_ __ __ _

ENCLOSURE I NOTICE OF VIOLATION Tennessee Valley Authority Docket Nos. 50-327 and 50-328 Sequoyah License Nos. DPR-77 and DPR-79 The following violation was identified during an inspection conducted on February 24-28, 1986. The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Appendix B, Criterion V of 10 CFR 50, requires that activities affecting quality shall be prescribed by documented instructions and procedures, and shall l>e accomplished in accordance with these -instructions and procedures.

TVA Sequoyah Nuclear Plant 79-02 Anchor Bolt inspection procedure requires the correct installation of self-drilling concrete anchor bolts in safety-related systems per General Construction Specification G-32. Para-graph 3.2.5 of Specification G-32 states that the installers are to be instructed to tighten the bolts between 1/8 and 1/4 turn after the bolt head comes into contact with the attachment or baseplate.

Contrary to the above, between February 24-28, 1986, activities affecting quality had not been accomplished in accordance with documented instructions and procedures in that the licensee's QC inspectors failed to detect the anchor bolt deficiencies for nine pipe supports and one pump support platform baseplate during their inspections. The deficiencies were the gaps between

the bolt-heads and the baseplates.

This is a Severity Level IV violation (Supplement I).

Pursuant to 10 CFR 2.201, you are -required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including: -(1) admission or denial of the alleged violations; (2) the reasons for the violations if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to ayoid further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.