MONTHLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE ocTonyn 4.
19Rs COMPLETw BY n n cnnnvvne TELEPHONE (114) 676-8460 PART A OPERATIONS
SUMMARY
SEPTDfBER 1985 The unit was operated at full power for the month of September except for two load reductions. On 9/4/85 power was reduced to approximately 60% to repair a seal leakoff line on "C" Condensate Pump. On 9/27/85 power was reduced to approximately 67% to perform maintenance at the Intake structure.
C PART B PORV AND SAFETY VALVE
SUMMARY
~
NONE fEzY 0512120450 850930 PDR ADOCK 05000483 CA-#804 R
PDR 05/09/84 QDP-ZZ-04204 Page 1 of 4
Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.
UNIT Callaway DATE OCTOBER 4.1985 R. R. GOODENOW COMPLETED BY TELEPHONE (314) 676-8460 MONTH SEPTEMBER 1985 c
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe Net) i 1094 37 1101 1097 2
ja 1099 1098 1098 3
3,.
4 1032 20 1102 1031 1110 5
21 1094 1105
+
4 22 1095 1117 7
23 1094 1125 8
24 1103 1125 9
3 10 1l13 3
1199 1110 1120 33 27 12 1114 3
776 33 1120 3
909 1122 1105 14 3
1115 15 33 16 es 8804 05'/09/84 Page 2 of 4 QDP-ZZ-04204 w-Vve s
Part D OPERATING DATA REPORT 50-483 DOCKET NO.
Callaway UNIT DATE OCTOBER 4. 1985 R. R. GOODENOW COMPLETED 8Y (314) 676-8460 TELEPHONE OPERATING STATUS 720 SEPTEMBER 1985 gross MOuRS IN REPORTING PERICO:
- 1. REPORTING PERIOD:
3411 MAX. OEPENO. CAPACITY (MWo.Ned:
1170
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWo:
DESIGN ELECTRICAL RATINo tMWo.Neo: 1171*
At stretch reactor power level which is not currently authorized under the operating license.
a
- 3. POWER LEVEL TO WHICH RESTRICTED flF ANY) (MWo. Net):
- 4. REASONS FOR RESTRICTION isF ANYl:
TMtS MONTM VR TO DATE CUMULATIV E r
770 6052 6154.'s
- 5. NUMeER OF MOURS REACTOR WAS CRITICAL 0
0 0
- 8. REACTOR RESERVE ShuTOOWN MOURS 62E 8
- 7. MouRS GENERATOR ON UNE 0
0 0
- 8. UNIT RESERVE SMUTDOWN MOURS 2,399,444 18,566,213 19,567,738
- 9. GROSS THERMAL ENERGY GENER ATED (MWM1 818,945 6,286,642 6,625,822 to. GROSS ELECTRICAL ENERGY GENER ATED (MWMI.
781,346 5,966,562 6.289.585
- 11. NET ELECTRICAL ENERGY GENERATED (MWM) 100%
92.4%
92.77
- 12. mEACTOR SERVICE F ACTOR 100%
92.4%
92.77
- 13. REACTOR AV AILA51UTY F ACTOR 100%
90.67 91.07,
- 14. UNIT SERVICE F ACTOR 100%
90.6%
91.0%
- 15. UNIT AVAILAe:LiTypACTOR 96.9%
81.3%
81.9%
1s. UNIT CAPACITY F ACTOR tumas MDC) 92.7%*
77.8%*
78.47*
- 17. UNIT CAPACITY F ACTOR (Umag Demon MWel 0.0%
5.1%
~ 4.9'r
- 18. UNIT FORCED OUTAGE RATE
- 19. SMUTDOWNS SCHEDULED OVER NEXT 8 MONTMS (TYPt. DATE. ANO OURATION OF E ACNf:
NONE
- 20. IP SMUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OP STARTUP:
CA-#804 05/09/84 Page 3 of 4 QDP-ZZ-04204
4.
+-
.y w--
+-9g.m--7.
o Part E DOCKET NO.
50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE OCTOBER 4, 1985 COMPLETED BY R. R. COODENOW REPORT MONTil SEPTEMBER 1985 TELEPHONE (314) 676-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.
DATE S: SCHEDULED IHOURS)
REASON REDUCING POWER CORRECTIVE ACTIONSFNm8NTS 19 850904 Scheduled 0
B 1
Load reduction to 60% power to repair seal leakoff line on 'C' Condensate Pump.
20 850927 Scheduled 0
B.
1 Load reduction to 67% power to repair leaks at the Intake (First and Second Stage Reheat) and change the oil in the Circulating Water Pumps.
SUMMARY
CA-#804
' 05/09/84 Page 4 of 4 QDP-ZZ-04204
y s
Cdioway Plant October 4, 1985 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1185
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT SEPTEMBER 1985 The enclosed Monthly Operating Report for September 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
/
LP b
S. E. Miltenberger
/
Manager, Callaway Plant
$fEJG MET /WRC/
/drs Enclosure cc: Distribution attached i
Manno Addest P.O. Box 620 Fulton,MO65251
cc distribution for ULNRC-1185 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection 6 Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector