ML20138B635

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Sept 1985
ML20138B635
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/30/1985
From: Mineck D, Bernard Thomas
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
NRC OFFICE OF ADMINISTRATION (ADM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
DAEC-85-0845, DAEC-85-845, NUDOCS 8510210289
Download: ML20138B635 (8)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

OPD4AflNG DAT A HUNT 00CKET NO. 090-0511 DATE 10-19-89 COMPL Ef tD Oy fire df or d Thomas TEL OHONE 419-M51-7 409 OPER Af tw $f Aftr$

~~~~

Notes

1. tel t Nam Duane Arnoi d Energy Center
2. Report Ing Perlo d Sepiember, 19Hi
3. License d Thorns t Poser (Met):

1694

4. 4swplete Reting (rross Mwe):

%64 (Tur binel S. Design Electrical Reting (Pat Mwel:

98

6. Masleum Depenble Cap eci fy (Cros s Mwel 949
7. Hstion Depanostle Cepecity (4st Mwel:

Sli 8 If Cre+)es occur in Cepeci fy Retings (I tes Nwier 3 Throug5 71 Since the Lost Report, Give new>ns;

9. Posee Level to wh i ch Res tr i c t e d, if Any (Not MWel
10. Roo m s for Restelctions, if Any l

This Hinth Yr-to-fAtte Cu=J l e t i v e Il. H>urs in Rep >r t Ing Per lod 770,0 Aiil.0 91471,0

12. Numer of H)urs Resctor eis Cel tical 770,0 7914,7 64117,9
11. Reectar Reserve $$wt $3sn niurs 0

0 1%0,1

14. It>urs Generefor On-t,ine 770,0 7507,M 614%0,9 li, telt Reser ve inut 43en n.surt 0

0 0

16. rross inermal [nergy Generated (Mwit)

In99494 1990t06 7'Ja %0041

17. Cross Electrical (nor';f Cener sted (MM) 164619 117P,4 00 16713n44
16. Net Electrical (norgy Generated (Mdit) 947136 1094741

?$010894 19 th l t 5.e v ice F ac tor 100,0 in,7 67,n

20. telt Avellebility Factor 100,0_

in,7_

6 7, n 21 thit Cepecify f actor (UsinJ RC Net) 97,1 18,4 97,0

27. telt cepecity f actor tusing Org Net) an,4 79,9 _

49,7 21, to i t f or c e d OJ t e ja H s te 0

0 16,4 24, Shutdjens $che441ed Over Nett 6 42nths (Type, 04te, and Duretion of [vhll mne 25, if $ hut Orion At f n d ot Rep >r t Per iod, tot tnited 0ste of Star tupi N/A (9/77) 05102 $ 02fY1 050930 PDif ADOCK ODOOEl'11 ft putt

k AVECAE DAILV UNIT P0w04 LEVEL s

DOCKET NO. 050-0311 r

4 L. NIT Duane Arnoid Enercy Center DATE 10 13-45 C04PLEf tD BY Bradford Thomas l

TELEPHONE 319-891-7509 MONTH September, 1994 i

DAY AVERAE DAILY PowCR LEVEL DAY AVERA E DAILY PowCR LEVEL (MWe-Net)

(WWe-Net)

]

1 427 17 4A4 3

421 18 496 3

427 19 197 4

416 20 497 420 21 409 6

410 22

.t.2.A.

l 7

406 23 917

[

I Q

400 24 e,77 9

del 25 911 10 4 94 26 911 l

(

11 901 27 921 12 509 28 ilt 13 920 29 977 14 M7 30 Sil i

IS 907 31 16

%1 t

IC$fRtIfl0N1

[

On this format, list the everage delly mit poser level in WWe. Net for each ihr in the reportion auntM. Compute to I

One nearest whole megesett.

I (9/17) r i

j P

4 4

r i

DockCt No. 0 50-0 5 31 Unit Name Duane Arnold Energy Cen ter Date 10-15-85 44JCR/ SAFETY RELATED M41=TE44=CE Completed by Bra #f or d Thomas Telephone 319-851-7309 DATE SYSTE4 CowPO%E%T DESCRIPTION

'. ':/ i 3 / ' S Reactor Core isolatios Coollag RCIC Turbine wechanical Overspeed Refurbished worn linkage in mechanical (RCIC)

Trip Ststee overspeed trip sechanism (See LER 85-035)

CD/C2/C5 Dieset Fire Pues Engine wator Starter Replaced burned out starter CC/IC/85 Fire Detection System Diesel Generator Room Zone Repaired dseage to Instrument cable ledicating unit 02/11/83 Standay Gas Treatment Filter Units

('A' train only)

R emo v e d from service for filter cleaning 02/10/85 Emergency Diesel Generator Dieset Fuel Tank Level I n di ca t ing Rece t t erate d level In dica t i ng s= Itch Switch OD/18/85 Reactor Core isolation Cooling RCIC-to-Vessel inject Valve Replaced torque switc5 In motor operator (See LER 039 pen ding) 02/20/05 Residaal Heat Removal Service RHRSW

'D' Pump Discharge Check Removed from service for planned mater (RMRSw) valve maintenance on pump di sc h arg e valve O

.. ~,. - _.

n

-=

j

..Z

.m.9

. I O

N f

. =4 M

e W

mM n0 1

7 "I en i'

Ch e c CL.

O O

e 8

4 Ch e

f 1

4 1

i Z.

1 OM mOOW D2 i i e i i e i e Type OO> 0 m m x.m.a-i 6 e.

. = a=

7 e3 e to - * - C O e7

-7 c c3

3 3 4 V=

7 9

- -,== e 4 m -e a

- 4

,o * ~ 3 Duration e

m-w x o

,4 O 3. 3 u 3

,e3

  • e

,-4 4

-(Hours)

- oo n

e-4 a m c

am e

Z

=e 0

3 m, <

e 3.

w

-4 c

,O 3,

-4 m

m e -

e o i

m Z

2 o

~

n m -

c.

Reason 0

m e*-

4 m a

3 x

x 33 0

+

V

.F O

V

-4 1

-3 O.

t b

n S

x Z

2

'i Method of E

~

-4 Shutdown e

2 Z

or Power m

3 5

Reduction O

3 o

a

=

4 m

3 e

33 m

a a

4 y

23 23 r-e m

O e

7 O

3 V mn

=

c i

O < e O

, e 3 l,

  • 3 m

==

4 9 CD O

e bit Z

l M

L l

r'

  • 'T ';' 7 f System4 O>xx4 i

Code 4 c m o 7 7 4 3 3 fJ eO c c a

  • l 3 9 It, **

i Component O

5 l.

x=m 8

O Code u on 3

0 9

-4 o C O e M e 6 -

3 0

== n 3

-4

== Jr i

,3 7 e S

  • 4 e w iJ U e 4

3 7 CA O Z e

O e e Z 3 & 4 3 0

+

e% eee u

W W

0 C

-=

==

7 O

c un i

m omm*m D

8 9

O x

-e

< 3 0 m CL

=*

3 e

i 7

O e4 7 7 0

43 w

e 0

3 t

e o

O e

W w

4<

T CF i

C

-=

7 9

W U

7 -

i a

u 7

-=

4 23 m e

  • e 4

3 e7 V W

=4 0

-e u e 9 Q O

7 l

. 8 0 e l I O

CL M

7 4 9 -

3 2

9 W 9 3 9

m ip

== W W

3 e

a

  • O 4 e

rO 3 7 7

i M

m "I C

O 33 O O C

w f"

  • 4 7

=

0 n

mn OO e

4

-e W 3 3

- 3 4 9 4

ee a e

e 1

- e Z

C 33 m

Q f,

s L

l y

.t.

Docket No. 050-0331 Unit Name Duane Arnol d Energy Center Date 10-15-85

'i Completed by Bra df or d Thomas

.sO Telephone 319-851-7309 1:

C REFUELING INFORMATION 1.

Name of facility.

!I

  • i v

A.t Oueno Arnol d Energy Center s

2 Scheduled date for next ref ueling shut down.

i A.

1987 3.

Sche'duled date for restart following refueling.

A.

'1987 4

Will refueling or resumption of operation thereafter require a technical specification change or other li cense amen dment? -

A.

None currently i den t i f ie d -

'5.

Schedule'd date(s) for submitting proposed licensing action end s u p po r f,l t,e g Information.

s A.

None currently i den t i f ie d 6

Important licensing 'consi derations associated with refueling.

e.g.,

new or di f f erent fuel de s i g n or supplier, un rev i ewe d design or perf ormance e

analysis me* o ds, significant changes in f uel. des ign, new operating proce dur e s.

l

- No.

5 7

The number of fuel assemblies (a) In the core and (b) In.the spent fuel storage pool.

\\

4.

a) 363-

.b) 696 i

8 The present.II,consed spent fuel pool storage capacity and the size of

-a,ny. I n cr ea s e in licensed storage capacity that has been requested or is j

, planned, in number of fuel assemblies.

t t

A.

2050 l

m,

<~

9..

' The ;- proj ec't'e d ~ date'of ~ the last refueling that can be discharged to the j

spent fuel pool assuming the present licensed capacity.

' \\1 N

{

A.

1998 i

s- %

e g

?

i I p' 4

a

.s.

s

'I'.

h..

,_m

r__

Docket No. 050-0331 Unit Name Duane Arnold Energy Center Date 10-15-85 l

Completed by Bra dfor d Thomas l

Telephone 319-851-7309 l

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE l

09/01/85 At the beginning of the month the Ouane Arnoi d Energy Center was un der I

normal power operation with 427 MWe (gross) being pro du ce d.

l 09/04/85 At 1050 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.99525e-4 months <br /> the Reactor Core Isolation Cooling (RCIC) System failed a i -

mo n t h l y operability test when the RCIC turbine trippe d on its first manual start.

The plant entered a 7 day LCO.

Repairs were m a ck to the mechanical overspeed trip mechanism and the 7 day LCO was terminated at 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br /> on 9/09/85 (LER 85-035) l 09/06/85 At 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> both airlock doors between the Reactor. an d Turbine Bu i l ding were in a dver t en t l y opened simultaneously, resulting in -a violation of secon dary containment.

(LER 85-038) 09/09/85 At 1425 hours0.0165 days <br />0.396 hours <br />0.00236 weeks <br />5.422125e-4 months <br /> an LCO 'was entered when the diesel fire pump failed to start

~

during an operabllity t e s' t.

A b u r n e d-o u t motor starter was replaced and the test was successf u lly comp lete d.

The LCO was cancelled at 1610 hours0.0186 days <br />0.447 hours <br />0.00266 weeks <br />6.12605e-4 months <br /> on 9/13/85 At 1430 hours0.0166 days <br />0.397 hours <br />0.00236 weeks <br />5.44115e-4 months <br /> it was discovered that during a previous electrical inspection, an open penetration approximately 3 inches in di a me t er was foun d in the fire barrier between the High Pressure Coolant injection (HPCI) end j

Reactor Core Isolation Cooling (RCIC) rooms.

A continuous fire watch was j

established until the penetration could be s ea l e d.

No wiring or other i

equipment was in the penetration, an d fire de t e c t i o n and Suppression equipment was available on both si des of the penetration.

09/10/85 At 1203 hours0.0139 days <br />0.334 hours <br />0.00199 weeks <br />4.577415e-4 months <br /> a 14 day LCO w as~ en tere d when a Stan dby Diesel Generator Room fire zone alarm became I n o p e r a b l e.' The alarm was place d back in service after repairs were done on the Instrument cable, thus en ding the LCO at 1454 hours0.0168 days <br />0.404 hours <br />0.0024 weeks <br />5.53247e-4 months <br /> on 9/12/85 09/11/85 At-0837 hours the

'A' train of the Stan dby Gas Treatment System was remove d from service' for planned filter cleaning, placing the plant in a7 day LCO.

The filters were cleaned, placing the system back in service and en ding the LCO at 1526 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.80643e-4 months <br /> on 9/12/85 09/_12/85 At 1330 hours0.0154 days <br />0.369 hours <br />0.0022 weeks <br />5.06065e-4 months <br /> a momentary secon dary violation occurred when both doors on the Stan dby Gas Treatment Room were opened at the same time.

[

(LER 85-038)

?

09/14/85 At 0828_ hours the plant entered a 30 day LCO when the

'A' Main Steam Line isolation Valve - Leakage Control System (MSIV-LCS) was dec l a r e d inoperable due to a logic relay failure.

The relay prov i des - an annunciator function only on' loss of control power. 'The system was dec lare d operab le when the Operations Department determined control power could be veri f ied re dun dant ly by operators on the MSIV-LCS panel.

The 30 day LCO was then canceled at j

1657 hours0.0192 days <br />0.46 hours <br />0.00274 weeks <br />6.304885e-4 months <br /> on 9/24/85 l

l l

l

Docket No. 050-0331 Unit Name Duane Arnold Eneray Center Date 10-15-85 Completed by Bradf ord Thomas Telephone 319-851-7309 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE (Con tin ued)-

09/16/85 At 0440 hours0.00509 days <br />0.122 hours <br />7.275132e-4 weeks <br />1.6742e-4 months <br /> a 7 day LCO was entered when the

'B' Emergency Diesel Generator was declared Inoperable upon falling a monthly operability test.

The diesel fuel oil transfer pump'had failed to supply the required amount of fuel to the day tank.

A faulty limit switch was recalibrated and tested satisfactorily, thus ending the LCO at 1538 hours0.0178 days <br />0.427 hours <br />0.00254 weeks <br />5.85209e-4 months <br />.

09/18/85 At 1018 hours0.0118 days <br />0.283 hours <br />0.00168 weeks <br />3.87349e-4 months <br /> during the RCIC operability test, a RCIC-to-vessel injection valve failed to open on command placing the plant in a 7 day LCO.

The torque switch in the motor operator was replaced and the test was successfully completed at 1951 hours0.0226 days <br />0.542 hours <br />0.00323 weeks <br />7.423555e-4 months <br /> on 9/19/85, thus ending the LCO.

(LER 85-039 pending) 09/24/85 At 0510 hours0.0059 days <br />0.142 hours <br />8.43254e-4 weeks <br />1.94055e-4 months <br /> the

'D' RHRSW pump was removed from service entering a 30 day LCO for planned maintenance. The pump discharge check valve was overhauled and placed back in service at i200 on 9/27, thus ending the LCO.

09/26/85 At 0833 hours0.00964 days <br />0.231 hours <br />0.00138 weeks <br />3.169565e-4 months <br /> the

'D' MSIV-LCS was declared inoperable for repairs on a flow transmitting device.

A 30 day LCO commenced, which was in day 5 at the end of the month.

At 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> the Emergency Notification System was declared inoperable.

AT&T was notified and the system was placed back In service at 2030 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.72415e-4 months <br />.

09/30/85 At 0610 hours0.00706 days <br />0.169 hours <br />0.00101 weeks <br />2.32105e-4 months <br /> the

'B' RHRSW pump was removed from service for planned maintenance on the pump discharge check valve.

A 30 day LCO was entered.

.The plant was in normal power operation with 571 MWa (gross) going out to the grid.

We remained in a 30. day LCO for repairs on the

'D' MSIV-LCS and a 30 day LCO for maintenance on the

'B' RHRSW p ump discharge check valve.

Iowa Electric Light and Ibwer Company October 15, 1985 DAEC 0845 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attn: Doctsnent Control Desk

Subject:

Duane Arnold Energy Center Docket No. 50-331 Op. License DPR-49 September, 1985 Monthly Operating Report

Dear Sirs:

Please find enclosed 12 copies of the Duane Arnold Energy Center Monthly Operating Report for September, 1985. The report.has been prepared in accordance with the guidelines of Regulatory Guide 1.16 and distribution has been made in accordance with DAEC Technical Specifications, Appendix A, Section 6.11.1.c and Regulatory Guide 10.1.

l Very truly yours, i

JJ$~f Daniel L. Mineck P1 ant Superintendent - Nuclear Duane Arnold Energy Center Enclosures File A-118d, TE-5 cc: Director, Office of Inspection Mr. Phillip Ross and Enforcement U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Corr.nission Maryland National Bank Building Region III Washington, D. C.

20555 799 Roosevelt Road i

Glen Ellyn, IL 60137 (1)

NRC Resident Inspector Director, Office of Management and Mr. Dennis Murdock Program Analysis Central Iowa Power Cooperative U. S. Nuclear Regulatory Cownission Box 2517

. Washington, D. C. 20555 (1)

Marion, IA 52302

~r U. S. Nuclear Regulatory Commission Mr. Russ Gamble ATTN: Mr. M. Thadani Corn Belt Power Cooperative Phillips Building 1300 13th Street North Washington, D. C. 20555 Humboldt, IA 50543 INP0 Records Center-1100 Circle 75 Parkway

/

Suite 1500 Atlanta, GA 30339 g

~ 1:encrul Offier_

  • l%L Iks.\\ M1
  • Cettsr liapids, lemn M40G
  • 319f39W4411

-~

. _..,, -, _. - -