ML20138C064

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1985
ML20138C064
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/30/1985
From: Goodenow R, Miltenberger
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1185, NUDOCS 8512120450
Download: ML20138C064 (6)


Text

,,- '.

MONTHLY OPERATING REPORT DOCKET NO.

50-483 UNIT NAME CALLAWAY UNIT 1 DATE ocTonyn 4.

19Rs COMPLETw BY n n cnnnvvne TELEPHONE (114) 676-8460 PART A OPERATIONS

SUMMARY

SEPTDfBER 1985 The unit was operated at full power for the month of September except for two load reductions. On 9/4/85 power was reduced to approximately 60% to repair a seal leakoff line on "C" Condensate Pump. On 9/27/85 power was reduced to approximately 67% to perform maintenance at the Intake structure.

C PART B PORV AND SAFETY VALVE

SUMMARY

~

NONE fEzY 0512120450 850930 PDR ADOCK 05000483 CA-#804 R

PDR 05/09/84 QDP-ZZ-04204 Page 1 of 4

Part C AVERAGE DAILY UNIT POWER LEVEL 50-483 DOCKET NO.

UNIT Callaway DATE OCTOBER 4.1985 R. R. GOODENOW COMPLETED BY TELEPHONE (314) 676-8460 MONTH SEPTEMBER 1985 c

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe Net) i 1094 37 1101 1097 2

ja 1099 1098 1098 3

3,.

4 1032 20 1102 1031 1110 5

21 1094 1105

+

4 22 1095 1117 7

23 1094 1125 8

24 1103 1125 9

3 10 1l13 3

1199 1110 1120 33 27 12 1114 3

776 33 1120 3

909 1122 1105 14 3

1115 15 33 16 es 8804 05'/09/84 Page 2 of 4 QDP-ZZ-04204 w-Vve s

Part D OPERATING DATA REPORT 50-483 DOCKET NO.

Callaway UNIT DATE OCTOBER 4. 1985 R. R. GOODENOW COMPLETED 8Y (314) 676-8460 TELEPHONE OPERATING STATUS 720 SEPTEMBER 1985 gross MOuRS IN REPORTING PERICO:

1. REPORTING PERIOD:

3411 MAX. OEPENO. CAPACITY (MWo.Ned:

1170

2. CURRENTLY AUTHORIZED POWER LEVEL (MWo:

DESIGN ELECTRICAL RATINo tMWo.Neo: 1171*

At stretch reactor power level which is not currently authorized under the operating license.

a

3. POWER LEVEL TO WHICH RESTRICTED flF ANY) (MWo. Net):
4. REASONS FOR RESTRICTION isF ANYl:

TMtS MONTM VR TO DATE CUMULATIV E r

770 6052 6154.'s

5. NUMeER OF MOURS REACTOR WAS CRITICAL 0

0 0

8. REACTOR RESERVE ShuTOOWN MOURS 62E 8
7. MouRS GENERATOR ON UNE 0

0 0

8. UNIT RESERVE SMUTDOWN MOURS 2,399,444 18,566,213 19,567,738
9. GROSS THERMAL ENERGY GENER ATED (MWM1 818,945 6,286,642 6,625,822 to. GROSS ELECTRICAL ENERGY GENER ATED (MWMI.

781,346 5,966,562 6.289.585

11. NET ELECTRICAL ENERGY GENERATED (MWM) 100%

92.4%

92.77

12. mEACTOR SERVICE F ACTOR 100%

92.4%

92.77

13. REACTOR AV AILA51UTY F ACTOR 100%

90.67 91.07,

14. UNIT SERVICE F ACTOR 100%

90.6%

91.0%

15. UNIT AVAILAe:LiTypACTOR 96.9%

81.3%

81.9%

1s. UNIT CAPACITY F ACTOR tumas MDC) 92.7%*

77.8%*

78.47*

17. UNIT CAPACITY F ACTOR (Umag Demon MWel 0.0%

5.1%

~ 4.9'r

18. UNIT FORCED OUTAGE RATE
19. SMUTDOWNS SCHEDULED OVER NEXT 8 MONTMS (TYPt. DATE. ANO OURATION OF E ACNf:

NONE

20. IP SMUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OP STARTUP:

CA-#804 05/09/84 Page 3 of 4 QDP-ZZ-04204


4.

+-

.y w--

+-9g.m--7.

o Part E DOCKET NO.

50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE OCTOBER 4, 1985 COMPLETED BY R. R. COODENOW REPORT MONTil SEPTEMBER 1985 TELEPHONE (314) 676-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED IHOURS)

REASON REDUCING POWER CORRECTIVE ACTIONSFNm8NTS 19 850904 Scheduled 0

B 1

Load reduction to 60% power to repair seal leakoff line on 'C' Condensate Pump.

20 850927 Scheduled 0

B.

1 Load reduction to 67% power to repair leaks at the Intake (First and Second Stage Reheat) and change the oil in the Circulating Water Pumps.

SUMMARY

CA-#804

' 05/09/84 Page 4 of 4 QDP-ZZ-04204

y s

Cdioway Plant October 4, 1985 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1185

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT SEPTEMBER 1985 The enclosed Monthly Operating Report for September 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

/

LP b

S. E. Miltenberger

/

Manager, Callaway Plant

$fEJG MET /WRC/

/drs Enclosure cc: Distribution attached i

Manno Addest P.O. Box 620 Fulton,MO65251

cc distribution for ULNRC-1185 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection 6 Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector

_