Notice of Violation from Insp on 850909-13
ML20138C349
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 10/03/1985
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20138C338 List:
References
50-321-85-26, NUDOCS 8510220415
Download: ML20138C349 (2)


Text

. _.

ENCLOSURE 1 NOTICE OF VIOLATION Georgia Power Company Docket No. 50-321 Ha.tch License No. DPR-57 The following violation was identified during an inspection conducted on September 9 - 13, 1985.

The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

[

10 CFR 50, Appendix B, Criterion X, as implemented by paragraph 17.2.10 of the FSAR, requires, in part, that a program for inspection of activities affecting quality be established and executed to verify conformance with documented instructions, procedures and drawings.

Implementing procedures 40AC-QCX01-0, R0,. paragraph 5.3.2,- and 50AC-MNT01-0, R2, paragraph 8.5.12, l

require that work not proceed beyond QC inspection hold points.

Paragraph 8.6.1 of procedure 40AC-QCX01-0 requires that completed inspections be documented in applicable procedures, inspection plans, and QC hold point i

sheets. Paragraph 8.5.2 of procedure 40AC-QCX-01-0 requires that QC perform inspections in accordance with approved procedures.

Implementing procedure 521T-MNT-001-0, R0, requires that the minimum s'ocket weld leg size be lit where t is the nominal pipe thickness, f

Contrary to the above, on September ~ 9 - 13, 1985, the program for inspection of activities affecting quality were not properly executed in that:

1.

For Analog Transmitter Trip System (ATTS) ASME Class 2 welds F6709 and F6718, fitup inspection. hold points were not signed off prior to l

q welding the root passes.

2.

For ATTS ASME Class 2 welds F6711, F6715, F6713, F6709, F6710, F6716, F6718 and F6713, the licensee's inspector was not aware of the lit minimum ~ socket weld leg size required by procedure and inspected the welds to different criteria (minimum leg size j

equal to height of fitting shoulder).

l This is a Severity Level V violation (Supplement I).

i 8510220415 851003 DR ADOCK O y1 I'

i-

.~,

. -.. -.. -. -., _.. _.. -. ~.. _.. _ -,... _, - -

Georgia Power Company 2

Docket No. 50-321 Hatch License No. DPR-57 1

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of. this Notice, a written. statement or explanation in reply, including: '(1) admission or denial-of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.