Ro:Fire Seal Evaluation Program in Support of Resolution of LER 2-83-95 Continuing.Accomplishments Include Issuance of Spec for Selection & Installation of Selected Fire Barrier Penetration Seals in Conjunction W/New Detail Drawings
ML20138A805
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 11/20/1985
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8512120115
Download: ML20138A805 (2)


Text

f; 3-T, ..

I CD&L .

Carolina Power & Light Company

'55 NOV27 A 8i 23 Brunswick Steam Electric Plant P. O. Box 10429 Southport,.NC 28461-0429 November 20, 1985 FILE: B09-13510C SERIAL: BSEP/85-1858 Dr. J. Nelson Grace, Administrator U.S. Nuclear Regulatory Commission Suite'2900 101 Marietta Street hV Atlanta, GA 30323 BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 DOCKET NO. 50-324 LICENSE NO. DPR-62 LICENSEE EVENT REPORT 2-83-95 STATUS OF LE* "SSOLUTION/ FIRE SEAL EVALUATION PROGRAM

Dear Dr. Grace:

In Carolina Power & Light's (CP&L) letter of January 29, 1985 (Serial BSEP/85-0091), CP&L conveyed that an update report of progress on the resolution of LER 2-83-95 would be transmitted to your office by January 31, 1986.

The accomplishments of the Fire Seal Evaluation Program to date ue:

1. The plant penetration seal verification / survey effort is continuing. The data collected is being used to quantify a penetration seal data base. In addition, verifications / surveys along with other efforts of the project (e.g., survey of vendors and other utilities) are being conducted.
2. A specification for the selection and installation of selected fire barrier penetration seals in conjunction with new fire barrier penetration seal installation detail drawings has been issued.
3. Currently, areas with fire barrier penetration seals which have not yet been qualified have fire watches posted in accordance with technical specifications until qualification of the penetration seal is established.

8512120115 851120 PDR ADOCK 05000324 S PDR 1

' t reAA  ;

k; *

  • Dr. J. Nelson Grace The BSEP Fire Seal Evaluation Program will continue with appropriate rework of penetration seals being accomplished as evaluations and design reviews are completed.

Very truly yours, ig C. R. Dietz, General Manager Brunswick Steam Electric Plant RMP/rla Enclosure cc: NRC Document Control Desk i

!