Monthly Operating Rept for Sept 1985
ML20138C064
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/30/1985
From: Goodenow R, Miltenberger
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-1185, NUDOCS 8512120450
Download: ML20138C064 (6)


Text

,,- '.

MONTHLY OPERATING REPORT DOCKET NO. 50-483 UNIT NAME CALLAWAY UNIT 1 DATE ocTonyn 4. 19Rs COMPLETw BY n n cnnnvvne TELEPHONE (114) 676-8460 -

PART A OPERATIONS

SUMMARY

SEPTDfBER 1985 The unit was operated at full power for the month of September except for two load reductions. On 9/4/85 power was reduced to approximately 60% to repair a seal leakoff line on "C" Condensate Pump. On 9/27/85 power was reduced to approximately 67% to perform maintenance at the Intake structure.

C PART B PORV AND SAFETY VALVE

SUMMARY

~

NONE fEzY 0512120450 850930 PDR ADOCK 05000483 CA-#804 R PDR 05/09/84 QDP-ZZ-04204 Page 1 of 4

Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-483 -

UNIT Callaway DATE OCTOBER 4.1985 COMPLETED BY R. R. GOODENOW TELEPHONE (314) 676-8460 MONTH SEPTEMBER 1985 c DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) i 1094 37 1101 2 1097 ja 1099 3

1098 3, . 1098 4 1032 20 1102 5

1031 21 1110

+

4 1094 22 1105 1095 1117 7 23 8

1094 24 1125 1103 1125 9 3 10 1l13 3 1199 33 1110 27 1120 12 1114 3 776 33 1120 3 909 14 1122 3 1105 15 1115 -

33 16 es 8804 05'/09/84 Page 2 of 4 QDP-ZZ-04204

- w-

Part D OPERATING DATA REPORT DOCKET NO.

50-483 UNIT Callaway DATE OCTOBER 4. 1985 R. R. GOODENOW COMPLETED 8Y TELEPHONE (314) 676-8460 OPERATING STATUS SEPTEMBER 1985 gross MOuRS IN REPORTING PERICO: 720

1. REPORTING PERIOD:

3411 MAX. OEPENO. CAPACITY (MWo.Ned: 1170

2. CURRENTLY AUTHORIZED POWER LEVEL (MWo:

DESIGN ELECTRICAL RATINo tMWo.Neo: 1171* At stretch reactor power level which is a not currently authorized under the operating license.

3. POWER LEVEL TO WHICH RESTRICTED flF ANY) (MWo. Net):
4. REASONS FOR RESTRICTION isF ANYl:

r TMtS MONTM VR TO DATE CUMULATIV E 770 6052 6154.'s

5. NUMeER OF MOURS REACTOR WAS CRITICAL 0 0 0
8. REACTOR RESERVE ShuTOOWN MOURS

. 62E 8

7. MouRS GENERATOR ON UNE

' 0 0 0

8. UNIT RESERVE SMUTDOWN MOURS .

2,399,444 18,566,213 19,567,738

9. GROSS THERMAL ENERGY GENER ATED (MWM1 818,945 6,286,642 6,625,822 to. GROSS ELECTRICAL ENERGY GENER ATED (MWMI .

781,346 5,966,562 6.289.585

11. NET ELECTRICAL ENERGY GENERATED (MWM) .

100% 92.4% 92.77

12. mEACTOR SERVICE F ACTOR ,

100% 92.4% 92.77

13. REACTOR AV AILA51UTY F ACTOR ,

100% 90.67 91.07 ,

14. UNIT SERVICE F ACTOR ,, , ,

100% 90.6% 91.0%

15. UNIT AVAILAe:LiTypACTOR 96.9% 81.3% 81.9%

1s. UNIT CAPACITY F ACTOR tumas MDC) .

17. UNIT CAPACITY F ACTOR (Umag Demon MWel . .

92.7%* 77.8%* 78.47*

0.0% 5.1% ~ 4.9'r

18. UNIT FORCED OUTAGE RATE , ,,,
19. SMUTDOWNS SCHEDULED OVER NEXT 8 MONTMS (TYPt. DATE. ANO OURATION OF E ACNf: NONE
20. IP SMUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE OP STARTUP:

CA-#804 05/09/84 Page 3 of 4 QDP-ZZ-04204

- - - . * * ----4. +- .- , . .y - w-- +-9g.m--7.

o .

Part E DOCKET NO. 50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway DATE OCTOBER 4, 1985 COMPLETED BY R. R. COODENOW REPORT MONTil SEPTEMBER 1985 TELEPHONE (314) 676-8460 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO. DATE S: SCHEDULED IHOURS) REASON REDUCING POWER CORRECTIVE ACTIONSFNm8NTS 19 850904 Scheduled 0 B 1 Load reduction to 60% power to repair seal leakoff line on 'C' Condensate Pump.

20 850927 Scheduled 0 B. 1 Load reduction to 67% power to repair leaks at the Intake (First and Second Stage Reheat) and change the oil in the Circulating Water Pumps.

SUMMARY

CA-#804

' 05/09/84 Page 4 of 4 QDP-ZZ-04204

y .

s Cdioway Plant October 4, 1985 Director, Resource Management Nuclear Regulatory Commission Washington, DC 20555 ULNRC-1185

Dear Sir:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT SEPTEMBER 1985 The enclosed Monthly Operating Report for September 1985 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.

/ LP b S. E. Miltenberger /

Manager, Callaway Plant

$fEJG MET /WRC/ /drs Enclosure cc: Distribution attached i

Manno Addest P.O. Box 620 Fulton,MO65251

cc distribution for ULNRC-1185 with enclosures Mr. James G. Keppler Regional Administrator Office of Inspection 6 Enforcement U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 NRC Resident Inspector

- _ , .._. .. _