Informs That Alternatives for Providing Alternate Shutdown Capability for 4,160-volt Switchgear Room Being Evaluated. Evaluation Should Be Completed by Nov 1985
ML20138B298
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/04/1985
From: Britt R
WISCONSIN ELECTRIC POWER CO.
To: Butcher E, Harold Denton
Office of Nuclear Reactor Regulation
References
CON-NRC-85-108 VPNPD-85-458, NUDOCS 8510150314
Download: ML20138B298 (1)


Text

,

8 Rfsconsin Electnc mancoumr 231 W. MICHIGAN. P.O. BOX 2046. MILWAUKEE, WI 53201 VPNPD-85-458 NRC-85-108 October 4, 1985 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 i

Attention:

Mr. Edward Butcher, Acting Chief Operating Reactors, Branch 3 Gentlemen:

DOCKET NOS. 50-266 AND 50-301 FIRE PROTECTION REQUIREMENTS 4160-VOLT SWITCHGEAR ROOM POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 By letter dated June 30, 1982, we requested several exemptions from the requirements of 10 CFR 50, Appendix R.

One of those exemptions concerned the 4160-volt switch' ear room.

This g

exemption was denied in.your letter dated August 21, 1985.

This letter is to inform you that we are currently evaluating different alternatives for providing alternate shutdown capability for the 4160-volt switchgear room.

We expect to complete our evaluation of these options in November 1985.. Following our evaluation, we suggest'a meeting to discuss our plans for providing alternate shutdown capability for the switchgear room.

Should you have any questions concerning thic matter, please contact us.

Very truly yours,

[dV R. W. Britt 8510150314 851004 President PDR ADOCK 0500024 -

$0 {

p PDR L. g l Copy to NRC Resident Inspector 0

. -.