ML20138B239
| ML20138B239 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/08/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Kelly R GEORGIA POWER CO. |
| Shared Package | |
| ML20138B244 | List: |
| References | |
| NUDOCS 8510150296 | |
| Download: ML20138B239 (2) | |
See also: IR 05000321/1985029
Text
_.
_
_
_
. . .
.
SAFEGUARDS INFORMATION
OCT 08 N
sartcuaDS
4YT094;gg1
R9;mg
Georgia Power Company
ATTN:
Mr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: REPORT N05. 50-321/85-29 AND 50-366/85-29
7
On September 16-20, 1985, NRC inspected activities authorized by NRC Operating
License Nos. DPR-57 and NPF-5 for your Hatch facility. At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed inspection report,
,
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with gersonnel, and observation of activities
in progress.
Within the scope of the inspection, no siolations or deviations were identified.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in NRC's Public Document Room.
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget issued under the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please contact us.
Sincerely,
Virgil L. Brownlee, Chief
Reactor Projects Branch 2
Division of Reactor Projects
Enclosure:
(See page 2)
i
951015029 8
EMCLOSURE CONTAINS
-
A
1
SA7CGUADDS INFORMATI
DR
UPCt SEPARATION THIS
PAGE IS DECONTROLLED
SAFEGUARDS INFORMATION-
$06
.'?
i
)
1
SAFEGUARDS INFORMATIONi
-
,
Georgia Power Company
2
0CT 081985
Enclosure:
Inspection Report Nos. 50-321/85-29
and 50-366/85-29
-(Safeguards Information)
cc w/ enc 1:
J. T. Beckham, Vice President and
General Manager-Nuclear Generation
H. C. Nix, Site General Manager
P. E. Fornel, Site QA Supervisor
bec w/ encl:
NRC Resident Inspector
Htgh S. Jordan, Executive Secretary
'
IE Mail and File
Central Files
IE File
NMSS/SGPL
NRR/DL/SSPB ,
bec w/ Inspection Summary:
Document Control Desk, 016
State of Georgia
RII
R
r$1T
AI
RIJ
R
OMa
- bhg
re
arr
tohr
.ciera
/ VBrownlee
1!/'/85
10/7/85
10/0F/85
/85
10/')/85
10/ /85
g
ENCLOSURE CONTAIN6
SAFEGUARDS INFORMATION gl5;;8 g; y,',2**
PACE IS DECONTROLLED.