October 11, 1985 o
Docket No. 50-29 LS05-85-10-018 Mr. George Papanic, Jr.
Senior Project Engineer-Licensing Yankee Atomic Electric Company M71 Worcester Road Framingham, Massachusetts 01701
Dear Mr. Papanic:
SUBJECT:
CYCLE 17 OPERATION BEY 0flD 15,000 MWD /MTU Re:
Yankee Nuclear Pever Station (Yankee)
Your letter dated October 2,1985, identified the likelihood of operating the-Yankee plant up to a core burnup of 15,200 MWD /MTU. The maximum. core burnup shown in the TS figures is 15,000 MKD/MTU.
Your estimate of the final fuel exposure to be reached before shutdown for the refueling outage is 15,108 MWD /MTV, and you used a conservative value of 15,200 MWD /MTU in-your evaluation.
We have evaluated the safety implications of operating the Yankee facility up to 15,200 liKD/MTU for Cycle 17. The power level during the six-day period of operation (October 13 through 19,1985) beyond 15,000 WD/MTU fuel burnup will be cpproximately 70% of rated thermal power due to the power coastdown.
This provides a significant margin to the LHGR limit of Figure 3.2-1, with lirear extrapolation of the curve from 15,000 MWD /MTV to 15,200 MWD /MTU.
In eddition, cperation at less than 70% power level places Yankee in compliance with the action statement without having reached the action level. Yankee would thus rcmain in compliance with the TS through October 19, 1985.
The staff has detennined that operation of the Yanke plant to 15,200 MWD /MTU is therefore acceptable.
Sincerely, Origins 1 signed by:
John A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing cc: See rext page DISTRIBUTION Docket File JPartlow t'RC FDR CJamerson Local PDR MVirgilio ORB #5 Reading JZwolinski HThompson JClifford 6b)
OELD EJordan BGrimes HEichenholtz, RI 8I ACRS(10) g DL:AD/SA'$8' DL:0RB#5G DL:Odi5 DL:0R #5 CJamerson JClifford:tm JZwolinski DCrutchfield 10/gt7/85 10//0/85 10/10/85 10/ /85 N'V4KMppeJ f ""
k/okthf
p l'
Mr. George Papanic, Jr.
Yankee Atomic Electric Company Yankee Nuclear Power Station cc:
Mr. James E. Tribble, President Yankee Atomic Electric Company 1671 Worcester Road Freminghan, Massachusetts 01701 Thomas Dignan, Esquire Ropes and Gray 225 Franklin Street Boston, Massachusetts 02110 Mr. N. N. St. Laurent Plant Superintendent Yankee Atomic Electric Company Star Route Rowe, Massachusetts 01367 Chairman Board of Selectmen Town of Rowe Rowe, Massachusetts 01367 Resident Inspector Yankee Nuclear Power Station c/o U.S. NRC Post Office Box 28 Monroe Bridge, Massachusetts 01350 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 7th Floor Boston, Massachusetts 02111
,