NUDOCS 8604020469 | |
| Download: ML20138C351 (1) | |
Text
w' L(dtna o
I bbrch 26, 1986 Georgia Power Company
[TN: Mr. R. J. Kelly Executive Vice President P. O. Box 4545 Atlanta, GA 30302 Gentlemen:
SUBJECT:
PLANT V0GTLE INITIAL LICENSING EXAMINATIONS As a followup to the meeting conducted at the Region II office on March 4,1986, this letter transmits the Meeting Sumary as recorded by our personnel.
The agenda items of this meeting addressed:
(1) Construction Schedule and Fuel Load Date; (2) Training Schedule for Licensed Operator Candidates; (3) Status of Reference Material for Examination Preparation; and (4) Contingency Plans for Examination Implementation.
Details of the subjects discussed are enclosed in the Meeting Summary.
It is our opinion that this meeting was very beneficial and that the examination process for the initial cadre of licensed operators at the Vogtle Plant will be much improved due to the information shared.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosure will be placed in the NRC's Public Document Room.
Should you have any questions regarding this matter, we will be pleased to discuss them.
Sincerely, (Original signed by VLBrownlee)
Virgil L. Brownlee, Chief Reactor Projects Branch 3 Division of Reactor Projects Enclosure Meeting Summary cc w/ encl:
vs. Bockhold, General Manager-0perations
/ Rushton, Training Supervisor bec w/ encl:
8604020469 060324 Dpcument Control Desk PDR ADOCK 05000424 MRC Res'. dent Inspactor A
PDR State of Georgia B. A. Wilson, NRC R)j m
I RII RI
/
RII g}&
6 VLBrownlee PRSh w 8 Wilson CAJulian 03/j /86 03/$/86 03/p/86 03/S//86 g