Text
ocaer c:?:acy Gee g.a t
32J 3 ec+e-i Avsc.e ar a Gecrya 2C308
- d ec Oco (C4 325 63M
.!a ag Aceress am: Cere 3cm 45L sr.au ce: ;:a ns:2 g- -- r: - 7 c;-
the sourtNm MCmc system J. H. Ml!!sr. Jr.
% ster t July 17, 1985 Mr. Samuel Chilk Secretary of the Comission U.S. Nuclear Regulatory Cornission 1717 - H Street N.W.
Washington, D.C. 20555 Cear Mr. Chilk:
Attached is an outline of the Georgia Power presentation on the Readiness Review Pilot Program to the Commissioners which is scheduled for July 26, 1985.
Georgia Pcwer will have the following personnel in attendance:
(speaku)
Mr. Robert W. Scherer, Chairman and CEO Mr. James H. Miller, Jr., President Mr. Richard J. Kelly, Executive Vice President, Power Supply Mr. Ocnald O. Foster, Vice President and General Manager Vogtle Project f
(SpcoKw) Mr. Paul D. Rice, Vice President, Quality Assurance Mr. Jesse T. Beckham, Jr., Vice President, Nuclear Operations Mr. Ruble A. Thomas, Vice President-Licensing, Vogtle Project Mr. Douglas E. Dutton, Vice President Mr. William C. Ramsey, Readiness Review Program Manager, Vogtle Project Ktlk Ries Mr. Scherer and Mr. t ::3 will make our presentation and Mr. O ;...
We expect our presentation rte. %, and I will sit with them at the presenters table.
to last about an hour plus the time necessary for responding to the Commissioner's questions.
Georgia Power Company looks forward to this briefing for the Comissioners on the important concept of Readiness Review.
Sincerely,
./.
er Jr.
Mr. R. W. Scherer j/
cc:
Mr. William Dircks, Executive UTrector for perations NnC Dr. J. Nelson Grace, NRC Region II Administrator
(
r l
jfjo2lg7851003 g
GARDE 85-597 PDR 7
e PART I READINESS REV;EW PROGRAM PRESENTATION R. W. SCHERER I,
Background
o Industry Problem-o Perspective o Interactive Process a NUREG 1055 II.
Perspective o GPC Yogtle Electric Generating Plant o
o Readiness Review III. Objective o GPC In-Depth Self-Assessment o NRC Review and Acceptance IV.
Principles o Pilot Program o NRC/GPC Single Focus / Contact Point o Independence of Technical Review Team o Protocol o Quality Assurance o Conductible within Existing Regulations and Legislative Authority V.
Purpose o Added Assurance Early Identification of Problem oo Structured Early Review o Help Assure Public Safety o Test a Concept
O PART II READINESS REVIEW PROGRAM IMPLEMENTATION W.C. M A*c,s.,
I.
Organization o Readiness Review Executive Board o Readiness Review Staff o Quality Assurance II.
Readiness Review Process o Identification of Commitments o Verify Implementation to Engineering Documents o verify Implementation to Construction Documents o Verify Technical Adequacy of Design o Document Results of Ccmmitment and Verification Process o NRC Review and Acceptance III.
Results o Review of Results to Date e
I f
i
-v
L 4
PART III
)
SUMMARY
R. W. SCHERER 4
o GPC Major Investments o GPC Committed to Quality and Safety o Readiness Review Holds Potential as Improved Assessment Tool o Requires NRC Participation o NRC/GPC Single Focus Contact' o Conductible within Existing Regulations and
. Legislative Authority o Opportunity to Test New Concept o Promise for Future
%