ML20138B239

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-321/85-29 & 50-366/85-29 on 850916-20.No Violations or Deviations Noted
ML20138B239
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/08/1985
From: Brownlee V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kelly R
GEORGIA POWER CO.
Shared Package
ML20138B244 List:
References
NUDOCS 8510150296
Download: ML20138B239 (2)


See also: IR 05000321/1985029

Text

_.

_

_

_

. . .

.

SAFEGUARDS INFORMATION

OCT 08 N

sartcuaDS

4YT094;gg1

R9;mg

Georgia Power Company

ATTN:

Mr. R. J. Kelly

Executive Vice President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: REPORT N05. 50-321/85-29 AND 50-366/85-29

7

On September 16-20, 1985, NRC inspected activities authorized by NRC Operating

License Nos. DPR-57 and NPF-5 for your Hatch facility. At the conclusion of the

inspection, the findings were discussed with those members of your staff

identified in the enclosed inspection report,

,

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with gersonnel, and observation of activities

in progress.

Within the scope of the inspection, no siolations or deviations were identified.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

In accordance with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and

security measures are exempt from public disclosure; therefore, the enclosures to

this letter, with the exception of the report cover page which presents a

nonexempt summary, will not be placed in NRC's Public Document Room.

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget issued under the

Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this letter, please contact us.

Sincerely,

Virgil L. Brownlee, Chief

Reactor Projects Branch 2

Division of Reactor Projects

Enclosure:

(See page 2)

i

951015029 8

EMCLOSURE CONTAINS

-

PDR

A

1

SA7CGUADDS INFORMATI

DR

UPCt SEPARATION THIS

PAGE IS DECONTROLLED

SAFEGUARDS INFORMATION-

$06

.'?

i

)

1

SAFEGUARDS INFORMATIONi

-

,

Georgia Power Company

2

0CT 081985

Enclosure:

Inspection Report Nos. 50-321/85-29

and 50-366/85-29

-(Safeguards Information)

cc w/ enc 1:

J. T. Beckham, Vice President and

General Manager-Nuclear Generation

H. C. Nix, Site General Manager

P. E. Fornel, Site QA Supervisor

bec w/ encl:

NRC Resident Inspector

Htgh S. Jordan, Executive Secretary

'

IE Mail and File

Central Files

IE File

NMSS/SGPL

NRR/DL/SSPB ,

bec w/ Inspection Summary:

Document Control Desk, 016

State of Georgia

RII

R

r$1T

AI

RIJ

R

OMa

bhg

re

arr

tohr

VP

.ciera

/ VBrownlee

1!/'/85

10/7/85

10/0F/85

/85

10/')/85

10/ /85

g

ENCLOSURE CONTAIN6

SAFEGUARDS INFORMATION gl5;;8 g; y,',2**

PACE IS DECONTROLLED.