C.
AVERAGE DAILY UNIT POWER _ LEVEL DOCKET NO.
050-454 UNIT: Syron One DATE:
10/08/85 COMPILED BY:
J.E. Langan TELEPHONE:
(615)234-5441 x2825 MONTH: September let through September 15th DAY AVERAGE DAILY POWER LEVEL (Nlde-Net) 1.
26 2.
376 3.
487 4.
877 5.
930 6.
952 7.
727 8.
952 1
9.
917 j
10.
587 11.
386 12.
432 13.
432 14.
710
- 15. -
941 INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.)
In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
j h
8512120490 850930 PDR ADOCK 05000454 gI g
R PDR
\\
ccococcoocccooooocecocces.
Report Period September 1-September 15, 1985 IMIT SHUTDOWMS/ REDUCTIONS o
BYRON
.O emeeeeeeeeeeeeeeeeeeee....
No.
Date Type Hours Reason Method LER Number System Component Cause & Corrective Action to Prevent Recurrence
- 26) 9/1/85 F
15.4 H*
1 Continued tech. spec. required shut down as a 2
result of inadequate N.D.E. records of safety injection valve weld.
- H : Tech. Spec. required shutdown 2
coereenceeensee 3
Summary Commercial Operations began 0000 September 16. 1985.
r.eermanceeemene TYPE Reason Method System r. Component F-Forced A-Bquip Failure F-Admin 1-Manual Exhibit P & H S-Sched B-h int oc Test G-Oper Error 2-Manual Scrase Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Ehtry Sheet E-Operator Training 5-Reduced Emad Licensee Event Report
& License Exasmination 9-Other (I2R) File (NUREG-0161)
(0625M)
UNIQUE REPORTING REQUIREMENTS s
1.
Safety / Relief valve operations for Unit.One.
VALVES NO & TYPE FLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVEhT None i
l l
l l
t 4
4 l
4 i
c.-,,. -,, - -
,,-.,,.--,e
,-.. -,,,nn.n,-
,n-,
F.
LICENSEE EVENT REPOR7S The following is a tabular summary of.sil licensee event reports for Byron Nuclear Power Station, Unit one, submitted during the reporting period, September 1 through September 15. 1985. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Licenses tvent Report Number Da_t_e Title of Occurrence 84-076-00 9-03-85 Auto Start of OA VC M/U Fan.
85-078-00 9-04-85 Reactor Trip.
85-079-00 9-04-85 Failure to Perform AFD Verification following Alarm Restoration.
i 85-080-00 9-10-85 Incorrect calorimetric Calculation Resulting in i
Exceeding 100%,RTP.
I 85-082-00 9-10-85 Failure to obtain and Analyze Samples Required by Technical Specifications.
i I
A
_. #4
--__Am M
4_.
4 a_.A--
2-+-1 A
A-re e--
-s-.I~-
-M S'
e g e
BYRON NUCLEAR POWER STATION WIT 1 MONTIEY PERFORMANCE REPORT s
a COM ONWEALTH EDISON COMPANY NRC DOCKET N3. 050-454 LICENSE NO. NPF-37 4
'l J
l l
l
[
(
l
Monthly R: port for Byron Unit 1 A.
Sumnary of operating Experience for Unit 1 Byron Unit 1 began comnercial operation at 0000 on September 16, 1985. Currently the Unit is restricted to 92% power due to excessive Steam Generator moisture carryover.
The Unit began this reporting period returning to 92% power after an administrative reduction due to a Solid State Protection System switch failure. The Unit re:nained at power until Sept. 22nd, when power was reduced to approximately 50% in order to facilitate repairs on a Feedwater Pump. The Unit was returned to 92% power and remained so until Sept. 26th. On the 26th the Unit was administrative 1y shut down in order to effect repairs on the Containment Floor Drain Sump level instrumentation. The Unit was return to power en the 29th and remained at power through the end of the reporting period.
i I
O
OPERAT!b DATAMPORT 8.
DOCKET NO.:
050-454 UNITE Byron One DATE: 10/04/85 COMPILED BY:
J.E. Langan TELEPHONE:
(815)234-5441 x2825 OPERATING STATUS 1.
Reporting Period:
September 16 through September 30, 1985. Gross Hours:
360 2.
Currently Authorised Power Level ( Wt): 3411 Design Electrical Rating: 1175 (We-gross )
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DETERMINED 3.
Power Level to Which Restricted (If Any): 1075 (MWe-gross) 4.
Reasons for Restrictica (If Any): Excessive steam generator moisture carryover THIS MONTH YR TO DATE CUMULATIVE j
5.
Number of Hours Reactor was Critical 360.0 360.0 360.0 i
6.
Reactor Reserve Shutdown Hours 0
0 0
t 7.
Hours Generator on Line 291.1 291.1 291.1 8.
Unit Reserve Shutdown Hours 0
0 0
9.
Gross Thermal Energy Generated (MWH) 774891 774891 774891
]
- 10. Cross Elec. Energy Generated (MWH) 251688 251688 251688
- 11. Net Elec. Energy Generated (HWH) 234225 234225 234225
- 12. Reactor Service Factor 100 100 100
- 13. Reactor Availability Factor 100 100 100
- 14. Unit Service Factor 80.9 80.9 80.9
- 15. Unit Availability Factor 80.9 80.9 80.9
- 16. Unit Capacity Factor (Using MDC)
N/A N/A N/A
- 17. Unit Capacity Factor (Using Design MWe) 58.1 58.1 58.1
- 18. Unit Forced Outage Rate 14.0 14.0 14.0
- 19. Shutdowns Scheduled over Next 6 Months (Surveillance outage, Oct. 25, 1965, 6 weeks)
- 20. If Shutdown at End of Report Period, Estimated Date of Startup N/A
- 21. Units in Test Status (Prior to Commercial Operation):
None FORECAST ACHIEVED Initial Criticality 1-25-85 2-2-85 Initial Electricity
__3-1-85 Commercial Operation 9-16-85 2
C.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NOo? 050-454 UNIT Byron One DATU: 10/08/85 COMPILED BY:
J.E. Langan TELEPHONE:
(815)234-5441 x2825 MONTH: September 16th through September 30th,1985 DAY AVERAGE DAILY POWER LEVEL (MNo-Net) 16, 931 17.
980 18.
977 19.
966 20.
966 21, 947 22.
553 23.
954 24.
865 25, 335 26.
0 27.
0 2 8. __
0 29.
429 30.
937 INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting rnonth. Note that when maximum dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 100% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
Report Period September 16-September 30, 1985 LMIT SHUTD06edS/REDUCTINS ccccooococococo cecceaecco" BYRON
............. es.........
No.
Date Type Hours Reason Method _ LER Ihsaber _ System Pmpanent Cause & Corrective Action to Prevent Recurrence 1) 9/16/85 P
0.0 D
5 Reduced load due to the failure of Train B Solid State Protection System Logic Switch "A",
position 17.
t) 9/22/85 F
0.0 A
5 Reduced load to allow repairs on IC Feedwater Pianp.
1) 9/26/85 F
68.9 D 1
Tech Spec required shutdown due to a deviation in allowable tolerance of containment floor drain sump water level indication.
W Tech. Spec. required shutdown i.2eceaneceanee.
Summary
('n==*rcial Operations began September 16, 1985.
,eeeee:eeeeeeen TPE Reason Method System & Conqponent
' Forced A-Equip Failure F-A& min 1-Manual Exhibit F & H
,-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Dstry Sheet E-Operator Training 5-Reduced Load Licensee Event Report
& License Enmination 9-Other (LER) File (NUREG-0161) 9625M)
Er UNIQUE REPORTING nmJIRDENTS 1.
Safety / Relief valve operations for Unit One.
VALVES NO & TYPE Pf. ANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVDTT None 1
l 1
W l
l i.
l
F.
LICDiSEE EVENT REPORTS
[he following is a tabular summary of all licensee event reports for B Nuclear Power Station, Unit One, submitted during the reporting period, September 16 through September 30, 1985. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Licensee Event Report Number Date Title of Occurrence 45-63-01 9-19-85 2A D/G Faulty RPM Reading 85-081-01 9-03-85 Closure of 1RH8716A&B during Surveillance.
85-083-00 9-19-85 RCS Inventory Surveillance.
85-085-00 g-24-85 ASME inspection not performed on 1518811A&B, 85-086-00 9-28-85 MSIV Inoperable Beyond Tech spec LCO.
85-088-00 9-30-85 Auto Start of vc M/U Fan.
w
j) f-w l
Octdber 8,1985 LTA:
BYRON 85-1333 File:
2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Comunission Nashington, D.C.
20555 4
ATTN:
Document Control Desk Gentlemen:
On September 16, 1985, Byron Unit One completed its startup program successfully and has been made available for regular production of electricity.
Enclosed for your information are two performance Reports, the first covering Byron Nuclear Power Station for the period September 1 through september 15, 1985, and the second covering the period september 16 through September 30, 1985.
Please note in Section B item 9, of the first report the final " YEAR TO DATE" and " CUMULATIVE" numbers have been adjusted to reflect calculations using the finalized reactor coolant average temperature.
Very truly yours,
"' 2 s
Y jj(/j 3
/:/
N19$% ogGl? _
/I R. E. Querio
).}
..- /
Station Manager Byron Nuclear Power Station gica y
,,y CC T
REQ /JEL/bg Enclosures
],
cc:
J.G. Kappler, NRC, Region III NRC Resident Inspector Byron Gary Neight, Ill. Dept. of Nuclear Safety D.P. Galle, CJCo T. J. Maiman D.L. Farrar, CBCo G. R. Benson, Revenue Requirements:
INPO Recorda Center Thermal Group, Tech Staff Byron Station js.clearGroup,TechStaffByronStation gif,;f Nu f
Lan,.a t
,,.--.,,c
i
}
BYRON NUCLEAR POWER STATION t
i UNIT 1 i
i MONTHLY PERFOftHANCE REPORT l
I I
i C00040MEALTH EDISON COMPANY
?
e i
NIIC D000tT NO. 050-454 l
I LICENSE NO. NPF-37 i,
l I
e
1.
Monthly Report for Byren Unit 1 A.
Summary of Operating Experience for Unit 1 Byron Unit One successfully ccepleted its Startup Program and began producing power connercially on September 16, 1985.
The Unit began this reporting period in a required shutdown continued from the last reporting period.
The Unit was returned to power on September 1, and remained so through the end of the reporting period. During this period the unit was at various power levels to support the remaining startup tests.
S
B.
OPERATING DA_TA REPORT DOCKET NO.:
050-454 UNIT Byron One DATE: 10/08/85 COMPILED SY:
J.E. Langen TELEPHONE:
(815)234-5441 x2825 OPERATING STATUS 1.
Reporting Period: September 1,through September 15, 1985. Gross Hours: 360 2
2.
Currently Authorised Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (NWa-net): NOT DETERMINED 3.
Power Level to which Restricted (If Any): 1075 (MWe-gross) i 4.
Reasons for Restriction (If Any): Excessive 5/G Moisture Carryover I
THIS HONTH YR TO DATE CtMULATIVE 5.
Number of Hours Reactor was Critical 348.0 3723.4 3723.4 6.
Reactor Reserve Shutdown Hours 0
0 0
7.
Hours Generator on Line 344.6 3100.4 3100.4 8.
Unit Reserve Shutdown Hours 0
0 0
9.
Groes Thermal Energy Generated (MWH) 800289 6466223 6466223
- 10. Cross Elec. Energy Generated (MWH) 251844 2029301 2029301
- 11. Not Elec. Energy Generated (MWH) 233714 1820630 1820630
- 12. Reactor Service Factor 0
0 0
- 13. Reactor Availability Factor 0
0 0
- 14. Unit Service Factor 0
0 0
- 15. Unit Availability Factor 0
0 0
- 16. Unit Capecity Factor (Using MDC) 0 0
0
- 17. Unit capacity Factor (Using Design MWe) 0 0
0
- 18. Unit Forced Outage Rate 0
0 0
l
- 19. Shutdowns Scheduled over Next 6 Months (Surveillance outage, Oct. 25, 1985, 6 weeks)
)
- 20. If Shutdown a' End of Report Period, Estimated Date of Startup: N/A
- 21. Units in Test Status (Prior to Commercial Operation):
None FCRECAST ACHIEVED Initia 4'eiticality 1-25-85 1-2-85 Initia
- e i Mtricity
},)-6.$..
{
Commercia. Operation 5 -:,6-85 i
l
, _,.