SAFEGUARDS INFORMATION
a
-
.
MAR 131986
~ Tennessee Valley Authority
ATTN:
Mr. S. A. White
. Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
REPORT NOS. 50-327/86-10 AND 50-328/86-10
On January 28 - February 7,
1986, NRC inspected activities authorized by NRC
Operating License Nos. DPR-77 and DPR-79 for your.Sequoyah Nuclear facility. At
the conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
In accordance'with 10 CFR 2.790(d) and 10 CFR 73.21, safeguards activities and
security measures are exempt from public disclosure; therefore, the enclosures.to
this letter, with the exception of the report cover page which presents a
nonexempt summary, will not be placed in NRC's Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
i
David M. Verrelli, Chief
Reactor Projects Branch 1
Division of Reactor Projects
Enclosure:
--
-
Inspection Report Nos. 50-327/86-10
and 50-328/86-10
(Safeguards Information)
cc w/ encl:
(See page 2)
8603200280860gg
ADOM 0%
CL
rJRE CONTAINS
0
cPoli r,
OMATIOi
gp,FEG'.loPDS is0RMAT!ON
P4ac 1Q'ylfu{n1s .
, ,,,
d'OM il
i
.
--
. ---
' SAFEGUARDS INFORMATION
.
.
Tennessee Valley Authority
2
cc w/ encl:
H.-L. Abercrombie, Sequoyah Nuclear Plant
Site Director
P. R. Wallace, Plant Manager
K. W. Whitt, Chief, Nuclear
Safety Review Staff
D. L. Williams, Jr. , Superviser
Licensing Section
G. B. Kirk, Compliance Staff Supervisor
J. E.: Wills, Project Engineer
bec w/ encl:
IE File
NMSS/SGPL
NRR/DL/SSPB
bec w/ Inspection Summary:
J. N. Grace
J. A. Olshinski
H. R. Denton, NRR
H. L. Thompson, NRR
J. M. Taylor, IE
B. B. Hayes, 0I
Document Control Desk, OI6
NRC Resident Inspector
State of Tennessee
t
i
~
.-
/
RII
II
RII
,
(6
pPStohr
WTobin:tdg
.
yire
KBarr
SWe se
03/g/86
03/5/86
Oj//)/86
OS/ja/86
6
3 0fN
ENCLOSURE CONTAINS
SMEGUARDS I;'70924 TION
"
SAFEGUARDS INFORMATION
eEE*ftllo,'s'JQ'
2
-
. .
-
_.
.
-
-
-
-
..